Kim, Min-Seok;Yoon, In-Mo;Ko, Jun-Seog;Lee, Jong-Woo
Journal of the Korean Society for Railway
/
v.11
no.6
/
pp.536-542
/
2008
In concrete slab track, the signal current using wayside transmitter of ATP (Automatic Train Protection) system is influenced by reinforcing bars. The magnetic coupling between reinforcing bars and wayside transmitter of ATP system as a filter makes an input current distorted. So, it makes an alternating current signal with a desirable size not transmit to on-board system of a train. Way to decrease the distortion of an input current signal frequency is to avoid maximum induction current frequency. And the induction phenomenon between reinforcing bars insulated and wayside transmitter of ATP system does not occur. In this paper, we represent the model about wayside transmitter of ATP system and reinforcing bars on the concrete slab tracks, and calculated the parameters demanded for the model. Also, we demonstrated it through the Maxwell program. Furthermore, we calculated impedance on wayside transmitter used in KVB system and ERTMS/ETCS system which are a kind of ATP system, frequency response of induction current, using Matlab, and demonstrated the validity of it, using PSpice program.
Journal of the Korea Institute of Information and Communication Engineering
/
v.20
no.7
/
pp.1335-1341
/
2016
For the safety of train operation, monitoring & supervisory systems for train, signal, power, communication and facilities is operating independently in another place, so, its sensors are interdependently connected from each other to transfer gathering datas of sensing to control center. A Goal of Real-time railway safety supervision system is to improve the safety oversight efficiency and to prevent accidents by means of hazard prediction based on big data by integrating all of safety sensing data in wayside of railway, and the System is requested acquisition of all of sensing data of safety. So, we need special method of protocol converting for the purpose of integrating all of detecting data concerning safety without any changing application. In this paper we investigate the existing converting method in communication field, and propose a new progress to converting protocol adding function of transfer using XML file, and implemented this algorithm, and tested with example packets, finally.
Park, Jong-Kil;Jung, Woo-Sik;Lee, Jae-Su;Kim, Eun-Byul
Journal of the Korean Society for Railway
/
v.14
no.1
/
pp.73-79
/
2011
This paper aims to find out the statistical characteristics of railroad weather-related accidents and incidents of each railroad line and then reduce the railroad accidents and prepare for the climate change. For this, we used data of KROIS and Korea railroad accidents report during 1996-2008. The results are as follows; Gyeongbu line is the most vulnerable line to railroad weather-related accidents, Yeongdong and Taebaek line are also the vulnerable line. The main railroad weather-related accidents and incidents is a railway obstruction and the next is a signal failure, a power supply failure. The second cause of a railway obstruction was some different for each line, but the main cause was a collapsed roadbed. We knew that the cold front accompanied with a heavy rainfall for a short time is the main weather pattern which cause the railroad accidents.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2018.10a
/
pp.457-460
/
2018
The mobile communication based train control is the train control system by utilizing wireless communication rather than conventional wired communication. Traditional train control operates train occupation, safety integrity and moving authority using fixed block wired railway signal system. Since introduction of mobile communication in railway area, railway operators can provide improved passager services. Futhermore, it can replace inefficient train onboard equipments and railway ground facilities for economic benefits. In this paper we introduce mobile communication based railway system currently in operation around the world. Moreover, we provide the minimum requirements of the radio communication performance. Proposed minimum requirements of the radio communication improve more secure and efficient mobile communication based train control system.
Kim, Min-Seok;Lee, Sang-Hyeok;Kwon, Jae-Wook;Lee, Jong-Woo
Proceedings of the KSR Conference
/
2008.11b
/
pp.1169-1177
/
2008
The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.
Since the opening of the Seoul Metro in 1974, the electric railway passengers have been increased rapidly and as the advanced equipments(OC,PSD) were introduced, additional power facilities were built in a limited area for the comfortable transportation environment. Present grounding system were built according to old Electric equipment standards and all the electric signal, communication and electronic equipments were built only for the purposes of protecting building structure, people and electronic equipments. Grounding system which was additionally built in the limited area caused problems with the building structure and it caused secondary damages when earth fault happens. One of the problems is grounding system of the building structure; grounding system does not work properly since grounding equipments are not separated from each other. So, existing grounding system needs to be improved and unified grounding system in the building should be established. The purposed of this study is to analyze all the grounding systems that had been built in different year and to establish unified grounding system of Seoul Metro.
Kim, Min-Seok;Ko, Jun-Seog;Lee, Sang-Hyeok;Kim, Min-Kyu;Lee, Jong-Woo
Proceedings of the KSR Conference
/
2010.06a
/
pp.1841-1848
/
2010
Electric railway system consist of rolling stock, track, signal and streetcar line system. ATP(Automatic Train Protection) system in railway signaling system is the important one grasping the position and velocity of a train. The wayside transmitter of ATP system is installed between rails. Recently, the research about increasing train speed has been developed in total departments of the railroad systems. The study on the information transmission between on-board transmitter and wayside transmitter is required for increasing the train speed in the ATP system. When the train speed is increased as to same transmissi on distance, the problem on information transmission occurs because the transmission time is decreased. In case that the transmission distance is extended, the transmission time is decreased with respect to the train speed. Therefore, we have to define the standard magnetic intensity as to the train speed in order to transmit correctly telegram. In this paper, the transmission distance for the telegram is suggested on the basis of the train speed. Also, the standard magnetic intensity from the wayside transmitter to on-board transmitter is proposed by using transmission distance regarding the train speed in the ERTMS/ETCS system by using Matlab program.
To facilitate the base station planning in high speed railway communication systems, it is necessary to consider the functional relationships between the base station transmit power and space parameters such as train velocity and cell radius. Since these functions are able to present some inherent system properties determined by its spatial topology, they will be referred to as the power-space functions in this paper. In light of the fact that the line-of-sight path persists the most power of the received signal of each passing train, this paper considers the average transmission rate and bounds on power-space functions based on the additive white Gaussian noise channel (AWGN) model. As shown by Monte Carlo simulations, using AWGN channel instead of Rician channel introduces very small approximation errors, but a tractable mathematical framework and insightful results. Particularly, lower bounds and upper bounds on the average transmission rate, as well as transmit power as functions of train velocity and cell radius are presented in this paper. It is also proved that to maintain a fixed amount of service or a fixed average transmission rate, the transmit power of a base station needs to be increased exponentially, if the train velocity or cell radius is increased, respectively.
An interlocking equipment of railway signalling systems is manufactured with electrical devices and electrical interlocking equipment has been substituted for existing interlock equipment(relay sequential logic type). But interlock conditions are still generated from rail diagram and used to make Interlock Table manually. In order to make EIS(Electrical Interlock System) operate, we should write interlock data which is made from interlock table. But, as the station is larger and more complicated, handwork may becomes a very tediou work and makes more mistakes. Therefore the development of CAD system for Interlocking System is very significant, if CAD can reduce the mistakes from handwork and help the configuring the interlocking system. In this paper, we first arrange some rules which can be used to extract route information automatically from rail diagram and interlocking rules. And then we propose "Search-And-Rollback" algorithm to extract route information and individual interlocking rules. The proposed algorithm is implemented and tested through the signal design process of the Hyundai-Steel private railway to carry melted pig iron from the blast furnace to the steel-making workshop. some cases. It shows that CAD for Interlocking system is very helpful in time saving aspect and system reliability.
Park, Kyung-Rock;Jeon, Bub-Gyu;Kim, Nam-Sik;Kim, Sung-Il
Proceedings of the KSR Conference
/
2008.06a
/
pp.80-85
/
2008
In general, deflection limit criteria of bridge design specifications have been considered based on static serviceability and structural stability. Dynamic serviceability induced from bridge vibration actually has not been included in the criteria. Thus, it is necessary for comfort limit to be considered in order to check dynamic serviceability on bridge vibration. In this study, the comfort limit of bridge structures based on the RMQ and VDV considering the signal fluctuation effectively and the time duration exposed has been constructed. The comfort limit developed in time domain was verified by using vibration signals directly measured from the existing bridges. Comparing the developed comfort limit with the conventional ones defined in frequency domain, it is shown that the comfort limit developed in time domain would be more feasible for evaluating quantitatively the serviceability due to bridge vibration. Using the Bridge-train interaction analysis program, dynamic response of the bridge by the stiffness change were obtained for several railway bridges. And, a stiffness limit satisfying the bridge vibration serviceability was estimated by compared with comport limit. From the results, a new deflection limit on bridge structures satisfying the vibration serviceability could be proposed by comparing with the conventional deflection limit criteria.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.