• Title/Summary/Keyword: reinforced concrete floor

Search Result 183, Processing Time 0.019 seconds

Applicability of Partial Post-Tension Method for Deflection Control of Reinforced Concrete Slabs (RC슬래브의 처짐제어를 위한 상향긴장식 부분PT공법의 적용)

  • Lee, Deuck-Hang;Kim, Kang-Su;Kim, Sang-Sik;Kim, Yong-Nam;Lim, Joo-Hyuk
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.3
    • /
    • pp.347-358
    • /
    • 2009
  • Recently, it is getting into a good situation for the flat-plate slab system to be applied. The flat-plate slab without beam, however, is often too weak to control deflection properly compared to other typical slab-beam structures, for which the post-tension method is generally regarded as one of best solutions. The post-tension (PT) method can effectively control deflection without increase of slab thickness. Despite this good advantage, however, the application of PT method has been very limited due to cost increase, technical problems, and lack of experiences. Therefore, in order to reduce difficulties on applying full PT method under the current domestic circumstances and to enhance constructability of PT system, this research proposed the partial PT method with top jacking anchorage applied in a part of span as need. For the top jacking anchorage system, the efficiency of deflection control shall be considered in detail because it can vary widely depending on the location of anchorage that can be placed anywhere as need, and tensile stresses induced at back of the anchorage zone also shall be examined. Therefore, in this study, analysis were performed on the efficiency of deflection control depending on the location of anchorage and on tensile stresses or forces using finite element method and strut and tie model in the proposed top jacking anchorage system. The proposed jacking system were also applied to the floor slabs at a construction site to investigate its applicability and the analysis results of slab behavior were compared to the measured values obtained from the PT slab constructed by the partial PT method. The result of this study indicates that the partial PT method can be very efficiently applied with little cost increase to control deflection and tensile stresses in the region as a need basis where problem exists.

Measurement of Verticality and Joint Gaps of a Near-surface Disposal Facility Vault Through a Mock-up Test for Fill-up Stages (표층처분시설 처분고의 목업테스트를 통한 채움단계별 수직도 및 이음부 벌어짐 측정)

  • Choi, Dong-Ho;Ann, Ki-Yong;Choi, In-Yong;Lee, Hyuk-Jin
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.537-544
    • /
    • 2021
  • In order to describe the fill-up stages of a near-surface disposal facility vault, a mock-up test is performed, and its behavior during the fil l -up stages is investigated. On an in-site concrete foundation with a l ength of 6600mm, a width of 6600mm and a thickness of 400mm, a reinforced concrete disposal vaul t is manufactured with 4 precast (PC) corner wal l s and 8 PC side wal l s. 36 wasted drums are pl aced on the 1st fl oor in 6 by 6, and then the empty space is fil l ed with grout fil l er. These processes are repeated up to the 5th floor, and the verticality and the joint gaps are measured for each fill-up stage. The verticality is measured using a level at 6 positions on each side wall (3 positions on the left and right sides, respectivel y), i.e. a total of 24 positions on the 4 side wal l s. The joint gaps are measured at 9 positions on each side wal l (3 positions on the left, center and right sides, respectively), I.e. a total 36 positions on the 4 side walls. To measure the joint gaps, crack tips are installed on the left and right sides of every joint gap, and vernier calipers are used. The measured verticality obtained through the mock-up test was found to be ±0.1° based on the initial stage (ST0), and the result of the joint gap was up to 0.38mm. This appears to have a negligible effect on the structure.

A Study of collapsed conditions of the stone pagoda in Mireuk Temple Site (미륵사지석탑 붕괴상태 고찰)

  • Kim, Derk-Moon
    • Korean Journal of Heritage: History & Science
    • /
    • v.38
    • /
    • pp.305-327
    • /
    • 2005
  • Although the stone pagoda in Mireuk Temple site, Iksan, Cholla Province has been collapsed long time ago, few historical record has clearly explained the reason why the pagoda was collapsed and when. The west side of the pagoda have been destroyed from top to the sixth floor and the broken or damaged stone materials have been piled up in disorder. the lower part in the west was reinforced and enclosed by a stone embankment levelled to the height of the first storey of the pagoda. With no record informing the historical fact when it was made and by whom, it is only presumed that the embankment may have been built long time ago in order to prevent remains from further destruction. In the second chapter of the study, it has been tried to restore a reasonable historical background of the pagoda based on records or comments found in literatures such as traditional poetry and essays in chronological order. The collapsed slope in the west side, just above the embankment surrounding the lower part of the pagoda, was concreted in 1915 during the Japanese colonial period. Then in 1998, the Jeollabukdo has examined the structural safety of the pagoda. The Cultural Properties Committee has decided have the concrete layer removed and moreover to take apart the whole pagoda. It is also included that the disassembled stone materials should be given proper conservation treatments before being put into the place where they were in the reassembling process. The front view of the collapsed phase of the pagoda was revealed when the concrete-covered layer was removed. A hypothesis was built that there may be as many different appearances of collapsed pagoda depending on natural causes such as earthquake, sunken foundation, flood and typhoon. In chapter three, characteristic features were classified by examining various images of pagodas destroyed by different natural reasons mentioned in historical records. The chapter four dealt with comparison and analysis on the conditions shown in the stone pagoda in Mireuk Temple site and other examples studied in advance. The result of the study revealed that though having been made higher than the ground surface, the podium or the base of the pagoda actually has been eroded by rain and water. The erosion is supposed not only to have been proceeded for a long time without break but also to have caused the first storey body stone in the west inclined to outward. It has come to a conclusion that the pagoda may have been lead to collapse when the first storey body stone, supporting the whole weight from the upper storeys, became out of upright position and lost its balance. However, no such distinctive features of structural changes shown in pagodas collapsed by natural causes like earthquake, typhoon or sunken basement, have been found in the stone pagoda in Mireuk Temple site.