• Title/Summary/Keyword: railway substructure

Search Result 51, Processing Time 0.023 seconds

Investigation of Improvement Scheme for the Curve Sections on the Conventional Line Prepared for the Tilting Train Service (틸팅열차 상용화대비 기존선 곡선구간 개량방안 검토)

  • An, Gang-Yell;Lee, Chang-Hun;Yoo, Keun-Su;Kim, Joung-Tea
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.897-904
    • /
    • 2008
  • The major objective of this study is to investigate the effective improvement plan for the curve sections in the conventional lines which the tilting train runs on. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks and is operating at abroad, was been studying to be suited to natural features. So, in this paper we investigate the improvement method at the sections only where need the extension of the transition curves, and the present status of them for the effective tiling train service using results which were examined on the preceding study which was the development of track system innovation technology for speed-up of them. And we look forward to playing a decisive role as reference material for the decision of the linear fitness in order to operate effectively on the conventional lines for the commercial service of the tilting train, on the basis of checking out the sufficient condition concerned in the track alignment and the velocity which are required in the railway construction rules and the design criteria.

  • PDF

Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service (틸팅열차 상용화대비 기존선 인프라시스템의 효율적 유지보수체계 검토)

  • Yoo, Keun-Su;Lee, Chang-Hun;An, Gang-Yell;Kim, Joung-Tea
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.79-87
    • /
    • 2008
  • The major objective of this study is to investigate the effective maintenance system for the infrastructure on the conventional lines in which the tilting train runs. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks was developed. Besides, the efficiency prediction and the linear fitness of the existing conventional lines for a tiling train service were examined on the preceding study which was the development of track system innovation technology for speed-up of them. So, in this paper we propose the more effective maintenance method than the existing it in order to securing the high reliability and safety classified by the infrastructure, in analyzing foreign materials and the maintenance as well as the inspection cycle concerning domestic infrastructures of the track and the catenary etc. on the railway. And we look forward to playing a decisive role as reference material for the effective improvement of the existing maintenance about the infra on the conventional lines for the commercial service of the tilting train.

  • PDF

Adaptive compensation method for real-time hybrid simulation of train-bridge coupling system

  • Zhou, Hui M.;Zhang, Bo;Shao, Xiao Y.;Tian, Ying P.;Guo, Wei;Gu, Quan;Wang, Tao
    • Structural Engineering and Mechanics
    • /
    • v.83 no.1
    • /
    • pp.93-108
    • /
    • 2022
  • Real-time hybrid simulation (RTHS) was applied to investigate the train-bridge interaction of a high-speed railway system, where the railway bridge was selected as the numerical substructure, and the train was physically tested. The interaction between the two substructures was reproduced by a servo-hydraulic shaking table. To accurately reproduce the high-frequency interaction responses ranging from 10-25Hz using the hydraulic shaking table with an inherent delay of 6-50ms, an adaptive time series (ATS) compensation algorithm combined with the linear quadratic Gaussian (LQG) was proposed and implemented in the RTHS. Testing cases considering different train speeds, track irregularities, bridge girder cross-sections, and track settlements featuring a wide range of frequency contents were conducted. The performance of the proposed ATS+LQG delay compensation method was compared to the ATS method and RTHS without any compensation in terms of residual time delays and root mean square errors between commands and responses. The effectiveness of the ATS+LQG method to compensate time delay in RTHS with high-frequency responses was demonstrated and the proposed ATS+LQG method outperformed the ATS method in yielding more accurate responses with less residual time delays.

Research directions for maintenance criteria in Slab Track (콘크리트궤도 유지보수기준 정립을 위한 연구방향)

  • Eom, Jong-Woo;Lee, Myung-Suk;Kwon, Jin-Soo;Kim, Soo-Jung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.979-987
    • /
    • 2011
  • The Ballast Track has been widely applied in traditionally due to low initial cost and abundant elastic property. But the disadvantages of Ballast track are; labor-intensive and costly maintenance, weak in high-speed and heavy axial load, in additionally need wide cross section of tunnel and massive substructure in viaduct. Therefore, recent applications tend to more and more towards slab track such as Gyeungbu high speed rail and existing line. The slab track increased the stability, resistance and durability of track, and save maintenance cost compare to the Ballast Track. But the slab track have weakness of track elongation by sub-ballast differential settlement and that threat safety of train operation. Therefor the slab track need to prevent cracks in concrete ballast for insure the durability of slab track. In this paper, review main items and its expected effects of the slab track maintenance standards that control sub-ballast settlement and concrete ballast cracks.

  • PDF

Experimental Study of Stiffness transition zone by using Moving Wheel Loads (이동하중에 의한 지지강성 변화구간에 대한 실험적 연구)

  • Lee, Jin-Wook;Choi, Chan-Yong;Lee, Seong-Hyeok;Park, Tae-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1056-1061
    • /
    • 2007
  • Railroad roadbed was consisted into structure types that earthwork, tunnel, bridge and joint sections. Joint section was affected a large factor confidence and safety of the train running by stiffness transition zone that track substructure stiffness change section as like between tunnel and earthwork from ballast track to concrete track. These problems are the results of increased dynamic wheel loads, which also lead to wear and tear on vehicle components and contribute to poor ride quality. The study presented in this paper was conducted on model test by using Wheel Moving Loading System.

