• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.034 seconds

Intermediate Storage Process required before Operation Site Installation of System (Focusing on the Rolling Stock of Railway System) (시스템의 운용 현장 설치 전 요구되는 중간 보관 프로세스 연구 (철도차량 중심으로))

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.141-147
    • /
    • 2020
  • Due to the nature of the long-term project of a Railway business, Many problems have been arisen in the process of delivering products or systems verified by suppliers to the customer's operation site. Unexpectedly, it is often necessary for the verified products to store intermediately at the supplier's site for a variety of reasons, such as delays in business and delays in civil engineering, at the time of sending them to the customer's operation site. In this study, the intermediate storage process for finding and solving problems related to intermediate storage was presented focusing on the Rolling Stock of Railway System by reference to ISO/IEC/IEEE 15288:2015. A suitable intermediate storage process based on the developed product or system's characteristics will allow the verified products or systems to be placed on the customer's operation site and to meet the customer's product or system requirements.

Dynamic Performance Enhancement of the Railway Plate Girder Bridge using the In-site Continuous Method (현장 연속화 기법을 통한 철도판형교의 동적성능향상)

  • Oh, Ji-Taek;Kim, Hyun-Min
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.774-782
    • /
    • 2011
  • In-site Continuous Method to improve the dynamic performance of railway plater girder bridge was developed. In this study, the In-site Continuous Method in the existing railway plate girder bridge was applied. Comparison of the results obtained from the field experiment were presented. The reductions in vertical acceleration were shown to approximately 24.8%, 45.4% and 27.5% in case of the freight train, passenger train and express tilting train, respectively. The reductions of lateral acceleration were shown to approx. 31%, 39% and 15% in the previous case. In the vertical displacement, the reductions were shown to approx. 20%, 13% and 12.6%, respectively. Through this method, we expect the problem of the restriction in speed up of train to be solve.

  • PDF

Research on Design of DDS-based Conventional Railway Signal Data Specification for Real-time Railway Safety Monitoring and Control (실시간 철도 안전관제를 위한 DDS 기반의 일반철도 신호 데이터 규격 설계 연구)

  • Park, Yunjung;Lim, Damsub;Min, Dugki;Kim, Sang Ahm
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.4
    • /
    • pp.739-746
    • /
    • 2016
  • The real-time railway safety monitoring and control system is for prevention of safety accidents, and this system adopts DDS (Data Distribution Service) standard based data transmission method to support integrated management of data from existing on-site safety detection devices. In this paper, we introduce the design of DDS-based data specification from on-site signal equipment on the conventional railway. For this, we (1) design UML data model of KRS SG 0062 standard which defines existing data specification, (2) define DDS Topics for DDS transmission and map KRS model to DDS Topic model, (3) suggest data transformation rules and (4) design network control QoS polices. In addition, we analysis actual on-site log data and validate our data specification design. DDS-based data transmission enables data compatibility among on-site devices and the real-time railway safety monitoring and control system, and allows efficient network management for a large amount of data transfer.

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway - (철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -)

  • Kim, Hwan-Yong;Shin, Min-Ho;Han, Sang-Cheon;Choi, Young-Woo;Kim, Chang-Ho
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Development and Application of Integrated Settlement Management System for Construction and Maintenance of Concrete Railway (콘크리트 궤도의 시공 및 유지관리를 위한 침하관리 통합 시스템의 구축 및 활용)

  • Woo, Sang-Inn;Chun, Sung-Ho;Chung, Choong-Ki;Lee, Il-Hwa;Kwon, Oh-Jung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1196-1202
    • /
    • 2007
  • In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.

  • PDF

A study on the moving picture transmission method between the accident sites and control center (사고현장과 사령실간 화상전송기술에 관한 연구)

  • 장석각;조봉관
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.484-489
    • /
    • 2002
  • Whenever the accidents occur in the railway areas, their prompt recovery is very important. The individual way has been used to resolve these accidents by direct visiting the site and reporting to others who cares for these cases. As a result, we are planning to operate the MTS (Moving picture Transmission System) for a timely information's transmission to the related peoples in the central control center by transforming the picture information on the accident-site to the digital information. The proposed system is not a transmission system using exclusive lines, but utilizing the existing railway computer network. We construct a network server device so that a dispatcher can easily connect with the server through the railway intranet. In some railway environments such as disturbed field situations and geographical condition(in tunnels and bridges, etc) building up the wired network is difficult. Solving this problem, we reviewed the wireless network. Finally we proposed the mixed wireless network that is able to cover the wired network. We then installed and tested the wired network and wireless network respectively in wayside of a railway field. Through the testing, we identified many detailed matters for some network construction approaches to the control room and many field device-connecting schemes. This research will contribute to minimize the number of staff dispatched to a disturbed field, decrease the accident recovery time and improve the quality of service to the passenger.

