• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.024 seconds

A study on full-face sequential blasting using electronic detonator (전자뇌관을 이용한 수직구 전단면 다단시차 분할 발파에 대한 연구)

  • Yoon, Ji-Sun;Kim, Su-Hyun;Bae, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.177-184
    • /
    • 2008
  • In this study, in order to reduce appeals regarding vibration and noise from blasts, the optimum delay-time of the electronic detonator, which can minimize blast vibration, is found through blast-waveform composition and blasting simulation, and we have developed the full-face Sequential Blasting Method based on the studies of damping properties of full-face section blasting. The optimum delay-time of the electronic detonator and Full-face Sequential Blasting Method using electronic detonator was applied to the Gyeongbu high-speed railway construction site to test the feasibility of this method.

  • PDF

Development of Up-Down Turnout System of AGT for Reduction of Construction costs (건설비 절감을 위한 고무차륜 경량전철 상하식분기기 개발)

  • Cha, Kwon-Jung;Yoon, Il-Ro;Kim, Dong-Howal;Fukumoto, Yozo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.745-752
    • /
    • 2011
  • Light Rail Vehicle(LRT) is "New Transit System" that has transportation capacity as well as physical size of vehicle is in-between bus and subway. The demand of LRT system is increasing rapidly; both domestically and internationally. Reason being is that it is more economical and eco-friendly compare to existing heavy rail vehicle. Especially, Busan Subway Line 4 K-AGT (Rubber-tired LRT) being the first of its kind to start revenue service in Korea, it is very much likely that application of its demand will continue to increase. Considering its trend, study to reduce implementation cost of LRT is being pursued in many different aspects; reducing construction cost is one that aspect. In this study, on-site application of 'Up-Down Turnout System' implementation research has been carried out which can replace existing 'Left-Right Turnout System'. When safety of its type gets verified, application of this system to line which intends to use K-AGT, Shin-Lim Line and Dong-Book Line, expects to save its construction cost. This thesis paper reports ongoing research of AGT 'Up-Down Turnout System' development and main component design factors, fundamental principle, performance test result.

  • PDF

The Study of Pullout-Behavior Characteristics of The Ground Anchor Using Expanded Hole (확공을 이용한 지압형 앵커의 인발거동 특성 연구)

  • Min, Kyong-Nam;Jung, Chan-Mook;Jung, Dae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1502-1508
    • /
    • 2011
  • Ground anchor expands the hollow wall of settled part and has the structure which resists the designed tensile load by the bearing pressure generated by the wedge of the anchor body pressing in the expanded part. Such ground anchor has been recognized for stability and economicality since 1960s in technologically advanced nations such as Japan and Europe, and in 1970s, the Japan Society of Soil Engineering has established and announced the anchor concept map. The ground anchor introduced in Korea, however, has the structural problem where the tensile strength is comes only from the ground frictional force due to expansion of the wedge body. In an interval where the ground strength is locally reduced due to fault, discontinuation or such, this is pointed out as a critical weakness where the anchor body of around 1.0m must resist the tensile load. Also, in the installation of concrete block, the concentrated stress of concrete block constructed on the uneven rock surface causes damage, and many such issues in the anchor head have been reported. Thus, in this study, by using the expanded bit for precise expansion of settled part, the ground anchor system was completed so that the bearing pressure of ground anchor can be expressed as much as possible, and the bearing plate was inserted into the ground to resolve the existing issues of concrete block. Through numerical analysis and pullout test executed for verification of site applicability, the pullout-behavior characteristics of anchor was analyzed.

