• Title/Summary/Keyword: rebar construction method

Search Result 138, Processing Time 0.021 seconds

Post-yielding tension stiffening of reinforced concrete members using an image analysis method with a consideration of steel ratios

  • Lee, Jong-Han;Jung, Chi-Young;Woo, Tae-Ryeon;Cheung, Jin-Hwan
    • Advances in concrete construction
    • /
    • v.7 no.2
    • /
    • pp.117-126
    • /
    • 2019
  • When designing reinforced concrete (RC) members, the rebar is assumed to resist all tensile forces, but the resistance of the concrete in the tension area is neglected. However, concrete can also resist tensile forces and increase the tensile stiffness of RC members, which is called the tension stiffening effect (TSE). Therefore, this study assessed the TSE, particularly after yielding of the steel bars and the effects of the steel ratio on the TSE. For this purpose, RC member specimens with steel ratios of 2.87%, 0.99%, and 0.59% were fabricated for uniaxial tensile tests. A vision-based non-contact measurement system was used to measure the behavior of the specimens. The cracks on the specimen at the stabilized cracking stage and the fracture stage were measured with the image analysis method. The results show that the number of cracks increases as the steel ratio increases. The reductions of the limit state and fracture strains were dependent on the ratio of the rebar. As the steel ratio decreased, the strain after yielding of the RC members significantly decreased. Therefore, the overall ductility of the RC member is reduced with decreasing steel ratio. The yielding plateau and ultimate load of the RC members obtained from the proposed equations showed very good agreement with those of the experiments. Finally, the image analysis method was possible to allow flexibility in expand the measurement points and targets to determine the strains and crack widths of the specimens.

The Effect of Internal Restraint of Rebar in Shrinkage Stress Analysis of Concrete Slab in Multistory Building (고층건물 콘크리트 슬래브의 건조수축응력 해석에서 철근의 구속효과)

  • Kim Han-Soo;Kim Jae-Keun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.496-499
    • /
    • 2006
  • In this study, a practical method of shrinkage stress analysis on concrete slab in multi-story building is proposed, which considers both internal restraint and external restraint variation resulting from construction sequence. The shrinkage stress due to external restraint is obtained by multiplying relaxation coefficient to elastic shrinkage stress. The additional shrinkage stress due to internal restraint is obtained by residual strain of the elastic analysis. A verification example was analyzed and compared by the proposed method and commercial analysis program that is capable of time-dependent analysis of concrete. The results of 10-story example building show that the internal restraint of reinforcement increases the shrinkage stress considerably at the slabs under loose external restraint.

  • PDF

Development of design charts for concrete lining in a circular shaft (원형수직구 콘크리트라이닝 단면설계도표 개발)

  • Shin, Young-Wan;Kim, Sung-Soo;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.165-175
    • /
    • 2010
  • Recently, requirement of a long subsea tunnel has increased due to political, economical and social demands such as saving of distribution costs, improvement of traffic convenience, and regional development. Road and railroad tunnel need a shaft for construction and ventilation because of increase of tunnel length. Shaft diameter, lining sectional thickness and rebar quantity have to be determined for design of concrete lining in the shaft. A lot of structural analyses are needed for optimal design of concrete lining considering shaft diameter, load conditions and ground conditions. Design charts are proposed by structural analyses for various conditions in this study. A sectional thickness and rebar quantity can be easily determined using the proposed design charts.

Optimal Inventory Management for Rebar Fabrication Process in Construction Process (건설현장 철근작업 프로세스상의 적정 자재재고 관리 방안에 관한 연구)

  • Jung, Do-Young;Park, Sang-Hyuk;Kwak, Soo-Nam;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.702-707
    • /
    • 2006
  • There have been certain extent of material inventory in construction site because of difficulties in ordering by small quantity, strategy of securing future requirements and prevention of delay. However, carrying these inventory entails a financial cost called inventory holding cost and decrease construction productivity, so proper inventory management in construction industry is important for construction efficiency and cost reduction. This study tries to find analytical method of inventory management. It includes ordering decision which decide how much to order and when to order. Setting these strategies including deciding safety inventory, input and ouput variability are able to controled.

  • PDF

Evaluation of Flexural Performance of Reinforced Concrete Shear Walls According to Flexural Retrofit by Wall End Excavating (단부 파쇄형 휨 보강에 따른 철근콘크리트 전단벽 휨 성능 평가)

  • Cho, Ui-Jin;Kim, Su-Yong;Bae, Baek-Il;Choi, Chang-Sik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.4
    • /
    • pp.123-133
    • /
    • 2020
  • The purpose of this study is to analyze the method of retrofitting flexural strength and the flexural performance of retrofitted shear walls. There are various ways to reinforce the flexural strength of reinforced concrete shear wall structural systems that have already been built, in the case of that, the external force is increased, and the internal force is insufficient. However, there are various problems, such as excessive flexural stiffness after reinforcement and increasing the thickness and length of the wall. We have developed a retrofit method to solve these problems. The wall end is excavated to place the required vertical rebars, and concrete is poured after placing rebars. This is the same concept as creating wall end boundary elements later on. We also studied the anchorage method of reinforcement and the interaction method between the retrofitting end and the existing wall. The flexural test results for the reinforced concrete shear wall using the studied retrofit method can be predicted according to the sectional analysis and FEM analysis, and there are differences in the plastic hinge length, crack propagation, stiffness degradation and energy dissipation due to the bending depending on the vertical rebar ratio of wall end.

