• Title/Summary/Keyword: railway distribution system

Search Result 174, Processing Time 0.031 seconds

Development of Daily Operation Program of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations (고속철도 변전소 피크부하 저감용 ESS 일간 운전 프로그램 개발)

  • Byeon, Gilsung;Kim, Jong-Yul;Kim, Seul-Ki;Cho, Kyeong-Hee;Lee, Byung-Gon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.3
    • /
    • pp.404-410
    • /
    • 2016
  • This paper proposed a program of an energy storage system(ESS) for peak shaving of high-speed railway substations The peak shaving saves cost of equipment and demand cost of the substation. To reduce the peak load, it is very important to know when the peak load appears. The past data based load profile forecasting method is easy and applicable to customers which have relatively fixed load profiles. And an optimal scheduling method of the ESS is helpful in reducing the electricity tariff and shaving the peak load efficiently. Based on these techniques, MS. NET based peak shaving program is developed. In case study, a specific daily load profile of the local substation was applied and simulated to verify performance of the proposed program.

Sizing and Economic Analysis of Battery Energy Storage System for Peak Shaving of High-Speed Railway Substations (고속철도 변전소 피크부하 저감용 ESS 용량 산정 및 경제성 분석)

  • Kim, Seul-Ki;Kim, Jong-Yul;Cho, Kyeong-Hee;Byun, Gil-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.1
    • /
    • pp.27-34
    • /
    • 2014
  • The paper proposed a sizing method of an energy storage system(ESS) for peak shaving of high-speed railway substations based on load profile patterns of substations. A lithium based battery ESS was selected since it can produce high-power at high speed that peak shaving requires, and also takes up a relatively smaller space for installation. Adequate size of the ESS, minimum capacity which can technically meet a peak shaving target, was determined by collectively considering load patterns of a target substation, characteristics of the ESS to be installed, and optimal scheduling of the ESS. In case study, a local substation was considered to demonstrate the proposed sizing method. Also economic analysis with the determined size of ESS was performed to calculate electricity cost savings of the peak shaving ESS, and to offer pay-back period and return on investment.

A Study on a Diagnosis System for HSR Turnout Systems (II) (고속철도 분기기 시스템 진단 시스템에 관한 연구(II))

  • Kim, Youngseok;Yoon, Yeonjoo;Back, Inchul;Ryu, Youngtae;Han, Hyunsu;Hwang, Ankyu;Kang, Hyungseok;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.223-233
    • /
    • 2017
  • The railway turnout system is one of the most important systems that set train routes. Turnout system integrity should be guaranteed for robust train operation. To diagnose the turnout system status, LVDT and accelerometers are installed on a turnout system in a high speed line. The LVDT and accelerometers produce signals containing physical meaning of the turnout systems. The LVDT produces the displacement of the rail gauge and vibration when point moving or a train passes on turnout systems and the accelerometer produces impact forces induced by wheel sets. We performed data extraction from the measured signals and parameterized the extracted signals into meaningful quantities. The parameters are used for classifying whether the turnout status is normal. We proposed two methods for the classification, one uses probabilistic distribution and the other artificial neuron networks. The probabilistic distribution is used for the parameter being classified by the quantities and the artificial neuron networks for the form classification. Finally, we show how to learn the normal status of a turnout system.

The Estimation of Rail Current Distribution According to Feeding Scheme (급전방식에 따른 레일전류 분포 예측)

  • Lee, C.M.;Han, M.S.;Jung, H.S.;Kim, J.R.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1619-1621
    • /
    • 2005
  • AC electric railway feeding system classifies into three groups such as normal, TIE and PP feeding method. If the feeding scheme of ac electric railway is changed, current distribution flowing through the line is also modified. And if the current distribution is altered according to the feeding scheme, returned tendency through rail load current or fault current of the train is changed. So the investigation about error correcting method of protective relay is needed considering feeding scheme. In this paper prior to error correcting of protective relay, through interpreting feeding circuit, changes in current distribution of the rail in accordance with feeding would be predicted and analyzed.

  • PDF

Analytical solution for steady seepage and groundwater inflow into an underwater tunnel

  • Zou, Jin-feng;Wei, An;Liang, Li
    • Geomechanics and Engineering
    • /
    • v.20 no.3
    • /
    • pp.267-273
    • /
    • 2020
  • Solutions of the water pressure and groundwater inflow distribution along the tunnel perimeter in a half-infinite aquifer were investigated considering the conditions of the constant head and constant water pressure. It is assumed that the circular tunnel is buried in a fully saturated, homogeneous, isotropic and half-infinite space. Coordinate transformation technique was adopted, the problem of solving the control equations of water pressure in the Cartesian coordinate was transformed to that in the bipolar coordinate system, which can significantly simplify the derivation procedure of the water pressure and inflow distribution. The validation results show the accuracy and advantage of the proposed approach.

