• Title/Summary/Keyword: repair and maintenance

Search Result 1,066, Processing Time 0.026 seconds

A Development of concrete Pavement Material with Low Shrinkage and Reflection, High Strength and Performance (저수축 저반사 고강도 고내구성 콘크리트 포장재료 개발)

  • Kim, Hyo-Sung;Nam, Jeong-Hee;Eum, Ju-Yong;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.13-24
    • /
    • 2009
  • This study developed a high strength and performance concrete pavement material with low shrinkage and reflection of sunlight. Based on the literature review, a new mix-design of applying flash ash to improve the strength and performance of the concrete as well as to reduce the dry shrinkage is suggested. In addition, adding black pigment to reduce the reflection and technique of applying OAG (Optimized Aggregate Gradation) is also included. The result of the laboratory experiment indicates that the brightness and the reflection, which depends on the ratio of black pigment addition, did not deviate from the normal range. When OAG is considered for the mix-design, the strength and performance of the concrete improved greatly. In addition, the mix-design using fly ash reduced the dry shrinkage of concrete and improved the resistance to the permeation of chloride ion. Furthermore, the mix-design, which uses fly ash (25% replacement) and black pigment (3% addition) with the application of OAG, is found to be the most effective mix to reduce the shrinkage and reflection as well as improving the strength and performance of the concrete. The result of an economic analysis indicates that the initial construction cost of this proposed mix is more expensive than that of normal concrete pavement material. However, it can be more economic in the long run because the normal concrete pavement material is likely to cost more due to higher probability of maintenance and repair and higher social cost due to traffic accident, etc.

  • PDF

Review on Soil Erosion and Loss Management System of the Calgary City Government, Albert, Canada (캐나다 앨버트 주 캘거리 시의 토사관리제도에 관한 고찰)

  • Kim, Youngchul;Kim, Lee-Hyung;Hwang, Sung Woo
    • Journal of Wetlands Research
    • /
    • v.17 no.2
    • /
    • pp.163-175
    • /
    • 2015
  • In this paper, soil erosion and soil loss management system (SMS) of the City of Calgary in Albert, Canada was reviewed. Regulatory basis supporting this soil management system, permit process and conditions, guidelines and principles for the SMS, and monitoring and repair duties, inspection were discussed. Permit process in the City of Calgary is handled mainly by Urban Development Division, in which special task force called CPAG (Coorporative Planning Application Group) (if necessary circulated through related subdivisions). Inspects all the permit conditions and decides permit or refusal, and LUM (Land Use and Mobility) advertises the approval, if there is no appeals, permit is released to developers. If permit is rejected, applicant can appeals Development Appeal Board, it can approve or reject. In addition to permit, the city has manual for soil management plan, which includes BMP selection, design, monitoring, maintenance, and inspection activities. Perfect SMS policy does not necessarily guarantee relieving the soil-particle related pollution problem, but in Korea, we have to recognize that construction works during development is potentially the most destructive stage of environmental pollution. The central and local governments must make preparations for the effective and tight regulations and ordinance which is appropriate for regional social-economic conditions.

A Study on the Changes in Residential Environments after Residential Environments Improvement Projects (주거환경개선사업이후 주거 환경 변화에 관한 연구 - 대구광역시 주거환경개선사업의 물리적 환경 분석을 중심으로 -)

  • Kim, Young-Hwa;Lee, Sang-Hong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.3-12
    • /
    • 2018
  • This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.

A Development and Application of Play Learning Program for the Complement Number Concept (보수 개념 신장을 위한 놀이 학습 프로그램의 개발 및 적용)

  • Jeong, Ji In;Kim, Sung Joon
    • Journal of Elementary Mathematics Education in Korea
    • /
    • v.20 no.2
    • /
    • pp.193-213
    • /
    • 2016
  • This study has two goals. The First is to develop and apply a step-by-step program and the degree to which students' mathematical skills. The second is to analyze mathematical attitude change around the first grade students was done. The program for learning complement number is composed of series of 5 steps and 11 classes. Play for learning complement number, taking into account the difficulty of the learning steps 1-5 are organized. First step is composed of the classes which fragmented pieces of shapes to complete the entire geometry with fun activities for the entire part of the concept of learning and it maintenance concepts and can naturally learn by associating step. In second step, tools to take advantage of the real world and collecting the conservative concept. 3rd steps is to repair the mathematical concept of the parish in the learning stage of expansion. 4th step is halrigalri, number cards, making ten games etc. 5th step is to verify the concept of complement number and number operation ability. The concept of complement number through fun activities can improve students' mathematical skills, and mathematical attitude change. Early in the program, students use the finger to throw acid in the process. Simple addition and subtraction calculations may take a long time and error, but more and more we progress through the program using the fingers is eliminated and a more complex form calculations was not difficult to act out.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

