• Title/Summary/Keyword: repair

Search Result 6,798, Processing Time 0.034 seconds

A Repair-Time Limit Replacement Model with Imperfect Repair (불완전 수리에서의 수리시간한계를 가진 교체모형)

  • Chung, Il Han;Yun, Won Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.4
    • /
    • pp.233-238
    • /
    • 2013
  • This article concerns a profit model in a repair limit replacement problem with imperfect repair. If a system fails, we should decide whether we repair the failed system (repair option) or replace it by new one (replacement option with a lead time). We assume that repair times are random variables and can be estimated before repair with estimation error. If the estimated repair time is less than the specified limit (repair time limit), the failed unit is repaired but the unit after repair is different from the new one (imperfect repair). Otherwise, we order a new unit to replace the failed unit. The long run average profit (expected profit rate) is used as an optimization criterion and the optimal repair time limit maximizes the expected profit rate. Some special cases are derived.

Establishment of the Repair Cycle of the Components of the Apartment Housing

  • Lee, KangHee;Ahn, YongHan;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Building has been deteriorated over the year after construction. The deterioration has caused to hinder the living condition and to decrease the building value. Thus, it is important to prevent or delay the building deterioration as well as to proceed the maintenance. The long-term repair program for the apartment in Korea plays a key role to make the repair plan after construction and to assure the function decent. This is not flexible to the change of the material and component because the program is provided by the Korean-law. Many items are omitted in the long-term program so that the maintenance experts face many difficulties to make a repair plan. In this paper, it aimed at providing the repair cycle and repair ratio according to the repair scope, which are not provided in the current program. This study shows that the repair ratio is presented with quartile range in 25%, 50%, 75% and 100%. This has an advantage to take an overall look in repair items. Under this presentation of the repair ratio, each item has a unique repair value. Second, the repair scope is divided into partly repair, fully repair, partly alteration and fully alteration. If a fully repair has a repair ratio close to 100%, it would mean that a fully repair is a fully alteration. Third, the short repair cycle means that it requires to maintain the function or performance of the components in a short term.

Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost (공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

Re-Repair Method for Deterioration of Partial Depth Repair Section in Portland Cement Concrete Pavement (콘크리트 포장 부분단면보수 재파손 구간의 적정 보수 방안)

  • Lee, Yong Hyeon;Kim, Hyun Seok;Jung, Won Kyong;Oh, Han Jin;Kim, Hyung Bae
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.33-42
    • /
    • 2017
  • PURPOSES : The purpose of this study is to suggest the construction and quality control method for the re-repair of a deteriorated partial depth repair for sections of Portland cement concrete pavement. METHODS : An experimental construction was conducted to extend the repair width for removing an existing repair section. A removal method was used to ensure early performance for a deteriorated partial depth repair section. Bond strength and split tensile strength were measured at the near vertical interface layer between the existing pavement and repair material. The area was analyzed for various conditions such as the extended repair area and the removing method of the existing repair section. RESULTS : As a result of analysis of bond strength and split tensile strength, the bonding performance of a milling removed section was improved over a cutting and hand breaker removed section. The bond strength was analyzed to increase slightly as the extended repair width for removing the existing repair section increased. The split tensile strength did not show a clear relationship to an increased extended repair width of an existing removed repair section. CONCLUSIONS : The milling removal method should be applied in the removal of existing deteriorated partial depth repair sections. The extended repair width for a re-repair section should be wider than the existing partial depth repair with at least a 75-mm length and width for the bond strength and the split tensile strength.

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

Preliminary Study on the Coordination of the Repair works' items of the Long Term Repair Plan in Apartment Housing (공동주택 장기수선계획 수립기준 항목 조정에 관한 기초 연구)