  • PDF

A Study on the Safety Braking Distance in ATP System (ATP시스템의 안전제동거리에 대한 연구)

  • Kim, Min-Kyu;Kim, Min-Seok;Kim, Jong-Soo;Yun, Yu-Boem;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.132-139
    • /
    • 2011
  • ATP(Automatic Train Protection) system in railroad signalling system is on-board signalling system which is controlled by train control information such as location and speed of trains. Safety is ensured by transmitting the train control information between on-board and wayside device in the ATP system. When an engineer disregards the speed limit on a tachometer, the train is automatically stopped by the on-board device. Recently, the studies of increasing speed of the train have been developed. Eurobalise in ERTMS/ETCS system is used in case that speed of trains is up to 500[km/h]. A study of safety braking distance is needed by increasing the speed of train in the ATP system. Train data and track data are required to calculate the safety braking distance. The train data includes formations of trains, length of trains, service brake and emergency brake etc. Also, the track data includes slope of track, curve of track, length of track, speed limit etc. In this paper, the speed profile is computed by analyzing the train and track data in the ATP system. It is demonstrated by applying to subway line 2 in Seoulmetro through the on-site test.

  • PDF

Performance Evaluation of Swing-Nose Crossing Turnout on Slab Track (2) (콘크리트궤도용 고속분기기 성능평가 (2))

  • Kim, Si-Chul;Kim, Man-Cheol;Hwang, Kwang-Ha;Lee, Dong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.717-724
    • /
    • 2011
  • In order to commercialize the track systems including the turnouts developed in Korea, the guideline of technical and systematic performance evaluation considering local environment was established on Aug. 2010. It consists of a technical compatibility, laboratory test and in-service test. Technical compatibility and laboratory test of the domestically-developed swing-nose crossing turnout on slab track(F18.5) were evaluated according to the guideline. And then in-service test was performed for the turnout installed at the 2nd phase site of Kyung-Bu HSR. In-service test is comprised of monitoring, and field and on-board test during KTX operation, where monitoring is to check the maintainability, and field and on-board test is to confirm structural and running safety. This paper is intended to explain the requirements for the in-serve test and analyze the results of monitoring and the data measured at field and on-board. Based on the in-service test, it is proven that performance of the domestically-developed swing-nose crossing turnout on slab track(F18.5) well satisfies the requirements of the guideline.

  • PDF

Stability analysis of a rock slope in Himalayas

  • Latha, Gali Madhavi;Garaga, Arunakumari
    • Geomechanics and Engineering
    • /
    • v.2 no.2
    • /
    • pp.125-140
    • /
    • 2010
  • Slope stability analysis of the right abutment of a railway bridge proposed at about 350 m above the ground level, crossing a river and connecting two huge hillocks in the Himalayas, India is presented in this paper. The site is located in a highly active seismic zone. The rock slopes are intensely jointed and the joint spacing and orientation are varying at different locations. Static slope stability of the rock slope is studied using equivalent continuum approach through the most commonly used commercial numerical tools like FLAC and SLOPE/W of GEOSTUDIO. The factor of safety for the slope under static conditions was 1.88 and it was reduced by 46% with the application of earthquake loads in pseudo-static analysis. The results obtained from the slope stability analyses confirmed the global stability of the slope. However, it is very likely that there could be possibility of wedge failures at some of the pier locations. This paper also presents the results from kinematics of right abutment slope for the wedge failure analysis based on stereographic projections. Based on the kinematics, it is recommended to flatten the slope from 50o to 43o to avoid wedge failures at all pier locations.

A study on the acoustic performance test method using speaker of a noise reduction device for noise reduction of the 400km/h class high-speed railroad (스피커를 이용한 400km/h급 고속철도 소음저감용 방음벽 상단장치의 음향성능 시험방법에 관한 연구)

  • Yoon, Je-Won;Kim, Young-Chan;Jang, Kang-Seok;Eum, Ki-Young;Jang, Seung-Ho
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.04a
    • /
    • pp.625-629
    • /
    • 2014
  • For the purpose of the acoustic performance evaluation of noise reduction device(NRD) installed at the top of noise barrier for further decreasing of noise level of 400km/h class high-speed railroad(HEMU), the acoustic performance test method using speaker instead of really running railway vehicle was suggested in this paper. For this, noise source location and frequency spectrum of HEMU was analyzed through the field noise test. These data were used for the determination of speaker's installation positions and frequency correction values applied to the speaker noise source. And, 400 meters long NRD was installed at the site where HEMU will be running at a speed of 400km/h. Finally, the outdoor speaker test with and without NRD showed that this NRD could decrease noise level even more than 3dB(A). In the future, the acoustic performance results of NRD conducted with speaker test will be compared with that of field test for HEMU running at a speed of 400km/h.

