• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.022 seconds

Interference Device for Noise Reduction of Railway (철도소음 저감을 위한 간섭장치개발)

  • 장강석;심상덕;김영찬;김두훈
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.537-542
    • /
    • 2000
  • When visual intrusion Is an Important factor, it is desirable to find alternative methods of Improving the insertion loss of a noise barrier without Increasing the height. Therefore, the primary object of the work attenuate the noise due to railway by small interference device installed at noise barrier edge. In this paper the performance of noise barriers with attached interference device, in terms of shape, absorptive material and split panel, we examined using the boundary element approach. Also, the scale models are mounted in an anechoic chamber and the frequency of the sound sources are appropriately scaled to simulate full scale site conditions. Lastly, experimental measurements of the designs are executed for a range of frequencies and receiver positions, and are compared with the results of numerical modeling.

  • PDF

Improved Morphing Visualization Methodology for Effective 4D Expression of Railway Facility (철도시설의 효율적 4D구현을 위한 개선된 Morphing 시각화 방법론 구축)

  • Moon, Hyoun-Seok;Kwon, Jung-Hui;Kim, Chang-Hak;Ji, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.350-353
    • /
    • 2006
  • Generally, 4D CAD can be used for visualizing construction schedule information in railway construction project. It is important that 3D CAD object should be represented by real construction situation according to construction site condition. However, it is difficult to visualize real construction situation in 4D CAD viewer because 3D objects should be separated by limited duration of each activity. This study suggests a morphing technology for visualizing 4D object by each activity schedule according to real construction progress.

  • PDF

Investigation on dynamic behaviour of conventional railway bridge subjected to high speed train loading (고속열차 주행에 따른 기존철도교의 동적거동 특성분석)

  • 오지택;양신추;민경주;이종득
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.79-86
    • /
    • 1998
  • The purpose of this paper is to examine the validation to passage of high speed train on conventional railway bridges. The dynamic behavior of bridge is analyzed by using the developed 3-D program. The train is assumed to moving loads and track to distributed masses. The centrifugal force due to curved track is also considered. The numerical results are compared with those measured in the site to demonstrate the efficiency of the developed program. From the parametric study, it is notified that conventional bridge gives good serviceability to passage of high speed train, specially such as TGV-K.

  • PDF

Introduction Plan of Qualification System for Handlers in Automatic Connection·Disconnect System (자동 연결·분리 시스템 취급자 자격제도 도입방안)

  • Jong-Bok You;Jai-Hyun Kim;Mi Jeong Lee;Jong-Bae Baek
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.3
    • /
    • pp.68-74
    • /
    • 2024
  • Despite the growing importance of safe railroad operation with the recent implementation of the Severe Accident Punishment Act, industrial accidents related to the shunting of railway vehicles persist. Therefore, the government and Korea Railroad Corporation are collaborating on an automated connection and disconnection system that enables remote control of shunting trains from a central control room, utilizing surveillance cameras. By eliminating the need for on-site workers during freight car operations at stations, it aims to reduce safety accidents inherent in manual receiving processes. A qualifying government-issued railway vehicle driver's license is necessary to handle this newly developed automatic connection and disconnection system. As a result, this study aims to establish an appropriate driver qualification system.

Applicability of Dynamic Compact Pilot Test on Waste Landfill (폐기물 매립장에서 동다짐공법의 적용성에 관한 연구)

  • 천병식;임병수;김명진
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.418-425
    • /
    • 2000
  • In this study, the evaluation for utilization of waste landfill was performed by field test to use waste landfill as construction site(Nangido in Seoul). The site where dynamic compaction test was carried out was divided by 4 yards. Yard 1, 2 were not eliminated widening of cover soil and Yard 3, 4 were eliminated it. Dynamic Compaction Pilot Test was carried out by the 15ton heavy tamper with drop height of 20m in Yard 1, 3 and with drop height of 15m in Yard 2, 4 We evaluated the compaction ability, optimum compaction number and noiseㆍvibration through field test, monitoring. To make use of waste landfill as a construction site, The dynamic compaction method is suitable for using in waste landfill as a construction site among the ground improvement methods.

