• 제목/요약/키워드: railway site

검색결과 311건 처리시간 0.037초

시스템의 운용 현장 설치 전 요구되는 중간 보관 프로세스 연구 (철도차량 중심으로) (Intermediate Storage Process required before Operation Site Installation of System (Focusing on the Rolling Stock of Railway System))

  • 최요철
    • 시스템엔지니어링학술지
    • /
    • 제16권2호
    • /
    • pp.141-147
    • /
    • 2020
  • Due to the nature of the long-term project of a Railway business, Many problems have been arisen in the process of delivering products or systems verified by suppliers to the customer's operation site. Unexpectedly, it is often necessary for the verified products to store intermediately at the supplier's site for a variety of reasons, such as delays in business and delays in civil engineering, at the time of sending them to the customer's operation site. In this study, the intermediate storage process for finding and solving problems related to intermediate storage was presented focusing on the Rolling Stock of Railway System by reference to ISO/IEC/IEEE 15288:2015. A suitable intermediate storage process based on the developed product or system's characteristics will allow the verified products or systems to be placed on the customer's operation site and to meet the customer's product or system requirements.

현장 연속화 기법을 통한 철도판형교의 동적성능향상 (Dynamic Performance Enhancement of the Railway Plate Girder Bridge using the In-site Continuous Method)

  • 오지택;김현민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.774-782
    • /
    • 2011
  • In-site Continuous Method to improve the dynamic performance of railway plater girder bridge was developed. In this study, the In-site Continuous Method in the existing railway plate girder bridge was applied. Comparison of the results obtained from the field experiment were presented. The reductions in vertical acceleration were shown to approximately 24.8%, 45.4% and 27.5% in case of the freight train, passenger train and express tilting train, respectively. The reductions of lateral acceleration were shown to approx. 31%, 39% and 15% in the previous case. In the vertical displacement, the reductions were shown to approx. 20%, 13% and 12.6%, respectively. Through this method, we expect the problem of the restriction in speed up of train to be solve.

  • PDF

실시간 철도 안전관제를 위한 DDS 기반의 일반철도 신호 데이터 규격 설계 연구 (Research on Design of DDS-based Conventional Railway Signal Data Specification for Real-time Railway Safety Monitoring and Control)

  • 박윤정;임담섭;민덕기;김상암
    • 한국정보통신학회논문지
    • /
    • 제20권4호
    • /
    • pp.739-746
    • /
    • 2016
  • 철도 안전사고 예방을 목표로 하는 실시간 철도 안전관제 시스템에서는 DDS (Data Distribution Service) 표준 기술 기반의 데이터 전송 방안을 적용함으로 기존 현장의 안전검지장치로부터 발생한 데이터를 통합 및 관리하고 있다. 본 논문에서는 수많은 현장 데이터 중 일반철도 현장에서 발생한 신호설비 데이터 규격 설계를 소개하고 있다. 신호설비 데이터의 DDS 전송을 위하여 기존 표준 규격인 KRS SG 0062를 모델링하고, DDS 데이터 전송 단위인 Topic 설계 및 데이터 변환 방안을 제시하고, 데이터 성격 별로 네트워크 제어 QoS 정책 설계를 제시하고 있다. 또한 실제 현장 데이터를 분석하여 설계된 규격이 현장에 적용 가능한지를 확인해 보았다.

철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 - (Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -)

  • 김환용;신민호;한상천;최영우;김창호
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

콘크리트 궤도의 시공 및 유지관리를 위한 침하관리 통합 시스템의 구축 및 활용 (Development and Application of Integrated Settlement Management System for Construction and Maintenance of Concrete Railway)

  • 우상인;천성호;정충기;이일화;권오정
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1196-1202
    • /
    • 2007
  • In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.

  • PDF

사고현장과 사령실간 화상전송기술에 관한 연구 (A study on the moving picture transmission method between the accident sites and control center)

  • 장석각;조봉관
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.484-489
    • /
    • 2002
  • Whenever the accidents occur in the railway areas, their prompt recovery is very important. The individual way has been used to resolve these accidents by direct visiting the site and reporting to others who cares for these cases. As a result, we are planning to operate the MTS (Moving picture Transmission System) for a timely information's transmission to the related peoples in the central control center by transforming the picture information on the accident-site to the digital information. The proposed system is not a transmission system using exclusive lines, but utilizing the existing railway computer network. We construct a network server device so that a dispatcher can easily connect with the server through the railway intranet. In some railway environments such as disturbed field situations and geographical condition(in tunnels and bridges, etc) building up the wired network is difficult. Solving this problem, we reviewed the wireless network. Finally we proposed the mixed wireless network that is able to cover the wired network. We then installed and tested the wired network and wireless network respectively in wayside of a railway field. Through the testing, we identified many detailed matters for some network construction approaches to the control room and many field device-connecting schemes. This research will contribute to minimize the number of staff dispatched to a disturbed field, decrease the accident recovery time and improve the quality of service to the passenger.

