The water can be contaminated by natural sources or by industrial effluents. One such contaminant is fluoride. Fluoride contamination in the water environment due to natural and artificial activities has been recognized as one of the major problems worldwide. Among the commonly used treatment technologies applied for fluoride removal, the adsorption technique has been explored widely and offers a highly efficient simple and low-cost process for fluoride removal from water. This review paper the recent developments in fluoride removal from surface water by adsorption methods. Studies on fluoride removal from aqueous solutions using various carbon materials are reviewed. Various adsorbents with high fluoride removal capacity have been developed, however, there is still an urgent need to transfer the removal process to an industrial scale. Regeneration studies need to be performed to more extent to recover the adsorbent in field conditions, enhancing the economic feasibility of the process. Based on the review, technical strategies of the adsorption method including the Nano-surface effect, structural memory effect, anti-competitive adsorption and ionic sieve effect can be proposed. The design of adsorbents through these strategies can greatly improve the removal efficiency of fluoride in water and guide the development of new efficient methods for fluoride removal in the future. This paper describes brief discussions on various low-cost adsorbents used for the effective removal of fluoride from water.
PURPOSES : This study evaluates the efficiency of snow removal operation resources using data envelopment analysis (DEA). The results of this study can help decision-making strategies, especially for resource allocation for snow removal works on national highways. METHODS : First, regional road management offices (DMUs) for efficiency evaluation were set up, and a database (for years 2012-2016) for analysis was formed. Second, DEA was carried out by selecting input and output variables based on the constructed database. Lastly, based on the results of the DEA, the efficiency of each regional road management office was evaluated. In addition, the potential for future improvement was determined. RESULTS : The results showed that there was a large variation in efficiency of snow removal operation resources by regional offices. CONCLUSIONS : The results of this study imply that the evaluation of efficiency for snow removal operation resources is important when decisions related to snow-removal strategies are made by road management offices.
We consider an M/M/c queue with two types of custormers, positive customers and negative customers. Positive customers are ordinary ones who upon arrival, join a queue with the intention of getting served and each arrival of negative customer removes a positive customer in the system, if any presents, and then is disappeared immediately. The Laplace-Stieltjes transforms (LST's) of the sojourn time distributions of a tagged customer, joinly with the probability that the tagged customer completes his service without being removed are derived under the combinations of various service displines; FCFS, LCFS and PS and removal strategies; RCF, RCH and RCR.
The objective of this study was to establish the optimal system operating strategies for nitrogen and phosphorus removal through model simulation system built for advanced wastewater treatment targeting on simultaneous temporal/special phase isolation BNR process. The simulation system was built with unit process modules using object modules in GPS-X code. The system was well verified by field experiment data. Simulation study was carried out to investigate performance response to design and operation parameters, i.e. hydraulic retention time (HRT), solids retention time (SRT), and cycle time. The process operated at HRTs of 10~15 hours, longer SRTs, and cycle time of 2 hours showed optimal removal of nitrogen. The HRTs of 10~15 hours, SRTs of 20~25 days, and longer cycle time was optimal for phosphorus removal. Both simulation and field studies showed that optimal operating strategies satisfying both the best nitrogen and phosphorus removals include HRTs ranged 10~15 hours, SRTs ranged 20~25 days, and cycle times of 4~8 hours. The simulation system with modularization of generalized components in BNR processes was, therefore, believed to be a powerful tool for establishing optimal strategies of advanced wastewater treatment.
PURPOSES : In this study, systematic road snow-removal capabilities were estimated based on previous historical data for road-snowremoval works. The final results can be used to aid decision-making strategies for cost-effective snow-removal works by regional offices. METHODS : First, road snow-removal historical data from the road snow-removal management system (RSMS), operated by the Ministry of Land, Infrastructure and Transport, were employed to determine specific characteristics of the snow-removal capabilities by region. The actual owned amount and actual used amount of infrastructure were analyzed for the past three years. Second, the regional offices were classified using K-means clustering into groups "close" to one another. Actual used snow-removal infrastructure was determined from the number of snow-removal working days. Finally, the correlation between the de-icing materials used and infrastructure was analyzed. Significant differences were found among the amounts of used infrastructure depending on snowfall intensity for each regional office during the past three years. RESULTS:The results showed that the amount of snow-removal infrastructure used for low heavy-snowfall intensity did not appear to depend on the amount of heavy snowfall, and therefore, high variation is observed in each area. CONCLUSIONS:This implies that the final analysis results will be useful when making decisions on snow-removal works.
The operational parameters and control strategies of a tertiary wastewater treatment process a biological filtration system were investigated. The biological filtration system consisted of a nitrification filter (Fiter 1) and a polishing filter with anoxic and aerobic parts (Filter 2). SS, T-C-BOD, and T-N in effluent were kept stable at less than 3, 5 mg/L, and 5 mgN/L, respectively, under a HRT in Filter (filter-bed) of 0.37~2.3 h. T-N at the outlet of Filter 2 were about 1~5 mgN/L under the condition of LV of 50~202 m/d. Methanol addition was controlled based on the COD/N ratio or McCarty's equation. Constant COD/N ratio control results in excess addition under large diurnal fluctuation of $NOx^--N$, and McCarty's equation can be used to add appropriate amount of methanol. Control of methanol addition by on-line nitrate measurement, control of aeration by on-line DO measurement, and control of backwashing by head loss measurement are successfully operated. These results proved that this process prove the easy-maintenance and cost-effectively treatment is attainable.
