• Title/Summary/Keyword: risk assesment

Search Result 119, Processing Time 0.021 seconds

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

Is the Precautionary Principle Unscientific?: 'Rationality' of the Precautionary Principle and its Conflicts with Risk Analysis Framework (사전주의의 원칙은 비과학적인가?: 위험 분석과의 논쟁을 통해 본 사전주의 원칙의 '합리성')

  • Ha, Dae-Cheong
    • Journal of Science and Technology Studies
    • /
    • v.10 no.2
    • /
    • pp.143-174
    • /
    • 2010
  • How can a regulatory policy to address potential hazards be made legitimate in the face of scientific uncertainty? The precautionary principle has been gradually regarded as the most persuasive answer to this intricate question in Europe since the 1970s and generally recognized as a guiding principle in international environmental law. This principle, however, has often been subject to diverse concerns and criticisms due to its vague definition. This article tries to elaborate the precautionary principle while reviewing both the validity and unreasonableness of these criticisms over this principle. Then, this article explores the policy relevance of this principle by applying this elaborated definition to the concrete case of risk governance such as the risk assesment of food safety. In the end, this paper emphasizes the fact that the precautionary principle can be applied in the field of risk governance, refuting the argument that the precautionary principle is only a moral attitude or a political position.

  • PDF

A Study on Risk Analysis of Manufacturing Process Using the Bow-Tie Method (Bow-Tie기법을 이용한 제조공정의 위험성평가 연구)

  • Tae, Chan Ho;Lee, Heon Seok;Byun, Chul Hyun;Yang, Jae Mo;Park, Chulhwan;Ko, Jae Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.3
    • /
    • pp.33-38
    • /
    • 2013
  • The chemical industries have used large amounts of chemicals. If an accident occurs, it caused physical and human damage. We intended to investigate risk assessment for the prevention of accidents. The risk assessment by HAZOP technique has been applide to major chemical industries, and that result has been utilized efficiently. In this study, we analyzed Bow-Tie and HAZOP technique, and risk assesment was performed by Bow-Tie on toxic material process. As a result, the risk that can not be found in the risk assessment of the other is derived, and improvements of 14 to remove the dangers derived. Bow-Tie risk assessment is suitable to derive the applicability of risk factors in the field and to establish the improvement measures.

The effect of a risk factor on quantitative risk assessment in railway tunnel (철도터널에서 위험인자가 정량적 위험도 평가에 미치는 영향)

  • Yoo, Ji-Oh;Kim, Jin-Su;Rie, Dong-Ho;Shin, Hyun-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.117-125
    • /
    • 2015
  • Quantitative risk assessment (QRA) of railway is to create a variety of scenario and to quantify the degree of risk by a result of the product of accident frequency and accident. Quantitative risk Assessment is affected by various factors such as tunnel specifications, characteristics of the fire, and relation of smoke control and evacuation direction. So in this study, it is conducted that how the way of smoke control and the relation of smoke control and evacuation direction affect quantitative risk assessment with variables (the tunnel length (2, 3, 4, 5, 6 km) and the slope (5, 15, 25‰)). As the result, in a train fire at the double track tunnel (Area = $97m^2$), it is most efficient to evacuate to the opposite direction of smoke control regardless of the location of train in train fire. In addition, under the same condition, index risk in mechanical ventilation up to 1/10.

OVERVIEW OF HEALTH PHYSICS STUDIES ON TRITIUM BETA RADIATION (삼중수소 베타방사선에 관한 보건물리 연구의 적용)

  • Hwang, Sun-Tae;Hah, Suk-Ho
    • Progress in Medical Physics
    • /
    • v.5 no.1
    • /
    • pp.75-85
    • /
    • 1994
  • As we enter the 2000s, there are four nuclear power units of the pressurized heavy water reactor-type in the commercial operation at the Wolsung Nuclear Power Plant(NPP) site where a larger amount of tritium ($\^$3/H) is released inevitably to the site environment. This radioctive nuclide is easily distributed throghout our environment because of its ubiquitous form as tritiated water (HTO) and its persistence in the environment. Tritum has certain characterisitics that present unique challenges for beta radiation dosimety and health risk assesment. In this paper, therefore, a variety of matters on tritium are considered and reviewed in terms of its characteristics and sources, metabolism and dosimetry, microdosimetry, radiobiology, risk assessment, and transport and cycling in the environment, etc.

