• 제목/요약/키워드: risk assessment

검색결과 5,408건 처리시간 0.039초

석유화학단지의 휘발성 유기화합물로 인한 인체 위해도 평가에 관한 연구 (A Study on the Health Risk Assessment of Volatile Organic Compounds in a Petrochemical Complex)

  • 이진홍;김윤신;류영태;유인석
    • 한국대기환경학회지
    • /
    • 제13권4호
    • /
    • pp.257-267
    • /
    • 1997
  • This study focuses on the health risk assessment of airborne volatile organic compounds (VOCs) in a petrochemical complex, with several emphases on a risk assessment method. The first emphasis is on the importance of hazard identification to determine the likely carcinogenic potential of a VOC. Without considering this type of information, a direct comparison of the carcinogenic risks of two pollutants is meaningless. Therefore, wer suggest that this type of information be prepared and be listed with the estimate of cancer risk in parallel. The second emphasis is on the selection of a better dose-response model to estimate unit risk or cancer potency factor of a carcinogenic VOC. Finally, probilistic risk assessment method is discussed and recommended to use within a comparison of conventional point-estimate method. A health risk assessment has also been carried out. For non-carcinogenic risk, even the highest hazard index for carbon tetrachloride is estimated to be less than 1 with the other VOCs less than 0.03. However, the lifetime cancer risk from the inhalation of airborne VOCs is estimated to be about $2.6 \times 10^{-4}$ which is higher than the risk standard of $10^{-6}$ or even $10^{-5}$. Therefore, the investigation into domestic petrochemical complexes should be strengthened to obtain more fine long-term airborne VOC data.

  • PDF

화력발전설비 위험도 평가를 통한 기기별 정비주기 예측 (Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants)

  • 송기욱;김범신;최우성;박명수
    • 대한기계학회논문집A
    • /
    • 제37권10호
    • /
    • pp.1291-1296
    • /
    • 2013
  • 위험도 평가 기술은 주로 플랜트의 많은 운영설비 중 대형사고나 피해를 유발할 수 있는 위험설비를 선별하는 목적으로 개발되었다. 설비의 위험도를 평가하여 위험도의 크기에 따라 순위를 정하고 이 순위를 기준으로 정비자원을 투입하는 순서나 정비작업의 시급성을 판단한다. 위험도란 고장이 발생할 확률과 고장이 발생할 경우에 수반되는 파손피해의 곱으로 정의된다. 위험도 평가방법으로는 간단한 손상 및 고장 평가기법을 이용하여 기본적인 고장확률 데이터를 확보하고 정성적인 문진을 통해 이를 보완하는 준 정량적 방법이 많이 사용되고 있다. 본 논문에서는 준 정략적 평가를 이용하여 석탄화력발전소의 보일러설비에 대한 위험도 평가를 수행하고 이를 기반으로 설비 별차기 정비주기를 선정하였다.

환경오염물질의 건강위해성 평가 (Health Risk Assessment on Environmental Pollutants)

  • 신동천
    • 환경위생공학
    • /
    • 제8권2호
    • /
    • pp.11-24
    • /
    • 1993
  • Methodology for health risk assessment has been developed by governmental agencies and research institutions in the United States concerning environmental and industrial health such as Environmental Protection Agency, Pood and Drug Administration, and Occupational Safety and Health Administration. The basic concept, process, and scientific rational of the health risk assessment are discussed in order to introduce this field of research for future application to risk assessment and management in Korea. As environmental criteria for most of the environmental carcinogens and nonfarcinogens are set based on the quantitative risk assessment, this quantitative methodology should be emphasized and studied in Korean situation.

  • PDF

GIS기반 산사태재해의 정량적 피해 산정을 위한 고려사항 분석 (Considerations for Quantitative Risk Assessment of Landslides using GIS)

  • 김정옥;김지영;김효중;김용일
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.645-648
    • /
    • 2008
  • This study provides considerations for quantitative risk assessment of landslide on GIS technology. It shows how the landslide possibility analysis is linked by GIS modeling to provide loss estimation tools for landslide hazards in support of socio-economic loss reduction efforts. Those risk assessment results can deliver factual damage situation prediction to policy making for the landslide damage mitigation.

  • PDF

국내 건설업체의 위험성평가 실태조사 기초 연구 (A Basic Study on the Risk Assessment of Domestic Construction Companies)

  • 박환표;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.240-241
    • /
    • 2019
  • Construction disasters have more distinctive characteristics than other industrial disasters. Since it is likely that construction disasters will spread to severe accidents, the accident mortality rate is very high compared to the disaster incidence rate. Therefore, the purpose of this study is to compare and analyze the operation status of construction risk assessment by domestic large and medium sized construction companies to prepare improvement direction of risk assessment system. The survey results for safety management experts of construction companies are as follows: Large companies have developed and utilized risk assessment systems in their respective companies, while small and medium construction companies have developed and evaluated risk factors through the Excel program. Rather than performing risk assessment tasks based on historical safety accident data, construction companies have limitations in developing risk factors and preparing solutions with suppliers for each major construction. Therefore, it is necessary to prepare a risk assessment system in the future by analyzing the types of safety accidents, such as the safety accident data of each company as well as the safety accident data.

