• Title/Summary/Keyword: railway construction

Search Result 1,413, Processing Time 0.022 seconds

Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence (편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰)

  • 정병두;박정욱;김경철
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

Computerized Railway Alignment Evaluation and Construction Quantity Estimation (궤도선형 계산 및 수량 산출 프로그램 개발)

  • Jee Sang Bok;Lee Tai Sik;Lee Dong Wook
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.379-384
    • /
    • 2005
  • To maintain the stability during the operation of railway vehicle, the perfect installation of rail, namely the orbit as well as the performance of the railway vehicle itself is required. The orbit of railway needs the intensity and elasticity that stands the shock and vibration due to the weight of the railway vehicle enough, Also, the driving safety during the operation of vehicle should be guaranteed, comfortable feeling of the passenger should be maintained, and the influence of the noise and vibration to the environs should be minimized. Therefore, it is necessary to develop a program that calculates the change of construction cost according to the selection of railway orbit. This study introduces the orbit design automation program according to the selection of railway orbit, and discuss the principle and the way to use of the program.

Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project (건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석)

  • Kang, Leen-Seok;Yun, Seon-Mi;Kwon, Jung-Hui;Mun, Jin-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

Probabilistic Approach on Railway Infrastructure Stability and Settlement Analysis

  • Lee, Sangho
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.45-52
    • /
    • 2013
  • Railway construction needs vast soil investigation for its infrastructure foundation designs along the planned railway path to identify the design parameters for stability and serviceability checks. The soil investigation data are usually classified and grouped to decide design input parameters per each construction section and budget estimates. Deterministic design method which most civil engineer and practitioner are familiar with has a clear limitation in construction/maintenance budget control, and occasionally produced overdesigned or unsafe design problems. Instead of using a batch type analysis with predetermined input parameters, data population collected from site soil investigation and design load condition can be statistically estimated for the mean and variance to present the feature of data distribution and optimized with a best fitting probability function. Probabilistic approach using entire feature of design input data enables to predict the worst, best and most probable cases based on identified ranges of soil and load data, which will help railway designer select construction method to save the time and cost. This paper introduces two Monte Carlo simulations actually applied on estimation of retaining wall external stability and long term settlement of organic soil in soil investigation area for a recent high speed railway project.

Comparative Analysis of Forecasted and Measured Traffic Demand for Gyung-bu High Speed Railway (경부고속철도 수송수요의 예측치와 실측치의 비교분석)

  • Oh In-Tack
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.889-896
    • /
    • 2005
  • While a year and a half has been passed since the launch of KTX service, traffic volume of Gyung-bu High Speed Railway is still much lower than the forecasted value. This situation has been badly affecting not only Korail's financial status but also KRNA's general railway construction projects as general public responds negatively to such projects as New Ho-nam Line Construction. This paper outlines traffic volume forecasting methodologies applied to construction of Gyung-bu High Speed Railway, identifies major causes of forecasting deviations. and finally extracts problems through comparison between the forecasted results and actual traffic volume.

  • PDF

A Study on The Risk Level of Work Types in Urban Railway Construction (도시철도 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Han, In-Kuk;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.98-103
    • /
    • 2016
  • The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.

A Study on Safety Accidents at Construction Work Sites of Railway (철도 건설공사 현장의 안전사고에 관한 연구)

  • Bang, Myung-Seok;Choi, Soo-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.5
    • /
    • pp.33-38
    • /
    • 2010
  • Railway is one of popular transportation systems. Due to the safety and in time, the transportation by train is preferred to the others for a long time. However, accidents under railway construction get more serious problems than in case of the other system, because it is the largest mass transportation system. Especially, the railway construction is composed of different kinds of construction works such as civil, architect, electric and mechanic. It is closely/complicatedly connected with various workers, large machines and facilities, regulations etc. In this study the data on safety accidents are corrected during 6 years(2004~2009) and analyzed by time(year, month, week, day, a.m or p.m), place, field, type etc. Results shows that there exists remakable trends on accidents, so efficient treatments should be prepared considering this trend.

Proposal for Specification of Counter-measurement in Frost-Heave System in Railway Underpass Box Structures in North Korea Considering Climate Condition (북한지역 기후조건을 고려한 철도횡단구조물의 동상방지방안 제시)

  • Kim, Mun-Su;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.99-110
    • /
    • 2017
  • As a part of several Eurasian initiatives, the Korean government is trying to reconnect railways through North Korea to the Asian continent. If South Korea could build a network using railway, it would be a chance to develop a robust economic environment and to motivate economic growth. In the railway reconnection project between North and South Korea, the most important part of the railway roadbed sector is repair or improvement, and then construction of a new line through North Korea. There are not many big differences in the geological conditions; however, climate condition varies greatly during winter. The most significant condition in the safety of railway operation is frost-heaving. However, since South Korea has a relatively mild climate condition compared with North Korea, design and construction specifications under severe weather conditions in winter have not been prepared. This study proposes a plan for revising the railway design standard for underpass structures through an analysis of international standards, leading to site construction to prevent frost-heave.

Design and Construction of Floating Slab Track (저진동 궤도슬래브의 설계와 시공)

  • Lee, Eun-Ho;Kim, Yong-Jae;Park, Myoung-Gyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.214-219
    • /
    • 2008
  • Recently, railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. In the case of domestic situation, both rapid transit railway and existing railway have been operated in higher speed and the construction of railway near the city building has been increased as well. Because of the rapid transit system and heavy railway, the noise and vibration of railway has been increased so that the strong standards in terms of environmental matter should be required. Therefore, the solution to avoid environmental matters becomes one of the most important factor in constructing railway. In this study, floating slab system which is one of the solution to avoid noise and vibration in railway has been introduced, and the foreign technology and the trend of this business has been investigated. In addition, the method of conceptual design and construction of floating slab system according to the isolator has been introduced.

  • PDF

Simulation Function of Railway Station Project by Virtual Construction Technology (가상건설기법에 의한 철도역사 시설물 시공시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Jin-Seok;Kwon, Jung-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.433-440
    • /
    • 2008
  • Virtual construction methodology enables to construct project facility from design phase to construction phase in 3D virtual environment. It is a technique that can solve problems of construction in virtual construction process. This study suggests some methodologies of virtual construction and developed a system for a railway station in Honam express railway project based on suggested methodologies. This study developed layout review and layer simulation functions. Those functions can improve the effectiveness of 3D simulation and the virtual construction system can be used as a verification tool for construction process of various construction projects.