  • PDF

Risk analysis of road cave-in of storm sewer lateral using zoom camera (줌카메라를 활용한 빗물받이 연결관의 도로함몰 리스크 분석)

  • Han, Sangjong;Hwang, Hwankook
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.6
    • /
    • pp.681-690
    • /
    • 2014
  • It is known that sewer problems are the major causes of road cave-in. The objective of this study is to analyze the risk of road cave-in due to storm sewer laterals. We investigated 174 storm sewer laterals using a zoom camera at O-dong area in Seoul. The causes of road cave-in were classified into five cases: breakage of rigid pipe, deformation of flexible pipe, out of pipeline alignment, changing pipe material or changing pipe diameter, and a poor linkage between lateral and sewer. In addition, all defects were sorted into five grades based on the severity rating at storm sewer laterals. In this study, the most fragile pipe materials were found to be concrete pipe and polyethylene pipe, which recorded 2.3 and 1.69 defect rates. With regard to the causes of road cave-in, deformation of flexible pipe has a large influence on road cave-in at present. On a long-term basis, the two causes, out of pipeline alignment and a poor linkage between lateral and sewer, could have more influence on road cave-in.

Qualitative Human Error Assessment for Gas Facilities (가스시설에서의 정성적 인적오류 평가)

  • Yoon Ik-Keun;Ha Jong-Mann;Oh Shin-kyu
    • Journal of the Korean Institute of Gas
    • /
    • v.2 no.3
    • /
    • pp.70-77
    • /
    • 1998
  • This study proposes a method to facilitate the identification of human error in calling out such qualitative risk assessment in Gas plants. The main idea of this method is based on the scheme of existing qualitative risk assesment technique. The guidewords and tabular worksheet are suggested to be compatible in human error analysis. By using this method developed, the maintenance procedure of Governor system in gas valve station was analyzed to discover the human error in maintenance tasks. As a consequence, certain human errors were identified and the suggested approches proved to be adequate technique for the human error analysis.

  • PDF

A study on quantitative risk assessment for railway Tunnel fire (철도터널에서 차량화재시 정량적 위험도 평가에 관한 연구)

  • Yoo, Ji-Oh;Nam, Chang-Ho;Jo, Hyeong-Je;Kim, Jong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.307-319
    • /
    • 2010
  • As we learned in Daegu subway fire accident, fire in the railway tunnel is prone to develop to large disaster due to the limitation of smoke control and smoke exhaust. In railway tunnel, in order to ensure fire safety, fire prevention and fighting systems are installed by quantitative risk assessment results. Therefore, in this research, developed the program to establish quantitative risk assessment and suggested quantitative safety assessment method including fire scenarios in railway tunnel, fire and evacuation analysis model, fatality estimate model and societal risk criteria. Moreover, this method applys to plan preventing disaster for Honam high speed railway tunnel. As results, we presented the proper distance of escape route and societal risk criteria.

An Ontology-Based Hazard Analysis and Risk Assessment for automotive functional safety (자동차 기능안전성을 위한 온톨로지 기반의 위험원 분석 및 위험 평가)

  • Roh, Kyung-Hyun;Lee, Keum-Suk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.3
    • /
    • pp.9-17
    • /
    • 2015
  • The ISO 26262 standard requires a preliminary hazard analysis and risk assesment early in the development for automotive system. This is a first step for the development of an automotive system to determine the necessary safety measures to be implemented for a certain function. In this paper, we propose an ontology-based hazard analysis and risk assessment method for automotive functional safety. We use ontology to model the hazard and SWRL(Semantic Web Language) to describe risk analysis. The applicability of the proposed method is evaluated by the case study of an ESCL(electronic steering column lock) system. The result show that ontology deduction is useful for improving consistency and accuracy of hazard analysis and risk assessment.

A Study on the Risk Assessment by Comparing Workplace Environment Measurement with Exposure Assessment Program(ECETOC TRA) (작업환경측정과 노출평가 프로그램(ECETOC TRA) 비교에 따른 위해성 평가에 관한 연구)

  • Ko, Won-Kyoung;Yi, Young-Seop
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.1-6
    • /
    • 2013
  • This study was conducted to compare the value of the working environment measurement with the expected exposure value drawn by using a program, thereby going to investigate whether it is available to the risk assessment of domestic workplace. We used the ECETOC TRA program which is one of the exposure predictive models. Four kinds of substances were measured in two workplace which was exposed to organic solvents and one kind of substance was measured in three workplace which was exposed to dusts and then an exposure assessment of chemical risk factors was conducted. The result value of the working environment measurement, solid substance exceeded standard in one site, and it was found that the other solid and liquid substances were within the standard. The value of the exposure assessment program showd the same result; it was higher than the value of the working environment measurement, suggesting that due to its nature, the exposure assessment program is run only on the worst situation. Therefore, it was found that when the exposure assesment program is used, variables should be substituted only after accurately assessing the workplace and it is a good idea to assess the risk beforehand with the exposure assessment program in the case of the workplace which employs no more than 5 people and where it is hard to assess the working environment.