• Title/Summary/Keyword: repair time

Search Result 1,425, Processing Time 0.019 seconds

A Repair-Time Limit Replacement Model with Imperfect Repair (불완전 수리에서의 수리시간한계를 가진 교체모형)

  • Chung, Il Han;Yun, Won Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.4
    • /
    • pp.233-238
    • /
    • 2013
  • This article concerns a profit model in a repair limit replacement problem with imperfect repair. If a system fails, we should decide whether we repair the failed system (repair option) or replace it by new one (replacement option with a lead time). We assume that repair times are random variables and can be estimated before repair with estimation error. If the estimated repair time is less than the specified limit (repair time limit), the failed unit is repaired but the unit after repair is different from the new one (imperfect repair). Otherwise, we order a new unit to replace the failed unit. The long run average profit (expected profit rate) is used as an optimization criterion and the optimal repair time limit maximizes the expected profit rate. Some special cases are derived.

Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types (공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구)

  • Lee, Kang-Hee;Park, Guen-Soo;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

A Study on Forecasting the Repair Time Range of the Building Components in the Apartment Housing (공동주택 구성재의 예상수선시기 범위 설정 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.2
    • /
    • pp.19-26
    • /
    • 2006
  • Building would be deteriorated with time elapse, influenced by its geographic situation, climate and other environmental conditions. In addition, the systematic maintenance could be provided to keep the resident a recent living condition. The existing breakdown maintenance will be changed into the preventive maintenance. The preventive maintenance is required to get the repair time, the repair scope and frequency. In this paper, it aimed at providing the repair time range over the building components, utilizing the relation between the determination curve and the performance recovery through repair. Results of this study are as follows : First, the forecast of the repair time over the building components could be calculated and equalized with the deterioration and performance degree. Second, the repair time range of building components would be provided into five categories and 3rd repair time. Results of this study will set up the long-term repair plan of building, and finally keep an housing condition comfortable.

Some Stochastic Properties of Imperfect Repair Model with Random Repair Time

  • Kim, Dae-Kyung;Lim, Jae-Hak
    • International Journal of Reliability and Applications
    • /
    • v.4 no.1
    • /
    • pp.27-40
    • /
    • 2003
  • Maintenance models involving minimal imperfect repair frequently appear in the literature of reliability and operations research. Most of the literatures concerning the stochastic behavior of repairable systems assume that it takes negligible time to repair a failed system and so the length of repair time does not affect the maintenance strategy. It is more realistic to consider the length of repair times in developing maintenance model, however. In this paper, we consider an imperfect repair model with random repair time and investigate some stochastic properties of the number of perfect repairs and the number of minimal repairs. Also we derive the expressions for evaluating the expected numbers of perfect and minimal repairs in general and apply these formulas for certain parametric life distributions.

  • PDF

Establishment of the Optimal Repair Cycle of the Components of the Rental Housing (공공임대주택 구성재의 적정 수선주기 산정 연구)

  • Lee, Tae-Kyoung;Chae, Chang-U;Lee, Kang-Hee
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.29-34
    • /
    • 2012
  • A rental housing has a key role to supply the living space to non-ownership. A public rental housing is particularly aimed at providing the living space for the low-income households with a low rent fee. Therefore, the local government would try to maintain the facilities of the rental housing and to get the decent living condition. For getting the required living condition, it should make a maintenance plan, which contains the repair time, repair scope and targeted component and finishings. This study is aimed at providing the optimal repair time in 12 components and components of the rental housing which is controlled by the local government. The optimal repair time has two steps to get the final result. First, it would draw the 1'st repair time with the probabilistic and empirical approach. Second, comparing the drawn data and the service life, the optima repair time would be provided with considering the components' attributes. Result are as follows : First, the optimal repair time would be considered with the component attributes. There are user's convenience, its safety and physical aspect. Second, the kitchen utensils, elevator and water tap has a optimal time of 16, 19, 17 years respectively which is considered with physical aspect. In addition, the optima repair time of the wiring appliance and lighting equipment are 12 years and 10 years respectively.

A Study on the Repair Time of the Construction Type in the Apartment Housings (공동주택 공종별 수선시기 설정 연구)

  • Lee, Kang-Hee;Park, Geun-Soo;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

Characteristics of the Economic Repair Time of the Components in Public Rental Housing

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.69-75
    • /
    • 2015
  • Building has required the repair money to improve or maintain the decent living condition continuously after construction. It needs to grasp the building deterioration to decide the scope and contents before it is repaired. Under various conditions such as physical, social and financial constraints, the repair plan would be prepared. Among constraints, the cost is indispensible to specify the repair time, repair scope and target. The required cost would be planned to preparation over the years. In this paper, it aimed at providing the repair strategy of the public rental housing in repair time, using the cumulative cost model which is $3^{rd}$ function. In the $3^{rd}$ function, the inflection point should exist in the line. And there are two types in the cumulative model, First, if the maximum cost be shown, the repair time would be provided. Second, if the maximum cost not be shown, the cumulative function should be proportionally increased and the repair strategy is properly provided with a short cycle. In results of this study, 11 items would provide the repair time. These cumulative function would be repaired about 4 years after constructed, and after about 4 years, the cumulative function would be continuously increased.

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

Cost Analysis Model with Minimal Repair of New Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 신제품 수리정책에서의 비용분석 모델)

  • Kim, Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.3
    • /
    • pp.195-203
    • /
    • 2006
  • This paper deals with cost analysis model in periodic maintenance policy. The repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a new unit before the periodic maintenance time comes. Then total expected cost per unit time is calculated according to time delta t in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and new unit expected cost. Numerical example is shown in which failure time of item has Normal distribution.

  • PDF

Cost Analysis for Periodic Maintenance Policy with Minimal Repair (응급수리를 고려한 정기보전정책의 비용분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF