• Title/Summary/Keyword: railway signal

Search Result 441, Processing Time 0.029 seconds

A Study on Prevention of Pass-through Accident by Utilization of Wireless Communication (무선통신을 활용한 열차 통과사고 예방에 관한 연구)

  • Jang, DongWan;Jeon, Teahyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.12
    • /
    • pp.90-94
    • /
    • 2014
  • Recently, various types of trains are being operated in the same railroad whose designated stop stations are not the same. In other words, each train does not stop at every station. This could cause the pass-through accidents in which a train passes a station where it is supposed to stop. Although the number of train accidents is on the decrease, this type of error is still an important problem to be resolved. It is true that the burdens of train drivers are growing because the number of high speed trains and non-stop stations is increasing in the current railway system. However, another major reason for this accident is that there is no prevention system for these errors in the current train control system although it is being constantly improved. The purpose of this study is to reinforce the train stop system with wireless communication equipment in order to decrease this type of accident and to maximize the safety of railway transportation.

A Study on the Wireless Control System for the Shunting Route Indicator Applied with LTE-R technology (LTE-R 기술을 적용한 입환진로표시기 무선제어시스템 연구)

  • Suh, Ki-Bum;Im, Chul-Hoo;Lee, Kwang-Hee;Oa, Seong-Wook;Joeng, Wang-Kuk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.229-236
    • /
    • 2017
  • The railway has recently been expanded with the phase of the future transportation. Accordingly, using the new technologies such as smart devices and LTE-R, the needs for reducing operational costs and improving passenger services have emerged. To realize these needs, the government is pushing to build the dedicated wireless network for the railway systems. In this paper, the shunting route indicator was selected for this study because it has the best effect for the wireless system removed lots of wired cables. And the wireless shunting route indicator applied with LTE-R technology was developed to replace the current wired control system. The functional goal(the wireless control function applied LTE-R), the performance goal(less than 300ms for transferring the control information), and the reliability goal(over the 100,000 hours for MTBF) were set, and these goals were achieved and demonstrated through the test and validation.

Review on the technical trend of railway signalling technology (신호보안기술의 발전동향에 관한 고찰)

  • Kim, Jong-Ki;Ryu, Sang-Hwan;Lee, Jae-Ho;Cho, Bong-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1205-1207
    • /
    • 2002
  • As going through technical transition of signal control logic to mechanic, electric, electronic etc., railway signalling system utilizing computer control technology has recently been developed and used since railroad service had been firstly started in 1825 by beginning that horseman kept red color sign and notified something wrong existence and nonexistence of front route to train driver in the Britain. In this paper, the domestic technical change process of signalling technology to be a basic of train control technology is discussed and then reviewed about technical trend of advanced nation's development.

  • PDF

Test results of small scale changeover system using in neutral section for AC feeding system (축소형 교류급전시스템 절연구간 자동절체장치 성능시험)

  • Jang, Dong-Uk;Han, Moon-Seob
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.948-953
    • /
    • 2011
  • In AC railway feeding system, three phase received from the network is changed to two phase power sources with different phases. The main circuit breaker installed train is automatically open by track signal when the train passes the neutral section. In order to continuously supply power source to train, the changeover system was used in Japan. Therefore, the train is able to operate under powering condition when it was passing through the neutral section. We investigated the control method to reduce the inrush current flowing main transformer in train. To examine the inrush current and operate the static semiconductor switch such as thyristor, we manufactured the small scale the changeover system and carried out performance tests.

  • PDF

A Study on the Safety System Modeling to Prevent Train Accident by Turn-out Failure (분기기 고장 시 열차사고방지를 위한 안전시스템 모델링)

  • Yoo, Kwang-Kiun;Rho, Sung-Chan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.724-730
    • /
    • 2011
  • A turnout serves to switch train from one line to another. The turnout consists of a Point which is switchs the rail to induce direction, and a Crossing which is cross over two line on the plane surface, and a Lead where is middle section in Point to Crossing. Point machine, consists of a turnout, is important facilities in railway signal, that is safety issue relates in derailment of the train. Recently, train delay and accident frequently occurred because of the turnout include in a point machine trouble of electrical and mechanical. So in order to prevent train accident the research is advanced, install of normal and reverse indication lamp in a point machine, development of adherence detector for sensing the status of adhesion between the stock rails and tongue rails etc. In this paper investigates the problem which is connected with a turnout trouble, include in a point machine, occurrence at the time of train accident, and then proposed to the safety system model in order to prevent the train accident in turnout.

