Watt-Hour Metering Characteristics at Scott Transformer in AC Electric Railway Systems

  • Lee, Hansang;Lee, Kyebyung;Kim, Kisuk;Park, Yong-Up;Jeon, Young-Soo;Joo, Sung-Kwan;Jang, Gilsoo;Park, Chang-Hyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1398-1406
    • /
    • 2018
  • Owing to the consistent increase in accurate analysis issue for energy consumption of the AC electric railway systems, there is controversy about the adequacy of the present watt-hour metering configuration. Due to the unusual load characteristics and facilities, the discussions have not been active. Therefore, in order to achieve more accurate watt-hour metering for AC electric railway system, this paper proposes numerical formulas for watt-hour metering that reflects the highly-varying characteristics of the railway load and the structural characteristics of the Scott transformer. The proposed formulas have been verified by comparison with site-measured data, and a more suitable metering configuration for AC railway system has been proposed.

The Analysis of 4-Conductors Catenary System of AC Railway Feeding System and Calculation of Induced Voltage near Rail Track using the FDTD Method (교류 전기철도 급전계통 4도체군 전차선로 분석 및 FDTD 방법을 이용한 선로 주변 유도전압 계산에 관한 연구)

  • Ryu, Kyu-Sang;Yeom, Hyoung-Sun;Cho, Gyu-Jung;Lee, Hun-Do;Kim, Cheol-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.1958-1964
    • /
    • 2016
  • AC railway feeding system use single phase to supply power to the railway vehicles. And the system use the rail track as a return current path, so that current flows in the rail. In this situation inductive interference on communication system and unsafe environment can appear on railway system. Therefore knowing the current distribution of catenary system and analysing the return current is required. In this study detail return current distribution was analyzed by modeling the catenary system as 4-conductors group. The distribution characteristics and trends of return current were studied by using the PSCAD/EMTDC and FDTD method that based on Maxwell equation was used to calculate the induced voltage. Simulation code was made by MATLAB. Using this study result data, we can suggest the proper installation location of digital device and these data can be used for additional studies related to return current or induced voltage as a base data.

A Study of the Charging Current Effect on Underground Distribution Line in Electric Railway (전철 지중배전선로의 충전전류보상에 관한 연구)

  • Kim, Yang-Su;Jang, Woo-Jin
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.214-218
    • /
    • 2008
  • Because on the high-tension underground distribution line of an electric railway high voltage XLPE Cable two or three circuits between railway stations with a standard as receiving transformer facilities are established at a $30km{\sim}50km$ interval, reactive power in which the phase of a current is larger than that of a voltage is supplied when trains are not working, so when there are no loading or low loading as night. Due to the long-distance trend of the underground distribution system on an alternating current railway distribution line, the terminal voltage of a transformer is over the standard voltage, and after all, commercial cycle overvoltage is continued. To solve this problem, the shunt reactor is installed in middle of power distribution lines to maintain receiver voltage meted under the allowance regulation through control of the reactive power. Also, in case that the thickness of single cable is over $60mm^2$ and length of line is about over 30km, a circuit breaker is broken by shorting shunt ability of charging current in excess of shunt current(31.5A.rms). Therefore, this thesis presents installing the location of shunt reactor for quantitative analysis by using optimum algorism for compensation and control of the charging current.

  • PDF

Research on Design of DDS-based Conventional Railway Signal Data Specification for Real-time Railway Safety Monitoring and Control (실시간 철도 안전관제를 위한 DDS 기반의 일반철도 신호 데이터 규격 설계 연구)

  • Park, Yunjung;Lim, Damsub;Min, Dugki;Kim, Sang Ahm
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.4
    • /
    • pp.739-746
    • /
    • 2016
  • The real-time railway safety monitoring and control system is for prevention of safety accidents, and this system adopts DDS (Data Distribution Service) standard based data transmission method to support integrated management of data from existing on-site safety detection devices. In this paper, we introduce the design of DDS-based data specification from on-site signal equipment on the conventional railway. For this, we (1) design UML data model of KRS SG 0062 standard which defines existing data specification, (2) define DDS Topics for DDS transmission and map KRS model to DDS Topic model, (3) suggest data transformation rules and (4) design network control QoS polices. In addition, we analysis actual on-site log data and validate our data specification design. DDS-based data transmission enables data compatibility among on-site devices and the real-time railway safety monitoring and control system, and allows efficient network management for a large amount of data transfer.