  • Lee, Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.13-22
    • /
    • 2016
  • The long term plan for apartment housing has a important role to make a decision making whether a repair work should be done or not. But, items for repair works are so various that field workers could not understand the context or plan the repair cost and time. These difficulties are drawn from the number of repair items, duplicated application and meaning, new material application and technology time-gap. Therefore, it needs to change or coordinate the repair items to improve the repair condition, reflecting the current material level or repair technologies. In this paper, it aimed at coordination of the repair items through the repair recording sheet which was surveyed in 22 metropolitan areas of Seoul, conducted between 2011 and 2014. The surveyed data are classified into six categories such as building exterior, building interior and so on, according to long term repair plan and the number of data are 1,918. It analyzed the appearing word for repair-concerned and compared the existing items of the long term plan. Items of building exterior are proposed as roof, exterior wall and painting. Building interior has a little meaning to propose the repair items. The water supply facilities are proper to keep the existing repair items. Items of the outdoor facilities could not need a sign board, drainage root and PVC sheath. Through this study, we can coordinate the repair items in apartment and provide the repair item and cost level.

A Preliminary Study on the Prediction of School Facilities Repair Frequency and Rate (학교시설 수선주기 및 수선율 예측에 관한 기초적 연구)

  • Jung, Young-Han;Lee, Jae-Sung;Cho, Bong-Ho
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.2
    • /
    • pp.1-8
    • /
    • 2010
  • This study is to present an engineering solution for the repair frequency and repair rates of a building. The existing data for the repair frequency and repair rates are used to draw the probability distribution for the generalized repair frequency and repair rate in a building. The suggested methodology can be widely used for most buildings to estimate the legal repair frequency and repair rates. Also, the methodology can be applied to resolve the risks on the maintenance costs in LC (Life Cycle) plans or LCC (Life Cycle Cost) analysis. As the future studies, there are the multiple regression analysis including the parameters on incurred costs and the decision methods on efficient repair and replacement.

Some Stochastic Properties of Imperfect Repair Model with Random Repair Time

  • Kim, Dae-Kyung;Lim, Jae-Hak
    • International Journal of Reliability and Applications
    • /
    • v.4 no.1
    • /
    • pp.27-40
    • /
    • 2003
  • Maintenance models involving minimal imperfect repair frequently appear in the literature of reliability and operations research. Most of the literatures concerning the stochastic behavior of repairable systems assume that it takes negligible time to repair a failed system and so the length of repair time does not affect the maintenance strategy. It is more realistic to consider the length of repair times in developing maintenance model, however. In this paper, we consider an imperfect repair model with random repair time and investigate some stochastic properties of the number of perfect repairs and the number of minimal repairs. Also we derive the expressions for evaluating the expected numbers of perfect and minimal repairs in general and apply these formulas for certain parametric life distributions.

  • PDF

Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types (공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구)

  • Lee, Kang-Hee;Park, Guen-Soo;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

Repair bond strength of resin composite to three aged CAD/CAM blocks using different repair systems

  • Gul, Pinar;Altinok-Uygun, Latife
    • The Journal of Advanced Prosthodontics
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2020
  • PURPOSE. The purpose of this study is to evaluate the repair bond strength of a nanohybrid resin composite to three CAD/CAM blocks using different intraoral ceramic repair systems. MATERIALS AND METHODS. Three CAD/CAM blocks (Lava Ultimate, Cerasmart, and Vitablocks Mark II) were selected for the study. Thirty-two specimens were fabricated from each block. Specimens were randomly divided into eight groups for the following different intraoral repair systems: Group 1: control group (no treatment); Group 2: 34.5% phosphoric acid etching; Group 3: CoJet System; Group 4: Z-Prime Plus System; Group 5: GC Repair System; Group 6: Cimara System; Group 7: Porcelain Repair System; and Group 8: Clearfil Repair System. Then, nanohybrid resin composite (Tetric Evo Ceram) was packed onto treated blocks surfaces. The specimens were thermocycled before application of repair systems and after application of composite resin. After second thermal cycling, blocks were cut into bars (1 × 1 × 12 ㎣) for microtensile bond strength tests. Data were analyzed using two-way ANOVA and Tukey's HSD test (α=.05). RESULTS. Cimara System, Porcelain Repair, and Clearfil Repair systems significantly increased the bond strength of nanohybrid resin composite to all CAD/CAM blocks when compared with the other tested repair systems (P<.05). In terms of CAD/CAM blocks, the lowest values were observed in Vitablocks Mark II groups (P<.05). CONCLUSION. All repair systems used in the study exhibited clinically acceptable bond strength and can be recommended for clinical use.