  • PDF

Design of CBTC On-board System Architecture (CBTC 차상장치 시스템 구성 설계)

  • Yoo, Sung-Ho;Lee, Tae-Gyu;Lee, Sung-Hoon;Park, Gie-Soo;Ryou, Myoung-Seon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2705-2710
    • /
    • 2011
  • With the rapid development of information and communication technology, CBTC system based on the wireless communication is widely applied in the railway signal system recently. CBTC system has advantages of lower installation space and maintenance fee than existing systems and the increase of transportation capacity and improvement of operating efficiency etc. due to the short headway. Based on the continuous wireless data communication between onboard and wayside equipment, CBTC system not only locates the train and transmits the information required for the train control, but also implements the moving block function by calculating the brake curves continuously according to distance from the preceding train. CBTC system can use either inductive loop (IL-CBTC) or radio frequency transmissions (RF-CBTC). In this paper, we propose RF-CBTC system architecture based on the functional modules, in which the CAN bus network is applied for the interfaces between the modules.

  • PDF

Design of Dang-San Steel Railway Bridge (당산철교의 설계)

  • 유동호;김선일
    • Computational Structural Engineering
    • /
    • v.12 no.4
    • /
    • pp.69-69
    • /
    • 1999
  • Design of Dangsan Steel Railway Bridge(a part of Seoul Subway Line NO. 2), which is supposed to be replaced after its 15years survice, was done, and the reconstruction has begun in Dec. 1997. The design include new superstruc-ture and bridge piers, retrofitting of the foun-dation, rail system, electric and signal, etc. In this paper, design of the structure is mainly summarized. The main span superstructure, across Han river, is composite section which is com-posed of steel box and reinforced concrete deck slab with 9 span continuous. The superstructure for the approaches is bottom througth type 2-cell steel box girder with steel floor system and concrete deck slab with 3 or 4 span continuous. The bridge piers was planned to be reconstructed based upon the result from the various investi-gations, while the foundation(cassion and pile foundation) was planned to be retrofitted. For superstructure erection, the method of combination of barge bent and heavy lifting and the launching truss method was investigated for the main span and approach spans, respectively.

  • PDF

Development of Obstacle Detection System on a Railroad Crossing (철도건널목 지장물 영상검지장치 개발)

  • Cho, Bong-Kwan;Ryu, Sang-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1197_1198
    • /
    • 2009
  • The development of Technology study for preventing of accident and reducing the risk through the intelligence of level crossing is provide the detection of stopped car at railway crossing with the most advanced intelligence technology such as sensor, computer, communication and date processing and transmit to the operational staff on broad for reaction or make the train stopped automatically through the connection with train. Also this study include that showing the situation of crossing railway when the train is approached and prevent the accident and reduce the risk through the connection of road transit signal system. On this study is performed the test through the date from spot level crossing and the development of video detection algorism for stopped road transit vehicle at level crossing with intelligent system.

  • PDF

Improvement of Overspeed Protection for Automatic Train Stop System (열차자동정지시스템(ATS)의 과속방지장치 개발)

  • Jeong, Rag-Gyo;Kim, Baek-Hyun;Kang, Seok-Won;Seo, Moon-Seog
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.61-67
    • /
    • 2018
  • Automatic Train Stop (ATS) is a device that automatically stops or decelerates a train when the train exceeds the permitted speed limits or violates the signal regulations. The railway signaling system has been evolved to an automatic train control system (ATC), and is being developed into Distance-to-Go and Communication Based on Train Control (CBTC). In spite of that, the ATS system is currently being operated in Seoul Metro (line 1 and 2) and most of railway lines in Korea as well as overseas. In this study, we presents the technical methodology to prevent human errors in order to secure the safety in operation of the ATS system.

Development of TTX(Tilting Train Express)for speed-up the existing main line (한국형 기존선 고속화 틸팅열차 연구개발사업)

  • Song Dal-ho;Choe Kangyoun;Han Seong-ho
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2004.10a
    • /
    • pp.3-5
    • /
    • 2004
  • In order to speed up basic concept is to enhance high speed, curve limit speed, cross limit speed, acceleration/deceleration speed. It is important to optimal interface fundamental technology of vehicle, rail, electrical power, and signal system. Tilting train has advantage minimizing investment cost of infra railway system for increasing train limit speed in curve. the developed tilting train should be operated to commercial service speed 180Km/h of 200Km/h at KNR upgrade railroad. This paper proposed the basic model of system engineering for developing of TTX, tilting EMU (maximum operation speed : 180km/h) with speed-up of conventional railway system.

  • PDF