A Study on the Influencing Factors for the Establishment of a Public Asset Management System Based on AHP-ISM (AHP-ISM기반의 공공자산관리 관리체계 영향요인 도출 연구)

  • Lee, Han-Sol;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.403-414
    • /
    • 2022
  • Many studies have been conducted on asset management of public facilities, as the importance of such management has been increasing. This basic study aims to present strategies for the practical use of public asset management, and seeks to propose efficient management and utilization measures from a cost perspective by comparing and analyzing the importance and impact relationship between cost items for public asset management. In this study, 19 sub-items and the top 4 items were chosen by deriving cost factors based on the previous literature. A survey was conducted, and the results of the survey were analyzed by using the Analytic Hierarchy Process(AHP) and Interpretive Structural Modeling (ISM) methods. The AHP was used to derive the priority between items, and ISM was used to identify major groups and mutual influences. As a result, those items showing both high priority and high importance, such as user cost, dismantling/disposal cost, replacement cost, maintenance/repair cost, etc. are determined as priority items to be considered for public asset management of public facilities. Also, it is necessary to minimize the impact on other items in public asset management by those items which are impacted less by other items but have significant impact on the items such as initial construction costs, conceptual design costs, construction costs, and supervision costs. It is expected that the results and analysis methods presented in this study can be used to provide strategies for asset management of public facilities.

Development and Application of Cone Penetrometer with Impact Penetration Rod for Evaluation of Track Substructure (철도궤도 하부구조물 평가를 위한 타격식 관입 롯드가 체결된 콘 관입기의 개발 및 적용)

  • Hong, Wontaek;Byun, Yonghoon;Kim, Sangyeob;Choi, Chanyong;Lee, Jongsub
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.2
    • /
    • pp.45-52
    • /
    • 2015
  • To minimize the cost of maintenance, repair and over-design of track substructure, an accurate evaluation of strength and stiffness of the track substructure is necessary. In this study, a cone penetrometer with impact penetration rod (CPI) is developed for the evaluation of track substructure. For applicability test, the chamber and field tests were performed. As the experimental results of the CPI, dynamic cone penetration endex (DCPI), cone tip resistance ($q_c$), friction resistance ($f_s$) and friction ratio (Fr) were obtained. In the chamber test, the experimental results show reasonable values for the simulated track substructure. In the field test, the CPI clearly detects the interface between the ballast and the subgrade. Also, discontinuous layers are detected in the subgrade. It is expected that the developed CPI may be an effective tool for the evaluation of track substructure by evaluating the ballast layer by dynamic penetration and the subgrade by static penetration of the inner rod.

A Study on Customer Dissatisfaction, Complaining Behavior, and Long-Term Orientation of Internet Fashion Shopping Mall (인터넷 패션 쇼핑몰 고객 불만족, 불평행동 및 관계지향성에 관한 연구)

  • Ju, Seong-Rae;Chung, Myung-Sun
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.32 no.12
    • /
    • pp.1866-1877
    • /
    • 2008
  • The purposes of this study were to identify the dimensions of perceived dissatisfaction, complaining behavior, and long-term orientation of customers about the Internet fashion shopping mall, and to empirically examine the effects of each dimension of perceived dissatisfaction and complaining behavior on long-term orientation. For this study, questionnaires were administered to 275 Internet shopping mall customer. To analyze collected data, descriptive analysis, factor analysis, Cronbach's $\alpha$, correlation analysis, and regression analysis were used. Major findings were as follows. First, college students were found to mainly complain of dissatisfaction at product quality, refunding/changing/maintenance repair, price, contract, delivery, and payment after transaction with the Internet shopping mall. Second, customer dissatisfaction was found to have high correlation with complaining behavior and partly with customer neglect or exit. Third, higher customer dissatisfaction was found to increase customer complaining behavior in general. Finally, higher complaining behavior was found to have connection with lower customer loyalty and higher customer neglect and exit.

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.