• Title/Summary/Keyword: railroad control points

Search Result 19, Processing Time 0.023 seconds

Study on Coordinate Transformation of Railroad Central Linear-line Using the Railroad Reference Points (철도기준점을 이용한 철도중심선형 좌표변환에 관한 연구)

  • Moon, Cheung-Kyun;Heo, Joon;Kang, Sang-Gu;Kim, Il-Joo;Park, Jae-Hong;Kim, Sung-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.685-691
    • /
    • 2007
  • In this paper through Honan high-speed railroad which is planned with the north and south axis, we will verify the feasibility of the coordinate conversion using railroad control points after regarding current planned-railroad as the linear central axises. From analysis, distortion of Y axis varies 21 cm to 40 cm diminishing to a gentle straight line, distortion of X axis varies 14 cm to 29 cm. Through a revision, the deviation value between the coordinates were 6 mm to 9 mm and it satisfied the allowable error of national geographic information institute which is following ITRF (International Terrestrial Reference Frame) and cadastral boundary survey (10 cm). consequently the coordinate conversion is possible using railroad control points as common control points.

The Design of Monitoring System to Optimize Points Inspection Intervals (선로전환기 점검주기 최적화를 위한 모니터링시스템 설계)

  • Lim, In-Taek;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.7
    • /
    • pp.3444-3449
    • /
    • 2013
  • The control module controlling points has become high-tech. but the introduction of relevant company's inspection intervals and methods, and the adoption of the way which is used in relay interlock system became the cause of a failure by excessive and incorrect maintenance. The Human error in failure recovery process can cause vital accidents including train derailment, the points monitoring system could prevent this problem by monitoring points' operation condition in real time. After conducting the changed inspection intervals that applied the results of the criticality of each failure type, MTBF, MTTR, availability, maintainer's opinion, the work became simplified, and, the failure did not occur for 4 consecutive years in contrast to the previous annual average of 11 failures.

A Study on the Railway S/W Quality Enhancement Procedure on the View of S/W Process (프로세스 관점의 철도소프트웨어 품질향상방안 연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.1025-1026
    • /
    • 2006
  • The approach, for ensuring the quality and safety of a railway software can be considered with two points of views seeing from products, and from processes. The process point of view is to validate maturity of the organizations in accordance to the judging processes of organizations, which are specified by CMMI(Capability Maturity Model Integration) or SPICE(Software Process Improvement and Capability dEtermination : ISO/IEC15504). In this paper, we are trying to find approaches to estimate the maturity of manufacturer and assessment organization in the railway system.

  • PDF

A Study on a Standard Strategy of EMU Control and Monitoring System for Improved Maintenance Efficiency (유지보수 효율향상을 위한 전동차 제어 및 감시시스템 표준화 방안 연구)

  • Lee, Woo-Dong;Chung, Jong-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.241-245
    • /
    • 2013
  • In the case of the existing train control system, the driver monitors the condition of the vehicle through a composite controller device that displays various information on a screen in the vehicle. However, when problems arise such as car trouble, it is difficult for the drivers to take action immediately. In addition, maintenance personnel have to manually save data one by one after storing the vehicle to analyze control information of the main devices such as the brake controller and auxiliary power. To improve these points, a system that sends and receives all information in real time should be established by installing a sensor communication network and a surveillance system. This study attempts to improve the safety and maintenance of rail vehicles by suggesting a standardized method for train control and surveillance system.

Prevention of the Malfunction of the ATS Signaling System by Parallel Operation with ATC (철도신호시스템 병행운전(ATS/ATC)에 따른 ATS신호기 오동작개선)

  • Jeong, Rag-Gyo;Kim, Baek-Hyun;Kang, Seok-Won;Park, Geon-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.1019-1025
    • /
    • 2015
  • The performance requirements on the safety-based functionality of railway signal systems have been reinforced and the effort for enhancement of the existing system or development of the new system is being accordingly made. In particular, various technical researches on replacement or improvement of the existing ATS(Automatic Train Stop) signaling system are now in progress for better operational efficiency. In this study, the complementary points for improvement or replacement of the currently used system(i.e., ATS) will be derived in terms of operating efficiency in an integrated operating environment with the newly introduced system(e.g., ATC: Automatic Train Control). This study can contribute to derive the need for improvement of the signaling system by checking the interface problems and comparing between different systems through the analysis of real operation cases in the field. Eventually, this analysis can be applied to prevent and estimate the collision accidents can be caused by the failure of the signaling system in advance. In addition, the results can be used to provide a future direction to secure the reliability in the parallel operation by integration based on different railway signaling systems.

