According to Railway Safety Act, Korea Transportation Safety Authority (KOTSA) has been entrusted with 'Integrated Railway Safety Audit (IRSA) and has implemented the safety audit to the Railway operation agencies such as Korea Railway (KORAIL) and the Railway facility management organization such as the Korea Rail Network Authority (KR Network). The target of IRSA is to establish the effective rail safety management system and to raise the safety level of the Railway operation and facility agencies by checking synthetically their performance of safety duties with sincerity according to the Railway Safety Act. Even though newly introduced IRSA is conducted smoothly, it is necessary to study the methodology and criteria of the state's safety audit system. The purpose of this paper is to improve the efficiency of IRSA by the comparative research between IRSA and other similar safety audit system and to establish the consecutive improvement concept of IRSA. Second purpose is to confirm the effectiveness of IRSA by the analysis of the relationship between audit results and the safety level of the rail operation agencies.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.1
/
pp.129-133
/
2016
This paper insists that the accessibility and transfer facility has also to be included in railway investment because railway mode can not be, what is called, a door to door service. At present those facility are not included in the railway investment with them in negligence. Since those facility is not treated with railway system there is no room to get a budget from the central government. This paper suggests that all the measurements have to be implemented, based on the LOS (Level of Service) of accessibility and transfer at railway stations. The LOS has to be as low as reasonably practical (ALARP) which can be derived from the consensus between government and citizens. Also, a couple of procurement methods are suggested for accessibility and transfer facility separately. Finally, improvement of regulations are also suggested.
Large scaled railway freight transportation facilities in harbors are located in Busan port and Gwangyang port. The port rail depot plays an important role as the departure and destination function of railway logistics. However, presently, it is not relatively vitalized because it is not reflect the railway freight transportation's characteristics such as scale of railway tracks or yards area. In addition, even if port rail depot is vitalized, processing capacity is already saturated. Therefore, it is difficult to increase rail transport quantity. To activate railway container transportation business, it is very necessary to recalculate the facility size of port rail depots. Focused on the Busan new port rail depot, this paper analyzes the problems of port rail depot facility that has currently opened and finds some alternatives to resolve them.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.1
/
pp.317-327
/
2014
This study focuses on developing railway facility charging scheme and more understanding of its corresponding regulations, which is to be utilized as a principal guideline toward a railway competitive market in future. European countries where railway competition is already in place have referred as case studies. The study first defined what the railway facility charges are based upon a spatial concept, railway networks with links and nodes. There are two types of charging: first is on railway tracks which are identical to links, and another at stations which are identical to nodes, such that the railway facility charges become a summation of track charges and station charges covering all the railway networks. Next, we have identified what the objectives of imposing track and station charges are, including factors being able to reflect each objective. 6 objectives are proposed as for the track charges, and 3 objectives as for the station charges. The factors found are accordingly belonged to the objectives. In the end, relevant regulations are compared with the European regime to diagnose what further requirements or/and principals have to be guided into them. In summary, both charging scheme and the direction of regulation updates can be utilized in setting an appropriate charging scheme and corresponding regulations to ensure fair competitions.
Rail network authority have to do the safety ensuring activities including the maintenance of railway facility, integrated performance verification between the facilities and related rolling stock and safety inspections, etc. When constructing the new lines or revising the conventional lines, full system commissioning should be done before the revenue service with railway operator. To develop the optimal full system commissioning model, the status of domestic and foreign railway facility and railway accidents are analysed and the problems of the safety management are derived. As one of countermeasures for the problems, the procedures and criteria for the full system commissioning are developed.
