• Title/Summary/Keyword: removal efficiencies

Search Result 1,115, Processing Time 0.029 seconds

Non-thermal plasma를 이용한 VOCs의 제거기술

  • Song, Yeong-Hun;Sin, Wan-Ho;Kim, Gwan-Tae;Kim, Seok-Jun;Sim, Sun-Yong;Jang, Dong-Je
    • 한국연소학회:학술대회논문집
    • /
    • 1998.10a
    • /
    • pp.31-36
    • /
    • 1998
  • An experimental study has been performed to characterize fundamental aspects of VOCs removal using non-thermal palsma technique. The removed VOCs in the present study are toluene ($C_6H_5CH_3$), ethene ($C_2H_4$), propene ($C_3H_6$) which are typical air pollutants generated from industry and automobile engines. The non-thermal plasma used in the present experiments has been produced in a wire-cylinder reactor with pulsed corona or a packed-bed reactor filled with ceramic bead. These differently generated non-thermal plasma have been visualized with an intensified CCD. The images of non-thermal plasma have been used for optimal design of a corona reactor used in the present study. The experimental results show that the removal efficiencies of VOCs with non-thermal plasma are dependant on the reactivity of VOCs with OH, O, and $O_3$. The results also show that the removal efficiencies of VOCs decrease significantly when VOCs are treated with NO that is also oxidized in the presence of OH, O, and $O_3$.

  • PDF

Study of HVAC system with air cleaning system for indoor air quality of subway station (지하철 역사의 실내공기질 개선을 위한 공조기 적용 공기청정장치 선정에 대한 기초연구)

  • Jung, Yee-Kyeong;Park, Jae-Hong;Lee, Ryang-Hwa;Yoon, Ki-Young;Hwang, Jung-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.537-540
    • /
    • 2008
  • A numerical study has been carried out on the optimization of an air cleaning system which was installed in a heating, ventilation and air conditioning system (HVAC) system of subway station for particle removal. Required particle removal efficiencies of three different air cleaning systems were calculated from ventilation rate, and indoor/outdoor concentration of PM10. Mass balance equations of PM10 were used to solve the required particle removal efficiencies. Fibrous filter was considered as an air cleaning system. Calculations were carried out about two different places which were waiting area and platform of subway station, respectively. This study proposed optimized design and operation condition of each air cleaning system.

  • PDF

Collection characteristics of wet-type rotating porous disk system for air pollutants removal of marine diesel engines (박용디젤기관의 대기오염 저감을 위한 습식 회전형 다공성 디스크 시스템의 집진특성)

  • Yoa, Seok-Jun;Jang, Chang-Ik
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.50 no.3
    • /
    • pp.318-325
    • /
    • 2014
  • The main object of this study is to investigate the collection characteristics of wet-type rotating porous disk system experimentally. The experiment is carried out to analyze the pressure drop and collection efficiency for the present system with the experimental parameters such as system inlet velocity, stage number, tube diameter, inlet concentration, etc. In results, for the present system, at 5 stage and ${\upsilon}_{in}=1.8m/s$, the pressure drop becomes significantly lower as $64mmH_2O$ in comparison with that of the conventional wet type scrubber (Venturi scrubber, over $250mmH_2O$). The collection efficiencies increase with higher inlet velocity showing 92, 95.7, 98.4%, while $SO_2$ removal efficiencies decrease with increment of inlet velocity as 80, 65, 50% at ${\upsilon}_{in}=1.08$, 1.44, 1.8 m/s and tube diameter $D_t=10mm$, respectively. The present system is to be considered as an effective compact system for a simultaneous removal of particle/gas phase pollutants from marine diesel engines.

Validity evaluation of wastewater treatment system applying advanced treatment processes (고도처리공법이 적용된 하수처리시설에서의 공법적용의 적정성 평가)

  • Ahn, June-Shu;Park, Tae-Sool;Cho, Jung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.4055-4068
    • /
    • 2010
  • In this study, validity of wastewater treatment system with advanced treatment processes was evaluated by studying its operational conditions by applying the advanced treatment to the wastewater treatment system which was operating for last several years. Study indicated a fair result for the removal efficiencies of BOD, T-P, and T-N for each unit operation. BOD removal efficiencies for primary clarifier, bioreactor, final effluent are 35, 87, and 48 % respectively. T-P(T-N) removal efficiencies for primary clarifier, bioreactor, final effluent are 18(23), 40(38), and 25(25) % respectively. Further investigation of bioreactor showed that various microorganism such as bacteria, protozoa, and metazoa is present in the bioreactor, and the main function of the media, adhesion (adsorption) of microorganism onto the media, is stabilized. Final effluent quality was lower than the regulation, and BOD, COD, SS, T-N, T-P were 5.5, 9.9, 4.6, 11.8, 0.99 mg/L respectively.