High Speed Image Processing Algorithm for Structure Displacement Measurement (영상처리를 이용한 구조물 변위측정을 위한 고속 알고리즘)

  • Oh, Joo-Sung;Lee, Jong-Woon
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.835-836
    • /
    • 2006
  • For non-contact structure vibration displacement measurement system, an algorithm for image processing using high speed CCD camera is introduced. The system sets the target to the structure, take picture using camera and image processing is performed to display the vibration data. The algorithm flow is basic preprocessing, projection data generation and curve fitting to find three crossing points for calibration or one center point in limited area.

  • PDF

Development of a Time-Based Railway Crossing Control System and Evaluation (철도건널목 정시간 제어방식 개발 밑 효과분석에 관한 연구)

  • Park Dongjoo;Oh Ju-Taek;Lee Sun-Ha;Jung Chun-Hee;Shin Seong-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.2
    • /
    • pp.145-154
    • /
    • 2005
  • Traffic accidents at highway-rail crossing result in larger social and economic damages than the accidents at the typical highway intersections. The traditional control and warning systems of the highway-rail crossing have limitations in that 1) they do not recognize the differences of the trains' arrival times because they rely on the distance-based control system, rather than the time-based one, and 2) thereby they usually cause longer delays of vehicles and pedestrians at the highway-rail crossings. The objective of this study is to develop a time-based railroad crossing control system which takes into account the speed and expected arrival time of trains. using the spot speeds and acceleration rates of trains measured at three points, the developed system was found to be able to accurately estimate the arrival time of train. VISSIM simulation package was utilized to compare system effect of the developed time-based railroad crossing control system with that of the conventional distance-based one. It was found that the developed time-based railroad crossing control system reduced the average travel time, maximum delay length, average delay time, and average number of stop-experienced vehicles as much as 7.0$\%$, 75.6$\%$, 12.7$\%$, and 60.0$\%$, respectively, compared with those from the conventional distance-based one.

On Enhancing Train-Centric Train Control System Development Process using DSM-based Safety Management (DSM 기법에 따른 안전 관리를 통한 차상중심 열차제어시스템 개발 프로세스의 개선에 관한 연구)

  • Kim, Joo-Uk;Oh, Seh Chan;Han, Seok Youn;Kim, Young-Min;Sim, Sang-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.129-138
    • /
    • 2016
  • The train-centric control systems development has some distinct points in that a big size of government budget is in general expended in there and the development duration seems to be long. In addition, the changes are ever made continuously in the capability and operational requirements for Trains. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks [7]. As such, proper management of project risk has been one of crucial subjects in the train systems development. All these notes combined together make it the significance of the safety management process be raised further up in the train-centric control systems development. As such, the underlying safety management process should be capable of appropriately handling the potential risks that can be created due to the unexpected changes and the long-term development period. The process should also be complemented for the safety consideration of train-centric control systems, for instance, stop. To study these aspect is the objective of the paper. To do so, a step-by-step approach to analyzing the safety management process is first presented. Then, to enhance the process some necessary and useful activities are added in terms of risk and safety management. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored using a design structure matrix method. The resultant process is applied in a train-centric control development as a case study.

Management of Vertical Control Points by Vector Method for Determination of Highway and Railroad Vertical Alignment (도로 및 철도의 종단선형 탐색을 위한 벡터방식의 Vertical Control Point 처리기법 연구)

  • Kim, Jeong Hyun;Han, Chang-Gun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2033-2040
    • /
    • 2013
  • There have been noticeable developments for the optimization of the highway and railroad alignments with the IT and computerized tools. The designers expect that all of the quantitative design elements should be considered. This study developed a methodology which can be useful for the vertical alignment design. It provides a accurate "vertical control point" searching method, and makes the vertical alignment optimization more efficiently. The vector method makes the searching faster and calculates more accurate application sections. The results from this method generate more reliable vertical alignments than the conventional raster method for less computation time.

The Technique Development for 3D Deformation Analysis of Railroad Bridge Using the Non-metric Camera (비측정용 디지털 카메라를 이용한 철도교량의 3차원 변형해석 기법개발)

  • Lee, Hyo-Seong;Ahn, Ki-Weon;Park, Byung-Uk;Shin, Seok-Hyo
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.129-131
    • /
    • 2010
  • This study is to measure 3d deformation of railroad-bridge of steel structure using the non-metric high-resolution digital camera. Measuring the deformation is to be utilized relative orientation using the coplanarity for reduction of the field survey and efficiency of the work. The results are compared with deformation by exterior orientation parameters, which are computed from 3d measurement of control points by the Total-station. Then accuracy of the utilized method will be verified.

  • PDF