Byeoung-Soo YUM;Tae-Yoon KIM;Sun-Haeng CHOI;Won-Mo GAL
Journal of Wellbeing Management and Applied Psychology
/
v.7
no.1
/
pp.27-33
/
2024
Purpose: This study investigates human error accidents in the Korean railway sector, emphasizing the need for systematic management to prevent such incidents, which can have fatal consequences, especially in driving-related jobs. Research design, data and methodology: This paper analyzed data from the Aviation and Railway Accident Investigation Board and the Korea Transportation Safety Authority, examining 240 human error accidents that occurred over the last five years (2018-2022). The analysis focused on accidents in the driving, facility, electric, and control fields. Results: The findings indicate that the majority of human error accidents stem from negligence in confirmation checks, issues with work methods, and oversight in facility maintenance. In the driving field, errors such as signal check neglect and braking failures are prevalent, while in the facility and electric fields, the main issues are maintenance delays and neglect of safety measures. Conclusions: The paper concludes that human error accidents are complex and multifaceted, often resulting from a high workload on engineers and systemic issues within the railway system. Future research should delve into the causal relationships of these accidents and develop targeted prevention strategies through improved work processes, education, and training.
The railway crossing is very dangerous because the track intersects with the road there. Thus, The laws were designed for safety of the railway crossing and they are classified as to the acts for the road and the railroad. For safety of the railway crossing, there are 'Road/Railroad Crossing Improvement Promotion Act', 'Enforcement Decree of Road/Railroad Crossing Improvement Promotion Act', 'Rules on Construction of Railroad', 'Rules on Safety Standards of Railroad Installations', and 'Enforcement Ordinance of Cable way/Railway Track Act' in the acts for the railroad and there are 'Road Traffic Act', 'Enforcement Ordinance of The Road Traffic Act', 'Ruled on Structure and Facility Standards of The Road', 'Rules on Structure And Facility Standards Of The Rural Road' and 'Rules on Structure and Facility Standards of The Installations for Bicycle' in the acts for the road. Both the acts for the road and the railroad have standards for the structure of the railway crossing. However, they have different standards. Besides, they don't have standards for new facilities which were recently installed for safety of the railway crossing. Therefore, we suggest new standards for safety of the railway crossing.
Disaster management system should be built for minimizing damage factor that affects to construction facility from natural disaster. It could be classified by three categories such as disaster prevention, damage survey and recovery phases. For an integrated disaster management system, a disaster information classification system(DICS) is necessary for the reasonable disaster information management. This study suggests an integrated DICS that includes disaster type classification, facility type classification and information type classification for disaster management service. The applicability of suggested DICS is verified by railway facility and the research result could be used as a basic information system for national disaster management system.
Much research has been actively done so far on the inconvenience of each urban railway station; however, Research is on importance factor analysis on transfer facilities by considering characteristics of railway stations is relatively insufficient. In this study, a novel method of finding causality between transfer facilities(movement, information, comfortability, etc,) in terms of demands and platform types is provided by using SEM(Structural Equation Model). The results of SEM analysis show that a large demand transfer station if combined with island and segregate platform types, has a higher importance factor with respect to information facility, movement facility position and comfortability. In addition, a medium demand transfer station if combined with separate and separate platform types has a higher importance factor with respect to information facility, movement facility and comfortability.
As the Reliability Centered Maintenance(RCM) is being studied, maintenance tasks can be performed effectively through the Risk Priority Number(RPN) evaluation about the components in the system. The RPN is usually calculated through arithmetical operations of three values, Severity, Occurrence, and Detection for each facility. This RPN provides information that includes risk level of the facility and the priority order of maintenance tasks for facility. However, if there is no sufficient historical failure data, it is difficult to calculate the RPN. In this case, historical failure data from other sources can be used and apply this data to korean railway system. In this paper, it is proposed that a new methodology to model the failure rate as a fuzzy membership function. This method is based on failure data from other sources by means of the fuzzy theory and the expert opinion system. And considering assessment tendency of each expert, distortions that happened when the failure rate of facilities is estimated were minimized. This results determine Occurrence values of facilities. Taking advantage of this result., the RPN can be calculated with Severity and Detection of facilities by using the fuzzy operation. The proposed method is applied the rail-way power substation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.