  • PDF

Study on Effectiveness of Selection for Railway Ballast : Case Study on A Quarry in northen France (철도 밸러스트 선정 효율성에 대한 고찰 : 프랑스 채석장에 대한 사례연구)

  • Woo, Ik
    • Tunnel and Underground Space
    • /
    • v.25 no.6
    • /
    • pp.487-495
    • /
    • 2015
  • The specification for selecting railway ballast in France is introduced in this study and the effectiveness of selection for railway ballast is studied for the case of a quarry located in northen France. The quality of railway ballast is, in general, estimated depending on the grain distribution and mainly of the resistance against abrasion. The resistance against abrasion is obtained by both Los Angeles abrasion test and Micro Deval test, which determine the ballast quality suitable whether for high speed railway or classical railway. This study analyzed the correlation between the abrasion index obtained from the abrasion tests for the aggregates sampled at three different stages among ballast production procedure at the quarry. A high correlation is determined between Los Angeles Abrasion index (LA) and Micro Deval index (MDA) and also between abrasion indices of different aggregates. Particularly, this correlation between the abrasion indices allows to estimate the quality of ballast at the final stage from the aggregates at the site in a quarry within the margin of error.

An experimental construction of railway steel plate girder strengthen adding ballast system by transport equipment (선로 이송 가설공법을 적용한 철도판형교 유도상화)

  • Min, Ji-Hong;Seo, Jong-Won;Jang, Hyeong-Sik;Park, Joon-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.707-716
    • /
    • 2011
  • It has been applied using cranes or insertion methods to install heavy structures to strengthen existing railway bridges. These methods are uneconomical because of two reasons. The first one is it is required to construct approach roads for heavy equipment and/or working yard. The second one is the electric lines shall be cutoff during construction. Both require additional construction cost and duration. In this study, new transport equipment was developed which can be applied to heavy structures up to 100 ton. Using this method, the heavy structure can be loaded into the new transport equipment at working yard and transported to the working site. This method can be applied, but not limited to railway bridge or roadbed rehabilitation. It was found that the precious construction can be achieved to install heavy structure using this method. The experimental construction to make non-ballast girder bridge composite with new pc deck slab using this method was carried out for Jewon bridge. The example bridge is in extreme condition because it locates above national road #38 within extreme transition curve and has 10 ‰ slope and skew. The experimental construction results were satisfactory both for safety and construction precision.

  • PDF

The Study for the Assessment of the Noise Map for the Railway Noise Prediction Considering the Input Variables (철도소음예측시 입력변수의 영향을 고려한 소음지도 작성 및 평가)

  • Lee, Jaewon;Gu, J.H.;Lee, W.S.;Seo, C.Y.
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.4
    • /
    • pp.295-300
    • /
    • 2013
  • The noise map can be applied to predict the effect of noise and establish the noise reduction measure. But the predicted value in the noise map can vary depending on the input variables. Thus, we surveyed the several prediction models and analyzed the changes corresponding to the variables for obtaining the coherency and accuracy of prediction results. As a result, we know that the Schall03 and CRN model can be applied to predict the railway noise in Korea and the correction value, such as bridges correction, multiple reflection correction, curve correction must be used for reflecting the condition of the prediction site. Also, we know that the prediction guideline is an essential prerequisite in order to obtain the unified and accurate predicted value for railway noise.

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

Investigation of Soil and Groundwater Contaminated by Gasoline and Lubricants Around a Railroad Station in S City, Korea

  • Lee, Hwan;Lee, Yoonjin
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.6
    • /
    • pp.529-540
    • /
    • 2012
  • Objective: This research was performed to evaluate the state of oil pollution in an area surrounding a railway station that has over 100 years of business history as a railway station in S City, Korea. The amount of polluted soil was estimated, and the target area for remediation was assessed in this study to restore the oil-polluted area. Methods: To accomplish this aim, five observation wells were installed for the sampling of groundwater, and soil was sampled at 33 points. Electric resistance studies and a trench investigation were undertaken to understand the geological conditions of the site, and the groundwater movement in this area was simulated by MODFLOW. Physiochemical analyses were conducted to determine the quality of the groundwater and the current state of oil pollution influenced by that of the soil. Results: The mean level of total petroleum hydrocarbons (TPHs) in this area was 1,059 mg/kg, and the area for remediation was determined to be 7,610 mg/kg. Levels of benzene, toluene, ethylbenzene, and xylene (BTEX) were determined to be under the legal standard. Conclusion: In terms of depth, the biggest area polluted by TPH found was between 0 and 1 m from ground level, and the affected area was 5,900 $m^3$. TPHs were not detected in groundwater. Diesel and lubricating oil were the main causes of TPH pollution at this railway station.