  • PDF

예측식을 이용한 철도방음벽의 성능평가에 관한 연구 (A Study on the Performance Evaluation of Noise Reduction for Railway Noise Barrier using Prediction Equation)

  • 조준호;고효인
    • 환경영향평가
    • /
    • 제19권6호
    • /
    • pp.553-561
    • /
    • 2010
  • Railway noise barrier is generally used with welding of joint rail for railway noise reduction in our country. In this study, method for performance evaluation of railway noise barrier using insertion loss was suggested in case of without having noise measurement results before barrier installation. For this, railway noise measurements were performed in commercial high-speed railway site which has railway noise barrier. As a noise level before noise barrier installation, predicted noise level were used. From this method the performance evaluation for railway noise barrier were performed accurately and efficiently.

철도교량의 탄성받침 적용방안 (Application of Elastomeric Bearing for Railway Bridge)

  • 강태우;어성욱;김동식;강영식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1697-1702
    • /
    • 2010
  • It has been recognized for decades that the spherical bearing which is sliding on curved surface in the intrinsic behavior is optimized for the railway bridge requiring a large slope deflection. However, the spherical bearing is easily corrosived at the PSC girder bridge which is exposed to the outside so the normal function of bridge bearing is not fulfilled fully. It is common that the corrosion is happened at the operating plate of steel bridge bearing and generally it is necessary to replace the bridge bearing after 20~25 years. Accordingly, It costs multi billion dollars for maintenance each year and the necessity of improvement become a issue. Korea Rail Network Authority(KR) suggested to apply the Elastomeric bearing instead of Spherical bearing through the task of construction site of 2006. But the normal Elastomeric bearing is optimized for the Highway bridge so it needs the special consideration to satisfy each design condition required by railway bridge. As the result of examination of Elastomeric bearing at the railway bridge construction site, the stress is decreased by effective dispersion of earthquakes and the maintenance fee is also decreased.

  • PDF

철도시설 부지 입체개발 유형 및 개발 방안 - 경부선 철도 입체화 사업을 대상으로 - (Multi-dimensional Development Type and Plan for Railway Facility Site - Focus on the Gyeongbu Line Railway Multi-Dimensional Project in Busan)

  • 금윤전;김종구
    • 대한토목학회논문집
    • /
    • 제43권4호
    • /
    • pp.525-533
    • /
    • 2023
  • 산지가 많은 부산시의 지형적 특성상 가용토지가 부족한 상황에서 경부선 철도까지 도심을 가로지르고 있어 생활권의 단절과 도심발전을 저해하고 있다. 이에 토지 확보를 위하여 입체개발의 필요성이 제기되고 있으며, 최근에는 경부선 철도의 지하화로 양분화 된 도시를 연결하고 토지를 효율적으로 사용할 수 있도록 하는데 관심이 증가하고 있다. 본 연구에서는 토지의 입체개발의 사례를 통해 개발유형을 분석하고, 부산시내 경부선 철도의 지하화 사업 시 메인이 되는 4개 권역(사상역, 구포역, 가야역, 부산진역)의 입체개발로 발생하는 가용토지에 효과적인 활용을 위한 시민인식조사 결과를 바탕으로 입체개발 유형별 개발방향 설정하였다. 또한 대상지 지역이 가지고 있는 지역적 특성과 현재 진행되고 있는 도시재생사업을 반영하여 철도에 의해 양분된 지역생활권의 단절 해소 및 철도시설 부지의 효율적 토지이용을 통한 입체적인 개발을 통해 철도 부지의 수평적, 수직적 공간활용의 설계방안을 제시하고자 한다.

철도노반 혼합(흙과 암)성토의 다짐특성에 관한 연구 (Study on compaction characteristics of mixed fill materials(rock and soil) in railway roadbed)

  • 김대상;박성용;송종우;김수일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.505-510
    • /
    • 2007
  • Concrete track will be constructed in Gyungbu High Speed Railway II(GHSR II) stage construction site from Daegu to Busan. Concrete track is supported by substructure consisting of the original ground and embankment and does not allow the settlement of track because of its structural type. The embankment is composed of rock and soil mixture and settlement is feasible. So management of settlement of embankment is key point in successful construction of the concrete track. Compaction management of mixed fill materials is important in minimizing the settlement of embankment. In this study, in order to assess the compaction characteristics of mixed fill materials, large laboratory compaction tests were conducted. Mixed fill materials were obtained from two construction sites in GHSR II construction site. Modeled mixed fill materials having different rock type, fine content, maximum particle diameter, and moisture contents were prepared. From the test results, compaction characteristics of mixed fill materials were analysed.

  • PDF