A Study on the Supply and Stray Current Distribution of the DC Railway Power System (직류전기철도 급전시스템에서 공급 및 누설전류 분포에 관한 연구)

  • Cho, Woong-Ki;Choi, Kyu-Hyoung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.6
    • /
    • pp.160-168
    • /
    • 2010
  • This paper presents the analysis of the current as stray current and supplied current of the substation, on the DC railway power system. In DC railway power supply system, the running rails are usually used as the return conductor(negative-polarity) for traction load current. This condition mainly focuses on economic considerations, since it does not require the installation of an additional return conductor. But, problems of low resistance between the running rails for the return conductor and earth allows a significant part of the return load current to leak into the earth. This current is normally called to as leakage or stary current. This stary currents creates serious problems for any electrified matter in the underground. Therefore, reduction of stray current of the DC railway power supply system is also of direct benefit to the operational and safety aspects of the DC railway systems. In this paper, deal with the analysis of the current distribution on the DC railway power system applied the common grounding system, using SPLIT of CDEGS program.

Load Flow Calculation and Short Circuit Fault Transients in AC Electrified Railways

  • Hosseini, Seyed Hossein;Shahnia, Farhad
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.2203-2206
    • /
    • 2005
  • A load flow and short circuit fault simulation of AC electrified railway distribution systems is presented with DIgSILENT PowerFactory software. Load flow of electrified railways distribution system with concerning multi train lines and dynamic characteristics of train load is studied for different time laps. The dynamic characteristics of train load in starting and braking conditions with different starting and stopping times and its moving positions makes the load flow complicated so there is a great need in studying the effects of electrified railways on load flow. Short circuit fault transients is also studied and simulated for both power system or traction distribution system and their effects on the operation of the train sets is investigated.

  • PDF

Relation between Induced Voltage of Rail and Feeding Line of Wireless Power Transfer System for Railway Application (철도용 무선전력전송시스템의 급전선로와 레일유기전압의 관계)

  • Kim, JaeHee;Park, Chan-Bae;Jung, Shin-Myung;Lee, Seung-Hwan;Lee, Byung-Song;Lee, Jun-Ho;Lee, Su-Gil
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.228-232
    • /
    • 2014
  • The magnetic field generated by the feeding line of a wireless power transfer system induces voltage on the rail of a railway system. The induced voltage of the rail can have a bad influence on the track circuit and on safety. This paper simulated three feeding lines to study the relation between the feeding lines and the induced voltage of the rail; it also proposed magnetic field distribution of the feeding line to reduce the induced voltage.

A Study on the Economical Feasibility Analysis For Development of Dual Mode Trailer System

  • Kim, Kwang-Hee
    • Journal of Navigation and Port Research
    • /
    • v.34 no.2
    • /
    • pp.137-144
    • /
    • 2010
  • In light of the growing traffic congestion problem and congestion cost, the container transport by railway has to be increased. The freight transport by railway can have decided advantages over trucks in terms of energy efficiency, emissions and cost for certain freight movements, just as transportation in the metropolitan region can have great advantages over driving truck. But the freight transport by truck should gain significant mobility benefits from a freight railway system. Thus, the DMT(Dual Mode Trailer) transport system which is coupled railway transport advantages with load transport advantages has been developed and used in the european countries. The DMT transport will therefore serve the areas required by transport organizers. The purpose of this paper is to estimate economical feasibility analysis for development of DMT transport system. Consequently, this study analyzed the characteristics of the DMT system. The horizontal load.unload system is being considered as an adoptable DMT system in consideration of the situation in Korea.

Analysis of electric characteristics for extension power supply between different grounding railway distribution system (접지방식이 상이한 철도배전계통의 연장급전을 위한 전기적 특성분석)

  • Jung, Ho-Sung;Han, Moon-Seob;Lee, Chang-Mu;Kwon, Sam-Young;Park, Hyeun-Jun
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.736-741
    • /
    • 2005
  • This paper presents electric characteristics analysis and safe configuration for extension power supply between existent 6.6kV ungrounded distribution system and establishment and improvement 22.9kV direct grounding distribution system. For this, we model 6.6kV ungrounded and 22.9kV direct grounding distribution system of urban underground, ground region. and rural electrical, unelectrical region using PSCAD/EMTDC and analyze voltage drop, charging current, ground and short fault through simulation. To analyze electric characteristics of extension power supply, we simulate extension power supply of overhead line of 6.6kV ungrounded system and underground line of 22.9kV direct grounding system of rural electrical region and propose operation condition for safe extension power supply through result of analysis. Characteristics of voltage drop, charging current, ground and short fault appear almost similarly with electrical characteristic of direct power supply. However, because unbalance of phases may cause relay's malfunction of ungrounded system and ground fault current of direct grounding system may demage facilities of ungrounded system, we propose safe system configuration such as impedance grounding system of neutral point.