BIM based Data Exchange System of Welded Wire/bar Mat for Pre-fab RC Members (BIM 기반 프리패브 부재의 용접철근매트 정보교환 시스템)

  • Jung, Jae-Hwan;Kim, Do-Hyeong;Kim, Hyun-Gi
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.21-30
    • /
    • 2021
  • Reinforcing bars, a major component of the pre-fab structure, adheres to the existing on-site assembly method and attempts to develop and commercialize the technology of the pre-assembly method, but the effect is insignificant. Welded Wire / Bar Mat (WBM) has various advantages such as commercialization of rebar through machine manufacturing to improve workability, but it is different from the existing design and the construction method is different from the previous one. Therefore, to maximize the advantages of WBM and improve productivity, manufacturing, transportation, and construction from the design stage should be considered based on BIM from the initial design stage. In this paper, the concept of the design support system for the WBM was established based on the use of BIM in concrete reinforcement and the preliminary research on the WBM. WBM conversion design was performed for the existing prefabricated members, and based on this, the exchange format and system of the master prefabricated model with the WBM design data were set up. As a result of the pilot test, it was found that the traditional reinforcing bar information extracted from the master prefab model has transmitted 100% accurately. As for the WBM information, 100% of the information on the straight reinforcement was transmitted and represented, and the information on the bent reinforcement was found to have a 90% recall in the master BIM tool.

A Study on the Installation Method of Down Conductors of the Lightning Protection System, using Rebar in Reinforced Concrete Structures (철근콘크리트 구조물 내의 철근을 활용한 피뢰설비 인하도선의 설치방법에 관한 연구)

  • Lee, Young-Chul;Lee, Ju-Cheol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.7
    • /
    • pp.101-107
    • /
    • 2013
  • IEC Standards on lightning protection system specify the use of natural components as down conductors. This paper provides an analysis of problems revealed from our field investigation and survey conducted for the relevant experts in the construction site where natural components are used as down conductors. It also considers a suitable condition for installing natural components as down conductors in accordance with the latest version of the standard. As a result, when rebars of reinforced concrete are used as down conductors, vertical bars consisting of rebars of which thickness is not less than D13($127mm^2$) should be connected by welding, clamps or bound joints, using appropriate connection components conforming to IEC Standards. The lashed joints, however, shall not be applied for down conductors.

Investigation on the Spot for Grounding Systems in Buildings

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kim, Dong-Ook;Kim, Hyang-Kon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.3
    • /
    • pp.39-45
    • /
    • 2010
  • This paper deals with investigation on the spot for grounding systems of buildings based on international standards at construction sites. The investigation was carried out for grounding method, grounding type, shape of grounding electrode, grounding for a lightning protection system, continuity of steelwork in reinforced concrete structures, etc. The investigation on the spot was performed by a researcher and engineer with over fifteen years of industry experience all over the country. As a result of the investigation on the spot in 13 buildings, common grounding and structure grounding methods were dominant. The safety improvement methods include installation of equipotential bonding conductors for the connection to the main earthing terminal, equipotential bonding conductors for supplementary bonding, use of Surge Protective Devices (SPD), and safe connections between earthing conductors and the rebar.

A Study on the Functional Unit Trend of Carbon Dioxide Emission in the Construction Materials between 2000, 2003 and 2005 (건축재료의 이산화탄소 배출원단위 변화추이연구)

  • Lee, KangHee;Lee, HaShik;Yang, JaeHyuk
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.123-129
    • /
    • 2010
  • This study aimed at analyzing the trend of carbon dioxide emission for direct and indirect areas by using inter industry relations table between 2000, 2003 and 2005 in the key building materials and components. Results of this study are as follows; First, the material and components for this study was selected in 20 industries of products such as sand, gravel, cement, concrete articles, rebar, and steel bar. Second, among the 20 selected key building materials, the group with the highest carbon-dioxide emission was shown in ready-mixed concrete, concrete articles, and primary aluminum goods. Third, as a result of analyzing the changes to the units of carbon dioxide emission according to passage of time, the number of items which is changed in such as sustained increase or decrease over time was insignificant in carbon-emission change trend.

Experimental study on through-beam connection system for concrete filled steel tube column-RC beam

  • Tian, Chunyu;Xiao, Congzhen;Chen, Tao;Fu, Xueyi
    • Steel and Composite Structures
    • /
    • v.16 no.2
    • /
    • pp.187-201
    • /
    • 2014
  • A new through-beam connection system for a concrete filled steel tube column to RC beam is proposed. In this connection, there are openings on the steel tube while the reinforced concrete beams are continuous in the joint zone. The moment and shear force at the beam ends can be transferred to column by continuous rebar and concrete. The weakening of the axial load and shear bearing capacity due to the opening of the steel tube can be compensated by strengthening steel tube at joint zone. Using this connection, construction of the joint can be made more convenient since welding and hole drilling in situ can be avoided. Axial compression and reversed cyclic loading tests on specimens were carried out to evaluate performance of the new beam-column connection. Load-deflection performance, typical failure modes, stress and strain distributions, and the energy dissipation capacity were obtained. The experimental results showed that the new connection have good bearing capacity, superior ductility and energy dissipation capacity by effectively strengthen the steel tube at joint zone. According to the test and analysis results, some suggestions were proposed to design method of this new connection.