A Comparative Study on Treatment Efficiencies by Anaerobic Packed and Fluidized-bed Biofilm of Livestock Wastewater (축산폐수의 혐기성 충전층과 유동층 생물막법에 의한 처리효율의 비교연구)

  • 김은호;박현건;장성호
    • Journal of Environmental Health Sciences
    • /
    • v.24 no.1
    • /
    • pp.54-61
    • /
    • 1998
  • This study was conducted in order to evaluate the treatment efficiencies of anaerobic packed and fluidized-bed biofilm and to investigate applicability in treating livestock wastewater. Biocarbonate alkalinity(BA) and volatile fatty acid(VFA) were about 3,230-3,270 mg/l, 3,790-3,126 mg/l(as CaCO$_3$) and 224-402 mg/l, 141-387 mg/l(as CH$_3$COOH), and VFA/BA ratio was about 0.069~0.12, 0.045-0.12 in packed and fluidized-bed biofilm. When COD loading rate was 6.0 kg COD/$m^3\cdot$ day in packed and fluidized-bed biofilm, methane gas production were 3.23 l/day and 4.38 l/day, respectively. In the same COD loading rate, methane gas production volumes per kg COD removal were 0.25 m$^3$ CH$_4$/kg COD$_{rm}$ and $0.28 m^3 CH_4/kg COD^{rm}$, respectively. At this time, it could be estimated that fluidized-bed biofilm was more high. In case of HRT 0.94 day(6.0 kg COD/$m^3\cdot$ day) and 11 day(0.5 kg COD/$m^3\cdot$ day), packed-bed biofilm showed 59% and 81% COD removal efficiency, respectively. While fluidized-bed biofilm showed 72% and 85% removal efficiency, respectively. It was showed that fluidized-bed biofilm was more efficient. Packed-bed biofilm was higher than fluidized in treatment efficiencies of organic matters, but required continuous treatment using combined system, because it was very exceeded over an environmental standard solidified from '96 year. In operating fluidized-bed biofilm, if farm house consider high power cost according to high circulation ratio in an economic point of view, it would have an effect that farm house use packed-bed biofilm as combined system in treating livestock wastewater.

  • PDF

Treatment of Heavy Metals and Phenol in Contaminated Soil Using Direct Current and Pulse Voltage (직류 전원과 펄스 전원을 이용하여 오염된 토양에서의 중금속과 페놀 처리)

  • Choi, Changsik;Hong, Bumeui;Choi, Hee Young;Lee, Eunsil;Choi, Suk Soon
    • Applied Chemistry for Engineering
    • /
    • v.27 no.6
    • /
    • pp.606-611
    • /
    • 2016
  • In this work, the treatment of heavy metals and phenol in the contaminated soil was investigated by applying direct current (DC) and pulse voltage. When the DC was used, the removal efficiencies for Cu, Zn, As, and Pb were 73, 88, 10, and 10%, respectively, and more than 95% for phenol was removed. Furthermore, when a pulse voltage was employed the removal efficiencies for Cu, Zn, As, and Pb were 88, 92, 40, and 40%, respectively, and 87% of phenol was removed. The results indicate that the application of a pulse voltage for the treatment of contaminated soil reduced electro-osmosis, but increased the rate of electric current movement of heavy metals. In addition, the removal efficiencies for As and Pb have been improved due to the enhanced adsorption capacity of clay components in the soil. Therefore, these experimental results could be effectively applied in remediation technology for the treatment of various heavy metals and phenol.

