Due to the nature of the long-term project of a Railway business, Many problems have been arisen in the process of delivering products or systems verified by suppliers to the customer's operation site. Unexpectedly, it is often necessary for the verified products to store intermediately at the supplier's site for a variety of reasons, such as delays in business and delays in civil engineering, at the time of sending them to the customer's operation site. In this study, the intermediate storage process for finding and solving problems related to intermediate storage was presented focusing on the Rolling Stock of Railway System by reference to ISO/IEC/IEEE 15288:2015. A suitable intermediate storage process based on the developed product or system's characteristics will allow the verified products or systems to be placed on the customer's operation site and to meet the customer's product or system requirements.
In-site Continuous Method to improve the dynamic performance of railway plater girder bridge was developed. In this study, the In-site Continuous Method in the existing railway plate girder bridge was applied. Comparison of the results obtained from the field experiment were presented. The reductions in vertical acceleration were shown to approximately 24.8%, 45.4% and 27.5% in case of the freight train, passenger train and express tilting train, respectively. The reductions of lateral acceleration were shown to approx. 31%, 39% and 15% in the previous case. In the vertical displacement, the reductions were shown to approx. 20%, 13% and 12.6%, respectively. Through this method, we expect the problem of the restriction in speed up of train to be solve.
철도 안전사고 예방을 목표로 하는 실시간 철도 안전관제 시스템에서는 DDS (Data Distribution Service) 표준 기술 기반의 데이터 전송 방안을 적용함으로 기존 현장의 안전검지장치로부터 발생한 데이터를 통합 및 관리하고 있다. 본 논문에서는 수많은 현장 데이터 중 일반철도 현장에서 발생한 신호설비 데이터 규격 설계를 소개하고 있다. 신호설비 데이터의 DDS 전송을 위하여 기존 표준 규격인 KRS SG 0062를 모델링하고, DDS 데이터 전송 단위인 Topic 설계 및 데이터 변환 방안을 제시하고, 데이터 성격 별로 네트워크 제어 QoS 정책 설계를 제시하고 있다. 또한 실제 현장 데이터를 분석하여 설계된 규격이 현장에 적용 가능한지를 확인해 보았다.
Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.
In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.
Whenever the accidents occur in the railway areas, their prompt recovery is very important. The individual way has been used to resolve these accidents by direct visiting the site and reporting to others who cares for these cases. As a result, we are planning to operate the MTS (Moving picture Transmission System) for a timely information's transmission to the related peoples in the central control center by transforming the picture information on the accident-site to the digital information. The proposed system is not a transmission system using exclusive lines, but utilizing the existing railway computer network. We construct a network server device so that a dispatcher can easily connect with the server through the railway intranet. In some railway environments such as disturbed field situations and geographical condition(in tunnels and bridges, etc) building up the wired network is difficult. Solving this problem, we reviewed the wireless network. Finally we proposed the mixed wireless network that is able to cover the wired network. We then installed and tested the wired network and wireless network respectively in wayside of a railway field. Through the testing, we identified many detailed matters for some network construction approaches to the control room and many field device-connecting schemes. This research will contribute to minimize the number of staff dispatched to a disturbed field, decrease the accident recovery time and improve the quality of service to the passenger.
Railway noise barrier is generally used with welding of joint rail for railway noise reduction in our country. In this study, method for performance evaluation of railway noise barrier using insertion loss was suggested in case of without having noise measurement results before barrier installation. For this, railway noise measurements were performed in commercial high-speed railway site which has railway noise barrier. As a noise level before noise barrier installation, predicted noise level were used. From this method the performance evaluation for railway noise barrier were performed accurately and efficiently.
It has been recognized for decades that the spherical bearing which is sliding on curved surface in the intrinsic behavior is optimized for the railway bridge requiring a large slope deflection. However, the spherical bearing is easily corrosived at the PSC girder bridge which is exposed to the outside so the normal function of bridge bearing is not fulfilled fully. It is common that the corrosion is happened at the operating plate of steel bridge bearing and generally it is necessary to replace the bridge bearing after 20~25 years. Accordingly, It costs multi billion dollars for maintenance each year and the necessity of improvement become a issue. Korea Rail Network Authority(KR) suggested to apply the Elastomeric bearing instead of Spherical bearing through the task of construction site of 2006. But the normal Elastomeric bearing is optimized for the Highway bridge so it needs the special consideration to satisfy each design condition required by railway bridge. As the result of examination of Elastomeric bearing at the railway bridge construction site, the stress is decreased by effective dispersion of earthquakes and the maintenance fee is also decreased.
산지가 많은 부산시의 지형적 특성상 가용토지가 부족한 상황에서 경부선 철도까지 도심을 가로지르고 있어 생활권의 단절과 도심발전을 저해하고 있다. 이에 토지 확보를 위하여 입체개발의 필요성이 제기되고 있으며, 최근에는 경부선 철도의 지하화로 양분화 된 도시를 연결하고 토지를 효율적으로 사용할 수 있도록 하는데 관심이 증가하고 있다. 본 연구에서는 토지의 입체개발의 사례를 통해 개발유형을 분석하고, 부산시내 경부선 철도의 지하화 사업 시 메인이 되는 4개 권역(사상역, 구포역, 가야역, 부산진역)의 입체개발로 발생하는 가용토지에 효과적인 활용을 위한 시민인식조사 결과를 바탕으로 입체개발 유형별 개발방향 설정하였다. 또한 대상지 지역이 가지고 있는 지역적 특성과 현재 진행되고 있는 도시재생사업을 반영하여 철도에 의해 양분된 지역생활권의 단절 해소 및 철도시설 부지의 효율적 토지이용을 통한 입체적인 개발을 통해 철도 부지의 수평적, 수직적 공간활용의 설계방안을 제시하고자 한다.
Concrete track will be constructed in Gyungbu High Speed Railway II(GHSR II) stage construction site from Daegu to Busan. Concrete track is supported by substructure consisting of the original ground and embankment and does not allow the settlement of track because of its structural type. The embankment is composed of rock and soil mixture and settlement is feasible. So management of settlement of embankment is key point in successful construction of the concrete track. Compaction management of mixed fill materials is important in minimizing the settlement of embankment. In this study, in order to assess the compaction characteristics of mixed fill materials, large laboratory compaction tests were conducted. Mixed fill materials were obtained from two construction sites in GHSR II construction site. Modeled mixed fill materials having different rock type, fine content, maximum particle diameter, and moisture contents were prepared. From the test results, compaction characteristics of mixed fill materials were analysed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.