Recently, as the road capacity reaches the limit and environmental problems becomes serious, there is gradually increased a need for railroad vehicles that are environment-friendly and have time regularity, reliability and safety. Accordingly, in addition to conventional railroad vehicles, lots of vehicles are being newly developed. We developed the hardware and software of the measurement system for on-line test and evaluation of korean hish speed train. The software controls the hardware of the measurement data and acts as interface between users and the system hardware. In this paper, we is studied for electric apparatus performance of railway vehicle using sensor. In order to this test is developed signal conversion system. Using this system, we obtained important result for pantograph voltage, battery voltage, axle speed, and running speed.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.63
no.3
/
pp.178-182
/
2014
This paper investigates the lighting environment of railway system which are mainly used in KTX, Saemaul and Mugunghwa. When lighting used in KTX such as fluorescent lamp and incandescence is being replaced with LED lamp, illumination load of each railroad vehicle has been compared. The comparison result shows that the reduction of power consumption is 43.34% before and after the change. Also it has been performed the economic evaluation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.12
/
pp.82-87
/
2011
In this paper, a sensorless speed control system is designed for the next generation high speed railway at zero and low speed region. The applied vector control scheme is a maximum torque per ampere(MTPA) method to utilize reluctance torque of IPMSM. The designed sensorless control scheme is a rotating high frequency voltage signal injection method. To verify the designed system, a simulator for the vector controller and sensorless controller is implemented using Matlab/simulink.
Kim, Jeong-Bae;Kim, Min-Su;Song, Won-Pyo;Kim, Deok-Su;Jeon, Chan-Seok;Gil, Gyeong-Seok
The Transactions of the Korean Institute of Electrical Engineers C
/
v.51
no.1
/
pp.22-30
/
2002
ln this paper, it was reported the developed results of the monitoring unit for 72.5kY GIS which it is one part of the monitoring system for the substation that Korea Railway Company is promoting. In order to monitor the operational status of GIS, four parameters were chosen: the number of times of the circuit breaker switching, tightness of the gas-sealed units (circuit breaker / disconnecting switch / earthing switch), the number of times of the lightning arrestor operating and the leakage current of the lighting arrester. We constructed the monitoring system that can be judged the operating condition of the GIS from the signal of the suitable sensor for the purpose. Therefore, it is possible to on line monitoring for the condition of the GlS without efforts of the Periodic inspection.
Launched in 1999 and funded by the Korean government, the R&D project of developing the. light train system technology is finally wrapped up to produce its prototype train prototype and all the research activities on signal, communication, power supply third rail Type and infra-structure have been completed. In an attempt to verify the usability of the system through an actual testing and as a preliminary step to the application of the system to overall light train construction projects to be implemented in different cities in Korea, testing lines are under construction now. Here we'd like to introduce people to the general overview of the test line construction and interface found in the process of project.
Kim Sung Won;Song Oak Young;Bae Yoon;Hwang Sung Man
Proceedings of the KSR Conference
/
2004.06a
/
pp.153-158
/
2004
The security system using optical fiber is a system, circulating infrared rays laser pulse on the optical fiber which is attached on the security fence to prevent invasion, which can show invasion position with visible and audible signal on the situation monitor if an invader cut or pull the security fence with minuteness of 10m. The optical fiber can be also applied for the bed structure stability monitoring system of high speed train as well as security system. To apply this system for high speed railroad bed structures, this system will give an alarm if it detect excessive tension, shrinkage, deflection which is beyond the limit of structure, that will prevent serious railroad accident. In this paper, we like to propose that applying this system for security and structure stability can improve confidence and stability on operation of railways
Son Young-Jin;Ahn Cheong-Mo;Jeong Dong-Yoon;Park Byoung-No
Proceedings of the KSR Conference
/
2004.06a
/
pp.1504-1506
/
2004
The platform screen door(PSD) hasn't been installed yet within the manual operation system, that is, ATS & ATC Signal system. In other countries, it is mostly installed and operated within automatic operation system, that is, ATO. Especially, as a part of the environment friendly system installation, the installation of PSD shall be considered aggressively to improve the air quality in the underground area and to maintain the air-conditioning. Besides the number of suicides in the subway station gets increased these days causing safety hazard, so the installation of PSD is positively reviewed. To install PSD in the manual operation system, it is important to stop the train at the correct position. So we would like to suggest the technical system thereby.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.6
/
pp.800-806
/
1999
This paper proposes IIKBAG(Intelligent Interlocking Knowledge Base Generator) which can build automatically the interlocking knowledge base utilized as the real-time interlocking strategy of the electronic interlocking system in order to enhance it's reliability and expansion. The IIKBAG consists of the inference engine and the knowledge base. The former has an auto-learning function which searches all the train routes for the given station model based on heuristic search technique while dynamically searching the model, and then generates automatically the interlocking patterns obtained from the interlocking relations of signal facilities on the routes. The latter is designed as the structure which the real-time expert system embedded on IS(Interlocking System) can use directly in order to enhances the reliability and accuracy. The IIKBAG is implemented in C computer language for the purpose of the build and interface of the station structure database. And, a typical station model is simulated to prove the validity of the proposed IIKBAG.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.1
/
pp.208-213
/
2016
In order to detect the exact position of high-speed train, it is necessary to obtain location information from the transponder tag installed along the track. When the transponder tag receives the energizing signal from the train, it sends a telegram to the reader, which includes location information. In high-speed railway environment, this telegram can be corrupted by electromagnetic interference caused by onboard electric train power equipments or wayside devices. In order to assess the performance of transponder system under this harsh environment, we carried out field test using HEMU-430X. Field test results are briefly introduced and discussed for the evaluation of the transponder system under development.
Proceedings of the Korean Society of Precision Engineering Conference
/
2003.06a
/
pp.507-512
/
2003
The railroad is a means of large transportation which has many latents such as a safety and a regularity. That is a results from various confidential performance tests and evaluations of the system. The railroad system consist of various subsystems - vehicle, power supply, signal, communications, track structures, operations, etc. Among them, as an item of safety evaluation there is a measurement of wheel/rail force, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more important in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, it is introduced to preprocess the wheelset for measuring wheel/rail force of high speed rail, such as to treat a measuring wheelset, its finite element analysis, adhesion of strain gauges and static toad test, running test result of main line.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.