  • PDF

DEVELOPMENT OF AN INTEGRATED RISK ASSESSMENT FRAMEWORK FOR INTERNAL/EXTERNAL EVENTS AND ALL POWER MODES

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • 제44권5호
    • /
    • pp.459-470
    • /
    • 2012
  • From the PSA point of view, the Fukushima accident of Japan in 2011 reveals some issues to be re-considered and/or improved in the PSA such as the limited scope of the PSA, site risk, etc. KAERI (Korea Atomic Energy Research Institute) has performed researches on the development of an integrated risk assessment framework related to some issues arisen after the Fukushima accident. This framework can cover the internal PSA model and external PSA models (fire, flooding, and seismic PSA models) in the full power and the low power-shutdown modes. This framework also integrates level 1, 2 and 3 PSA to quantify the risk of nuclear facilities more efficiently and consistently. We expect that this framework will be helpful to resolve the issue regarding the limited scope of PSA and to reduce some inconsistencies that might exist between (1) the internal and external PSA, and (2) full power mode PSA and low power-shutdown PSA models. In addition, KAERI is starting researches related to the extreme external events, the risk assessment of spent fuel pool, and the site risk. These emerging issues will be incorporated into the integrated risk assessment framework. In this paper the integrated risk assessment framework and the research activities on the emerging issues are outlined.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • 제28권6호
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

안전교육의 효과성 향상에 관한 연구 - 제조업 위험성평가 담당자 교육을 중심으로 - (A Study on the Effectiveness Improvement of Safety Education - Focused on the Education of Manufacturing Risk Assessment Officer -)

  • 김진억
    • 한국재난정보학회 논문집
    • /
    • 제19권1호
    • /
    • pp.97-104
    • /
    • 2023
  • 연구목적: 안전보건공단에서는 위험성평가를 용이하게 하기 위해 웹 기반의 KRAS 개발하여 각 사업장의 유형별 평가 모델을 제공하고 있다. 위험성평가의 이해를 돕기위해 민간 기관에서는 위험성평가 담당자 교육을 개설하여 운영하고 있다. 기업의 규모에 따른 제조업 위험성평가 담당자 교육의 효과성을 분석할 것이다. 연구방법: 2017년부터 2021년까지 5년 이내 위험성평가 담당자 교육을 이수한 670개 사업장을 대상으로 SPSS 22를 이용하여, 재해 발생 관련 데이터를 통해, 100인을 기준으로 100인 미만 집단과 100인 이상 집단을 나누어 상관분석과, t-검정을 통해 재해율을 분석하였다. 연구결과: 가설 1번~5번 채택, 5~8번 기각 되었다. 결론: 100인 이상의 기업 교육을 대상으로 한 기업의 규모에 따른 교육과정의 편성을 고려하고 위험성평가 인정 시의 혜택을 상향하는 부분에 대하여 제고해 볼 수 있다.

이동식크레인 작업의 중대재해예방을 위한 표준 리스크 평가 지수 개발 (건설업을 중심으로) (Development of Standard Risk Indicators for the Prevention of Serious Accidents in Mobile Crane Operations (Focused on Construction Industry))

  • 최종국;이종우
    • 한국재난정보학회 논문집
    • /
    • 제19권3호
    • /
    • pp.719-728
    • /
    • 2023
  • 연구목적: 이동식크레인은 높은 사망률에 기여하는 기계로 최근 6년간(2016~2021) 사고사망사례 중 건설업 2,574건을 분석한 고위험요인(SIF)정보에서 이동식크레인의 사고는 총 61건의 재해가 발생하였다. 현장의 안전대책에도 불구하고 제대로 활용이 안되고 있다. 본 연구에서는 표준 리스크 평가 지수를 제시하여 사고예방에 기여하고자 한다. 연구방법: 전문가 면담과 사망사고 사례분석, 현장실태분석, 문헌조사를 통해 위험성평가의 4M방식의 표준 리스크 평가 지수 방법을 제시하고자 한다. 연구결과: 현장 8개현장 위험성평가를 분석한 결과 재해예방에 실질적인 기여를 할 수 없다는 결론을 얻었으며, 표준 리스크 평가 지수 방식의 개선방안으로 적용하여야 한다. 결론: 건설현장에서 표준 리스크 평가 지수방식으로 전환함으로써 안전보건관계자 및 근로자가 쉽게 이용할 수 있고 재해감소에 기여할 수 있을 것으로 제안한다.