A Study on Improvement of Collected Data Performance in Real-time Railway Safety Supervisory Platform (실시간 철도안전관제 플랫폼에서의 수집 데이터 성능 개선 방안 연구)

  • Shin, Kwang-Ho;Park, Jee-Won;Ahn, Jin
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.233-241
    • /
    • 2018
  • Recently, integrated railway safety monitoring and control system, which is a convergence system based on data distribution service for railway safety monitoring and control, is under development. It collects safety data of vehicle, signal, power and safety monitoring facilities in real time and adopts communication middleware based on distributed service for mass data processing. However, in the case of a server device used as an existing control server, the performance of the distributed service middleware can not be exhibited due to low hardware performance due to safety reasons. In the safety control system, 200,000 packets per second were set as the transmission target, but the performance test of the LAB was not satisfied. In this paper, we analyze the characteristics of railway data to improve the data collection performance of existing equipment and apply DDS-based streaming transmission method to the data model of signal facilities and vehicle facilities with large packet amount according to the analysis result. As a result, it was confirmed that the throughput was improved about 30.4 times when the hardware performance was the same. We plan to improve the data processing performance by applying it to real-time railway safety integrated monitoring and control system in the future.

A Study on the displacement characteristics of suspension elements for KTX (고속철도차량 현가계요소 변위특성 연구)

  • Hur H.M.;Kwon S.T.;Lee C.W.;Kim H.J.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.378-382
    • /
    • 2005
  • The opening of high speed railway upgraded our land transportation speed limit, causing lots of changes including living and culture and also paving the way for stepping up the railway technology. However, it is also true that we had a limit to adopt the existing railway system structured for 150km/h to the new structure requiring a higher speed of approximate 300km/h due to technological, based on the time and experience. More importantly, heading toward a step of operating such a high speed railway system, it has been practically and quickly proposed that the railway needs high speed railway engineering, maintenance technology of parts of the vehicles to have a stable maintenance foundation and localization of major parts. Therefore, this study was intended to research the actual displacement characteristics in runningg on an actual track for the purpose of developing the protective and maintenance technology of springs and dampers, which are core parts among suspension elements of a high speed railway vehicle. For this, it was researched the actual vehicle test and its interpretation centered on primary spring, which is used for the suspension system of a bogie, body-body dampers and body-bogie yaw damper. Also, to analyze the displacement characteristics of suspension system in the actual conditions of high speed railway vehicles, a vehicle‘s dynamic characteristics was analyzed and interpreted. At the same time, a tester for measuring the actual displacement of such suspension elements was designed and attached to actual vehicles, to measure the displacements that occur in running it on the Seoul-Busan line, one of major lines serviced by KTX. The displacement data gained from the test with actual vehicles was analyzed for its displacement distribution depending on the service sections and frequency, with which the valuable data necessary for any potential breakdown or maintenance in the future could be obtained.

  • PDF

A Study on the Energy Saving Strategy in Electric Railway System (직류 전기철도 에너지 절감방안 연구)

  • Choi Byung-Woon;Chang Sang-Hoon;Kim Hak-Ryun
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.676-681
    • /
    • 2005
  • The regenerative braked cars are being introduced in DC electric railway for energy saving. There has been a recent tendency for DC traction substation with regenerative inverter to increase in number. This is strongly related to the desire for effective utilization of electric power regenerated by DC electric cars and to the aim ensuring stable operation of regenerative braking system. The regenerative inverters DC power feed back from a generative car into AC power at a substation and supplies it to distribution lines. This paper suggest the result of characteristic analysis and capacity simulation. economical analysis in the regenerative inverter system.

  • PDF

A Study on Track Distribution Function of Urban Rail Systems (도시철도 선로의 배선기능 증진에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Youn-Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1174-1179
    • /
    • 2004
  • In general, the national rail system put an emphasis on distribution planing of stations for smooth operation of transporting goods, train allocation, parking, and maintenance. Since the national rail system is operated on the ground level, it is feasible to improve various aspects of the system during its operation. On the contrary, urban rail system is operated in the limited space under the ground, and thus, improving various aspects of the system during its operation is infeasible. Specifically, the urban subway system must have a comprehensive track distribution plan because the urban subway system has to operate in a limited environment such as it operates in a much shorter time period, The subway system has to be ready for various operations and events such as trains returning in the opposite direction. parking trains that need repair, parking during night time, storing various maintenance equipments, and connections to other tracks. Furthermore, considering the future extension of tracks, a comprehensive track distribution plan is a must.

  • PDF

Design and Characteristic Analysis of LSM for High Speed Train System using Magnetic Equivalent Circuit

  • Ham, Sang-Hwan;Cho, Su-Yeon;Kang, Dong-Woo;Lee, Hyung-Woo;Chan, Hong-Soon;Lee, Ju
    • International Journal of Railway
    • /
    • v.3 no.1
    • /
    • pp.14-18
    • /
    • 2010
  • This paper describes design and characteristic analysis of long primary type linear synchronous motor (LSM) for high speed train system. LSM is designed using loading distribution method and magnetic equivalent circuit. For characteristic analysis of LSM, analytical and numerical methods are applied. Analytical method for solving the magnetic field distribution of the analytic model is based on the Maxwell’s equations. Using the characteristic equation and magnetic equivalent circuit, we analyze the effect of variation of parameters, and then we validate the result by comparing with numerical method by finite element method (FEM). We compare the analytical method with numerical method for analyzing the effect by variable parameters. This result will be useful of design and forecast of performance without FEM.

  • PDF