  • PDF

A Study on the Performance Evaluation of Noise Reduction for Railway Noise Barrier using Prediction Equation (예측식을 이용한 철도방음벽의 성능평가에 관한 연구)

  • Cho, Jun-Ho;Koh, Hyo-In
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.553-561
    • /
    • 2010
  • Railway noise barrier is generally used with welding of joint rail for railway noise reduction in our country. In this study, method for performance evaluation of railway noise barrier using insertion loss was suggested in case of without having noise measurement results before barrier installation. For this, railway noise measurements were performed in commercial high-speed railway site which has railway noise barrier. As a noise level before noise barrier installation, predicted noise level were used. From this method the performance evaluation for railway noise barrier were performed accurately and efficiently.

Application of Elastomeric Bearing for Railway Bridge (철도교량의 탄성받침 적용방안)

  • Kang, T.W.;Oa, S.W.;Kim, D.S.;Kang, Y.S
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1697-1702
    • /
    • 2010
  • It has been recognized for decades that the spherical bearing which is sliding on curved surface in the intrinsic behavior is optimized for the railway bridge requiring a large slope deflection. However, the spherical bearing is easily corrosived at the PSC girder bridge which is exposed to the outside so the normal function of bridge bearing is not fulfilled fully. It is common that the corrosion is happened at the operating plate of steel bridge bearing and generally it is necessary to replace the bridge bearing after 20~25 years. Accordingly, It costs multi billion dollars for maintenance each year and the necessity of improvement become a issue. Korea Rail Network Authority(KR) suggested to apply the Elastomeric bearing instead of Spherical bearing through the task of construction site of 2006. But the normal Elastomeric bearing is optimized for the Highway bridge so it needs the special consideration to satisfy each design condition required by railway bridge. As the result of examination of Elastomeric bearing at the railway bridge construction site, the stress is decreased by effective dispersion of earthquakes and the maintenance fee is also decreased.

  • PDF

Multi-dimensional Development Type and Plan for Railway Facility Site - Focus on the Gyeongbu Line Railway Multi-Dimensional Project in Busan (철도시설 부지 입체개발 유형 및 개발 방안 - 경부선 철도 입체화 사업을 대상으로 -)

  • Keum, Yun Jeon ;Kim, Jong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.525-533
    • /
    • 2023
  • Due to the topographical characteristics of Busan, which has many mountainous areas, there is a shortage of available land, and even the Gyeongbu Line railroad crosses the city center, hindering the disconnection of living areas and urban development. Accordingly, the need for multi-dimensional development has been raised to secure land, and recently, interest has been increasing in connecting cities divided by the undergroundization of the Gyeongbu Line railway and making efficient use of land. In this study, the development type was analyzed through the case of multi-dimensional development of land, and the development direction for each three-dimensional development type was set based on the results of the multi-dimensional development of four areas (Sasang Station, Gupo Station, Gaya Station, and Busanjin Station). In addition, reflecting the regional characteristics of the target area and the ongoing urban regeneration project, we will propose a design plan for horizontal and vertical space utilization of the railway site through multi-dimensional development through the efficient land use.

Study on compaction characteristics of mixed fill materials(rock and soil) in railway roadbed (철도노반 혼합(흙과 암)성토의 다짐특성에 관한 연구)

  • Kim, Dae-Sang;Park, Seong-Yong;Song, Jong-Woo;Kim, Soo-Il
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.505-510
    • /
    • 2007
  • Concrete track will be constructed in Gyungbu High Speed Railway II(GHSR II) stage construction site from Daegu to Busan. Concrete track is supported by substructure consisting of the original ground and embankment and does not allow the settlement of track because of its structural type. The embankment is composed of rock and soil mixture and settlement is feasible. So management of settlement of embankment is key point in successful construction of the concrete track. Compaction management of mixed fill materials is important in minimizing the settlement of embankment. In this study, in order to assess the compaction characteristics of mixed fill materials, large laboratory compaction tests were conducted. Mixed fill materials were obtained from two construction sites in GHSR II construction site. Modeled mixed fill materials having different rock type, fine content, maximum particle diameter, and moisture contents were prepared. From the test results, compaction characteristics of mixed fill materials were analysed.

  • PDF