  • PDF

Nonlinear Analysis with contact element between old and new concrete (Contact 요소를 이용한 신.구 콘크리트의 비선형 해석)

  • Cho, Sun-Kyu;Lee, John-Sun;Jeong, Woo-Cheol;Lee, John-Shin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1050-1055
    • /
    • 2007
  • In the case of a rail road bridge extension work, especially single track to double track, the foundation of new substructure which supports the extended part of superstructure could be interfered by the exist foundation of an old bridge. When these two foundations are jointed to prevent such fatal effects of the structure as unequal subsidence of soil foundations, it is important to prove the structural behaviour of the joining surfaces between new foundation and old foundation. 3-Dimensional Finite Element Analysis Method have been studied for the solutions of the structural behaviour of the foundations. In this analysis, 'Contact Element' which allows the sliding of each adjoining member is used for the joint of the boundary surface of the old and new pier foundations. Furthermore, Material Nonlinear Behaviour Analysis also supports the accuracy of the result in this study because the foundations consist of concrete main bodies and reinforced steel bars. These detailed analyses secure the verification of the structural safety of the foundations in the extension work more firmly.

  • PDF

A Study of Longitudinal Forces and Displacements in a Multi-Span Bridge Equipped with a CWR Track (장대레일이 설치된 교량에서의 축방향 변위 및 축력 변화 연구)

  • Lee, Joo-Heon;Huh, Young
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.442-449
    • /
    • 1999
  • Due to temperature variations, considerable longitudinal rail forces and displacements may develop in continuous welded rail(CWR) track on long-span bridges or viaducts. Excessive relative displacements between sleepers and ballast bed may disturb the stable position of the track in the ballast which results in a lower frictional resistance. Generally, these problems are solved by installing rail expansion devices. However the application of expansion devices in high-speed tracks on existing bridges, as a means to prevent excessive longitudinal displacements and forces, is not attractive method due to comfort, safety and maintenance aspects. An alternative and very effective solution is possibly the use of so-called zero longitudinal restraint(ZLR) fastenings over some length of the track. The calculations, carried out in this respect, show a considerable reduction of track displacements, track forces, and the relative sleeper/ballast displacements. This reduction depends on the length over which these fastenings are installed. In this paper calculations of the longitudinal displacments and forces in a CWR track and substructure resulting from thermal, mechanical and kinematical loads were carried out using the FEM analysis program LUSAS

  • PDF

The Comparative Analysis of Slipstream Phenomena by High-Speed and Traditional Train (고속(KTX) 및 기존 철도차량의 열차풍 현상 비교 분석)

  • Kim, Dong-Hyeon;Jang, Yong-Jun
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.31 no.2 s.257
    • /
    • pp.173-180
    • /
    • 2007
  • A series of field tests were performed to develop aerodynamic characteristic evaluation method and countermeasure technology in conventional and high-speed railway. The strength of rolling stock-induced wind which affect the people and substructure in platform and nearby track were investigated. The slipstream of passing trains was measured by hot-wire array system. The speed of trains was 110 - 125km/h for conventional ones and 300km/h for high-speed ones. The streamlined shape trains cause about 50% smaller-scale slipstream compared to the non-streamlined ones.

Trial Installation and Performance Evaluation of Prefabricated Concrete Slab Track on Revenue Line (프리캐스트 콘크리트 슬래브궤도의 영업선 시험시공 및 성능평가)

  • Jang, Seung-Yup;Kang, Yun-Suk;Lee, Hu-Sam;Kim, Yu-Bong;Lee, Jong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.840-845
    • /
    • 2008
  • To develop our original technology of concrete slab track, being widely accepted for new track, prefabricated concrete slab track, or precast concrete slab track has been developed. They have two different types according to slab shape and its dimensions, connection of slabs and connecting structure onto substructure. After the system design and successful performance evaluation in the laboratory, the trial installation on revenue line has been carried out. This paper is presenting the result of the trial installation and the performance tests in field. The performance tests have been performed as visual inspection for cracks and damages, measurement of track alignment and elastic behavior of track under passing trains. The performance test results during last 2 years have shown that no remarkable damages and settlements were found, and track alignment and elastic track behavior both exhibits good status.

  • PDF

Load Carrying Capacity of Geosynthetic Reinforced Railway Subgrade Under Cyclic Load (토목섬유 보강재로 보강된 철도 노반의 반복하중 하중지지력 연구)

  • Hong, SeungRok;Cho, Yungyu;Choi, JungHyuk;Jeong, Yongjun;Yoo, ChungSik
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.4
    • /
    • pp.109-121
    • /
    • 2013
  • This paper studied the characteristics of bearing capacity of railway reinforced with geosynthetic against repetitive loading of train. The railway that was based on the porous pavement substructure ground and reinforced with geosynthetic was copied. In order to analyze load carrying capacity of geosynthetic, we have had 3cases experiments - in the first case, the ground was non reinforced, second case was reinforced geocell and last case was reinforced geogrid - and all of them were reduced-scale laboratory tests. The results of the analyses indicated that the bearing capacity of the reinforced geogrid increases much more than the reinforced geocell. Residual deformation of the initial cyclic load was larger than the secondary cyclic loads.