• Title/Summary/Keyword: rebar construction

Search Result 336, Processing Time 0.024 seconds

Effect of Bacteria on the Rebar Corrosion (철근 부식에 자기치유 박테리아가 미치는 영향)

  • Jang, Indong;Park, Jiyoon;Son, Dasom;Yi, Chongku
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.221-222
    • /
    • 2021
  • Bacterial self-healing concrete is known to improve the durability of concrete by preventing the propagation of microcracks. In the literature, bacteria prevent the corrosion of rebar by inhibiting water transfer through crack, but also can promote the corrosion by acting as an ion acceptor in the rust generation mechanism. Therefore in this study, the electrochemical analysis of bio-filmed rebar was conducted to explore the effects of the self-healing bacteria on the bare rebar without cement composite. As a result of the experiment contradicting trends for Ecorr and Icorr occurred and additional experiment will be conducted in various environments to collect data on the mechanism of corrosion of rebar by bacteria.

  • PDF

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • v.15 no.3
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

Corrosion of Rebar by Chlorides and Concrete Durability

  • Hong, Naifeng
    • Corrosion Science and Technology
    • /
    • v.3 no.3
    • /
    • pp.127-130
    • /
    • 2004
  • Throughout the world, corrosion of rebar in concrete is a main form for concrete building destruction. The chloride is prime criminal. This paper presents the harm of chloride corrosion in China, the effect of chloride corrosion on the durability of concrete buildings and protection strategies for rebar corrosion.

Numerical simulation approach for structural capacity of corroded reinforced concrete bridge

  • Zhou, Xuhong;Tu, Xi;Chen, Airong;Wang, Yuqian
    • Advances in concrete construction
    • /
    • v.7 no.1
    • /
    • pp.11-22
    • /
    • 2019
  • A comprehensive assessing approach for durability of reinforced concrete structures dealing with the corrosion process of rebar subjected to the attack of aggressive agent from environment was proposed in this paper. Corrosion of rebar was suggested in the form of combination of global corrosion and pitting. Firstly, for the purposed of considering the influence of rebar's radius, a type of Plane Corrosion Model (PCM) based on uniform corrosion of rebar was introduced. By means of FE simulation approach, global corrosion process of rebar regarding PCM and LCM (Linear Corrosion Model) was regressed and compared according to the data from Laboratoire $Mat{\acute{e}}riaux$ et $Durabilit{\acute{e}}$ des Constructions (LMDC). Secondly, pitting factor model of rebar in general descend law with corrosion degree was introduced in terms of existing experimental data. Finally, with the comprehensive numerical simulation, the durability of an existing arch bridge was studied in depth in deterministic way, including diffusion process and sectional strength of typical cross section of arch, crossbeam and deck slab. Evolution of structural capacity considering life-cycle rehabilitation strategy indicated the degradation law of durability of reinforced arch bridges.

Measuring Rebar Position Error and Marking Work for Automated Layout Robot Using LiDAR Sensor (마킹 로봇의 자동화를 위한 LiDAR 센서 기반 철근배근 오차 측정 및 먹매김 수행 프로세스 연구)

  • Kim, Taehoon;Lim, Hyunsu;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.209-220
    • /
    • 2023
  • Ensuring accuracy within tolerance is crucial for a marking robot; however, rebar displacement frequently occurs during the structural work process, necessitating corrections to layout lines or rebar locations. To guarantee precision and automation, the marking robot must be capable of measuring rebar error and determining appropriate adjustments for marking lines and rebar placement. Consequently, this study proposes a method for measuring rebar location error using a LiDAR sensor and implementing a layout assessment process based on the measurement results. The rebar recognition experiment using the LiDAR sensor yielded an average error of 5mm, demonstrating a reliable level of accuracy for wall rebars. Additionally, this research proposed a process that enables the robot to evaluate rebar and marking corrections based on the error range. The findings of this study can contribute to the automated operation of marking robots while accounting for construction errors, potentially leading to improvements in structural quality.

An algorithm of marking line correction for robot-based layout automation of building structures

  • Lim, Hyunsu;Kim, Taehoon;Cho, Kyuman;Kim, Taehoon;Kim, Chang-Won
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.312-318
    • /
    • 2022
  • Robot-based layout automation has been recently promoted for the purpose of improving productivity and quality. Marking robots have various functional demands to secure marking precision and environmental adaptability. In particular, in order to automate marking work of building structure, correction of the marking line through position recognition of rebars placed is required. Because the rebars must maintain a constant cover thickness from the formwork surface, if the rebars are out of planned position, the rebar or marking line need to be corrected to secure the cover thickness. Thus, the marking robot for structural work needs to have the function for determining the position correction of the rebar or the marking line. In order to judge the correction of marking line, it is required to measure the distance between the planned marking line and the rebar placed. Therefore, this study proposes an algorithm that can measure the distance between the planned line and the rebar, and correct marking line for the automatic operation of the marking robot. The results of this study will be utilized as a core function for unmanned operation of the marking robot and contribute to securing precise marking by reflecting construction errors.

  • PDF

Corrosion of rebar in carbon fiber reinforced polymer bonded reinforced concrete

  • Bahekar, Prasad V.;Gadve, Sangeeta S.
    • Advances in concrete construction
    • /
    • v.8 no.4
    • /
    • pp.247-255
    • /
    • 2019
  • Several reinforced concrete structures that get deteriorated by rebar corrosion are retrofitted using Carbon Fiber Reinforced Polymer (CFRP). When rebar comes in direct contact with CFRP, rebar may corrode, as iron is more active than carbon. Progression of corrosion of rebar in strengthened RC structures has been carried out when rebar comes in direct contact with CFRP. The experimentation is carried out in two phases. In phase I, corrosion of bare steel bar is monitored by making its contact with CFRP. In phase II, concrete specimens with surface bonded CFRP were casted and subjected to the realistic exposure conditions keeping direct contact between rebar and CFRP. Progression of corrosion has been monitored by various parameters: Half-cell potential, Tafel extrapolation and Linear Polarisation Resistance. On termination of exposure, to find residual bond stress between rebar and concrete, pull-out test was performed. Rebar in contact with CFRP has shown substantially higher corrosion. The level of corrosion will be more with more area of contact.

A Study on Application of Automated Inspection System for Rebar Inspection using 3D Scanner (3D 스캐너를 활용한 철근 자동검측방식의 현장적용성 연구)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Myung-Do;Kim, Chang-Won;Cha, Min-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.157-158
    • /
    • 2019
  • Reinforcing bars are an important material for tensile strength of structures. For this reason, the inspection of the reinforcing bars confirming the layout and omission is very important for the safety of the structures. However, the current method of inspecting of the reinforcing bars through photographs of specific areas is difficult to identify condition all reinforcing bars. And It is also difficult to confirm after completion of a building. Therefore, reinforcing bar inspection using 3D scanner is required for automation of rebar inspection and database construction. For this purpose, this study test application of automated inspection method for rebar inspection using 3D scanner and discuss the effect of this method.

  • PDF

Considerations When Quantity Take-Off of Rebar Based on the BIM Model (BIM Model 기반 철근 수량산출 시 고려사항)

  • Jeong, Seo-Hee;Kim, Ju-Yong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item