Performance Study on Pilot-scale Constructed Wetlands in order to Restore Contaminated Stream (오염하천의 정화를 위한 파일럿 규모의 인공습지 적용)

  • Kim, Seung-Jun;Choi, Yong-Su;Bae, Woo-keun
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.3
    • /
    • pp.546-556
    • /
    • 2006
  • The purpose of this study is to improve the polluted stream water quality by pilot-scale five different constructed wetlands (CWs). Cell 1 to 3 are newly designed 2SFCW (Surface-subsurface flow CW) with 1 to 3 flow shifters (FS) in the middle of the wetland system. Cell 4 and 5 are control CW (CCW), but Cell 5 is the same type as Cell 3. The FS, which converts the route of surface and subsurface flow between two wetlands connected in series, was able to enhance the treatability of TN via nitrification and denitrification and of SS due to filtration and sedimentation. The void fraction and dispersion number of Cell 1, 2 and 3 obtained from the RTD analysis were found to be 0.73 and 0.17, respectively. COD and TP removal efficiencies of Cell 1 to 3 were similar to that of Cell 4 and 5. SS removal efficiencies of Cell 1 to 3 and 5 with FS were 5-10% higher than that of Cell 4 without FS. TN removal efficiencies of Cell 1 to 3 were 3-14% higher than that of Cell 4 and 5. The average $R^2$ values of COD, SS, TN and TP obtained from nonlinear regression analysis were similar to the results of other researchers.

Nitrogen and Phosphorus Removal Characteristics by the Variation of Aeration Time in SBR (SBR에서 포기기간 변경에 따른 질소.인 제거 특성)

  • Kim, Dong-Seog;Park, Young-Seek
    • Journal of Environmental Health Sciences
    • /
    • v.35 no.2
    • /
    • pp.116-123
    • /
    • 2009
  • Laboratory scale experiments were conducted to investigate the removal characteristics of nitrogen and phosphorus by the variation of aeration time in four sequencing batch reactors (SBRs). In R1 which has the shortest aeration time as 1 h, MLVSS concentration in reactor decreased by the wash-out of biomass because of the poor sedimentation. The TOC removal efficiencies were almost similar in 3 reactors except R1. At the low aeration time as 1 h, the nitrification was severely inhibited by the deficiency of oxygen. ${NH_4}^+$-N removal efficiency was decreased by the decrease of aeration time. At the aeration time over 2 h, the phosphorus removal efficiency was not affected by the variation of aeration time. The nitrification was inhibited but the phosphorus release and uptake was not inhibited by the decrease of low aeration time. Therefore, we can see that the phosphorus removal microorganisms are superior to nitrification microorganisms in oxygen utilization.

Removal of Organics and Nirtogen in Wastewater Using 2 Stage A/O(RBC) Process (RBC 반응조를 이용한 2단 A/O 공정에서 유기물질 및 질소제거)

  • 최명섭;손인식
    • Journal of Environmental Health Sciences
    • /
    • v.29 no.3
    • /
    • pp.59-64
    • /
    • 2003
  • This study was conducted to investigate anoxic-RBC-anoxic-RBC process and its application to remove biologically organics and nitrogen. BOD and total-nitrogen(T-N) removal efficiencies were decreased as volumetric loading rate increased. But, the removal efficiency changes of T-N were little, as compared to BOD. Increase of internal recycle rate had few affect of BOD and T-N removal rates. Also, influent allocation(to 2nd anoxic reactor) had few affect of BOD removal efficiency rate. However, when the influent allocation rate was 30%, T-N removal efficiency was increased to 84.1 %. BOD/N ratio applied to 2nd anoxic reactor was increased to range of 3.65-4.37 as influent allocation rate increased to range 20∼35%. But, it might also cause adverse effect such as decrease of denitrification rate in excessive influent allocation rate.

Phosphorus Removal by Aluminium Ion Generated with the Pitting Corrosion of Aluminium (알루미늄의 부식으로 발생한 알루미늄 이온에 의한 인 제거)

  • Cheong Kyung-Hoon;Jung Oh-Jin
    • Journal of Environmental Science International
    • /
    • v.8 no.6
    • /
    • pp.705-710
    • /
    • 1999
  • The fundamental experiments on the phosphorus removal from water were carried out by the batch and continuous reactors which used aluminium and copper plate. In this systems, the phosphorus was removed by aluminium ion generated with the electrochemical interaction (pitting corrosion) of aluminium and copper. In the batch experiments, the efficiencies of phosphorus removal increased when the surfaces of aluminium and copper plate were brushed. The phosphorus removal by aluminium ion was affected the copper plate and NaCI in this system. The optimal pH values were 5 and 6 for the phosphorus removal. The efficiency of phosphorus removal increased with increasing NaCI concentration, surface area of aluminium and copper plate. The $CUSO_4{\cdot}5H_2O$ instead of copper plate could be used as Cu source. The effluent $PO_4-P$ concentration as low as 2 $mg/{\ell}$ could have been obtained during the continuous experiment at HRT of 48 hrs.

  • PDF