Jun Sen Chuah;Jih Huei Tan;Kharlina Binti Khairudin;Louis Leong Liung Ling;Tuan Nur'Azmah Binti Tuan Mat
한국간담췌외과학회지
/
제26권2호
/
pp.199-203
/
2022
Gallstone ileus is an uncommon cause of intestinal obstruction. It may present with typical symptoms of intestinal obstruction with or without biliary sepsis. Its management strategies vary depending on the patient and operative factors. Enterotomy and stone removal alone versus synchronous cholecystectomy and fistula disconnection at the same stage, often pose a debate among surgeons. The decision for operative strategies largely depends on the surgeon's experience, patient's physiology, and operative difficulties. As literature on gall stone ileus remains insufficient at a regional level, we report four cases of gallstone ileus managed with different approaches. Three patients were managed in a staged-manner, whereas one patient received a definitive procedure performed at index surgery. Clinical challenges and associated operative strategies are discussed. Findings of the current study were compared to those of the literature. The need for a definitive fistula disconnection and repair or cholecystectomy following stone removal in these patients was subsequently discussed.
This study evaluated the performance of a membrane aerated biofilm reactor (MABR) for nitrogen removal from a high-strength ammonia nitrogen-containing wastewater. The experimental setup consisted of four compartments that are sequentially anaerobic and aerobic to achieve complete nitrogen removal. The last compartment of the reactor setup contained a membrane bioreactor (MBR) to reduce sludge production in the system and to obtain a better-quality effluent. Continuous experiment over a period of 47 days showed that MABR exhibited excellent NH4+-N removal efficiency (99.5%) compared to the control setup without MABR (56.5%). The final effluent NH4+-N concentration obtained in the MABR was 2.99±1.56 mg/L. In contrast to NH4+-N removal, comparable TOC removal values in the MABR and the control reactor (99.2% and 99.3%, respectively) showed that air supply through MABR is much more critical for denitrification than for organic removal. Further study to understand the effect of air supply rate and holding pressure on NH4+-N removal in MABR revealed that an increase in both these parameters positively impacted reactor performance. These parameters are related to oxygen supply to the biofilm formed over the membrane surface, which in turn influenced NH4+-N removal in MABR. Among the two different strategies to control biofilm over the membrane surface, results showed that scouring for a duration of 10 min on a weekly basis, along with mixing air supply, could be an effective method.
Integrated process with coagulation and microfiltration as an advanced water treatment has been expanded its application in recent years due to its superb removal of particles and natural organic matter. In usual, effectiveness of coagulation sometimes determines performance of the whole system. Several new polymeric coagulants introduced to water utilities for better efficiency were studied in this paper. Three polymeric coagulants (i.e., PACl, PACs, and PAHCs) along with alum were evaluated for removal of natural organic matter, especially for reduction of trihalomethane formation potential, for which regulation has become stringent. Turbidity removal was closely related to pH variation showing the reduced turbidity removal by PACs due to the decreases in the pH of supernants at high doses. The four coagulants showed different organic matter removal during coagulation and affected the removal in microfiltration. For instance, DOC concentration was not reduced by microfiltration when PAHCs were used however 10 % of DOC removal was observed by microfiltration with alum coagulation. Coagulation pretreatment also impacted the THM removals, i.e., approximately 30 % of THMs and 13 % of DOC was removed by microfiltration only, but 40 to 67 % of THMs and 30 % of DOC was removed by the integrated process. Strategies on selection of coagulants are needed depending on characteristics of target pollutants in raw waters.
A single-stage deammonification with a sequencing batch reactor (SBR) that simultaneous nitritation, anaerobic ammonia oxidation (anammox), and denitrification (SNAD) occur in one reactor has been widely applied for sidestream of wastewater treatment plant. For the stable and well-balanced SNAD, a feeding strategy of influent wastewater is one of the most important operating factors in the single-stage deammonification SBR. In this study, single-stage deammonification SBR (working volume 30L) was operated to treat a high-strength ammonium wastewater (1200 mg NH4+-N/L) with different feeding strategies (single feeding and nine-step feeding) under the condition without COD. Each cycle of the step feeding involved 6 sub-cycles consisted of aerobic and anoxic periods for partial nitritation (PN) and anammox, respectively. Contrary to unstable performance in the single feeding, the step feeding showed better deammonification performance (0.565 kg-N/m3/day). Under the condition with COD, however, the nitrogen removal rate (NRR) decreased to 0.403 kg-N/m3/day when the Nine-step feeding strategies had an additional denitrification period before sub-cycles for PN and anammox. The NRR was recovered to 0.518 kg-N/m3/day by introducing an enhanced multiple-step feeding strategy. The strategy had 50 cycles consisted of feed, denitrification, PN, and anammox, instead of repeated sub-cycles for PN and anammox. The multiple-step feeding strategy without sub-cycle showed the most stable and excellent deammonification performance: high nitrogen removal efficiency (98.6%), COD removal rate (0.131 kg-COD/m3/day), and COD removal efficiency (78.8%). This seemed to be caused by that the elimination of the sub-cycles might reduce COD oxidation during aerobic condition but increase the COD utilization for denitrification period. In addition, among various sensor values, the ORP pattern appeared to be applicable to monitor and control each reaction step for deammonification in the multiple-step feeding strategy without sub-cycle. Further study to optimize the number of multiple-step feeding is still needed but these results show that the multiple-step feeding strategy can contribute to a well-balanced SNAD for deammonification when treating high-strength ammonium wastewater with COD in the single-stage deammonification SBR.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.