  • PDF

Structure stability study for existing subway tunnel segment of Seoul-Busan high-speed railroad (Daegu - Busan) construction (경부고속철도(대구-부산) 도심통과 노반신설 공사중 기존 지하철 터널구간의 구조적 안정성 검토)

  • Kong, Byung-Seung;Kim, Min-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1752-1759
    • /
    • 2007
  • In the new Seoul-Busan high speed railroad construction specially city center passage roadbed establishment is recommended the staibility for the existing subway tunnel segments of Busan subway line No. 1 and No.2. regarding the appearance condition, a quality condition and the durability of the objective facility site exact inspection, and it evaluates the numerical analysis which uses MIDAS GTS it leads and there is the objective of the place where the stability of the objective facility and this tunnel it investigates. To immediacy of the on-the-spot inspection result whole facility it is a condition where the reinforcement which is simple not to be hindrance is necessary, 2nd Line case it is a condition which transfer is good but the general defect and the damage which occur from the tunnel of NATM type were confirmed part. While roadbed establishment constructing that the continuous maintenance is necessary, it is judged. The result of 1st, 2nd Line maximum sinkage, unequal sinkage and the lining stress of numerical analysis are within permission and the damage degree is appearing with the fact that the degree it will can disregard it is slight. But it enforces necessary Pre-grouting in order to minimize an actual tunnel face conduct and when the tunnel is excavated it is judged with the fact that necessary to minimize the outflow possibility.

  • PDF

Obstacle of a train crew & Vehicle Operation For Improvement Program In Seoul metro (서울메트로 승무.차량 운전장애에 대한 개선방안)

  • Lee, Tai-Sik;Park, Min-Seo;Bae, Woo-Byeng;Kim, Dong-Seok;Kim, Jun-Taek
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1168-1173
    • /
    • 2007
  • The Seoul Subway is one of the most heavily used Subway System in the world. It provides reliable transportation services, conveys nearly 4 million Passengers across 117 subway stations with a length of 134.9 Km. Over the years the safety for the Subway has been a major concern, trains going off the track, equipment failure, careless operation, Signal failure are increasing day by day. In a Recent Public opinion 40% said the causes to above facts are Vehicle breakdown because of Operators, Old rail defect, Quality of material. 20% of the opinion said the obstacles were because of Operation, crew carelessness, negligence in signal operation. In case of any accident the crew members cannot resolve the issue on site (Aid insufficiency), because of lack of knowledge and carelessness. The main obstacles for Subway are vehicle breakdown, Electric equipment failure, Signal Equipment failure, and Crew carelessness. This paper aims to provide major problems which are needed to be solved as quickly as possible for citizen's safety for a comfortable subway system making a comfortable ride and providing better service gradually.

  • PDF

The Fracjection: An analytical system for projected fractures onto rock excavation surface from boreholes and outcrops (시추 및 야외조사 자료의 절취면 투영 분석 시스템 Fracjection)

  • Hwang, Sang-Gi;Lim, Yu-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1882-1889
    • /
    • 2007
  • Surveying rocks for engineering aims for prediction of geological feature of the construction site. Conventionally, survey information at outcrops and bore holes are projected to the construction sites, such as tunnel and slopes, and rock properties of the sites are predicted by interpretations of specialists. This system, the "Fracjection", aims to assist the specialist for visualization of the projected fractures from borehole and outcrop survey. The Fracjection accepts the BIPS and outcrop survey data to its database and allows plotting them in AutoCad map. The software also reads elevation data from contours of the topographic map and constructs DEM of the construction sites. With user's guide, it generates 3D excavation sites such as slopes and tunnels at the topographic map. The s/w projects borehole and outcrop surveyed fractures onto the modeled excavation surface and allows analysis of failure criteria, such as plane, wedge, and toppling failures by built-in stereonet function. Projected fractures can further be analyzed for structural homogeneities and rock mass quality. Moving window style correlation comparison of stereonet plots are used for formal analyses, and RQD type counts of the projected fractures are adopted for the latter analyses.

  • PDF