Journal of the Korean Association of Geographic Information Studies
/
v.27
no.2
/
pp.34-44
/
2024
Recently, due to abnormal climate caused by climate change, natural disasters such as floods, landslides, and soil outflows are rapidly increasing. In Korea, more than 63% of the land is vulnerable to slope disasters due to the geographical characteristics of mountainous areas, and in particular, Quarry mines soil and rocks, so there is a high risk of landslides not only inside the workplace but also outside.Accordingly, this study built a DEM using UAV and aviation LiDAR for monitoring the quarry, conducted a time series change analysis, and proposed an optimal DEM construction method for monitoring the soil collection site. For DEM construction, UAV and LiDAR-based Point Cloud were built, and the ground was extracted using three algorithms: Aggressive Classification (AC), Conservative Classification (CC), and Standard Classification (SC). UAV and LiDAR-based DEM constructed according to the algorithm evaluated accuracy through comparison with digital map-based DEM.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.35
no.4
/
pp.261-268
/
2017
The topographic volume estimation is carried out for the earth work of a construction site and quarry excavation monitoring. The topographic surveying using instruments such as engineering levels, total stations, and GNSS (Global Navigation Satellite Systems) receivers have traditionally been used and the photogrammetric approach using drone systems has recently been introduced. However, these methods cannot be adopted for inaccessible areas where high resolution satellite images can be an alternative. We carried out experiments using Kompsat-3/3A data to estimate topographic volume for a quarry and checked the accuracy. We generated DEMs (Digital Elevation Model) using newly acquired Kompsat-3/3A data and checked the accuracy of the topographic volume estimation by comparing them to a reference DEM generated by timely operating a drone system. The experimental results showed that geometric differences between stereo images significantly lower the quality of the volume estimation. The tested Kompsat-3 data showed one meter level of elevation accuracy with the volume estimation error less than 1% while the tested Kompsat-3A data showed lower results because of the large geometric difference.
This study mainly reports preliminary results from site investigation of the Great Pyramids and Sphinx in Egypt and sampling works where conducted in the same limestone beds in Mokattam quarry in Cairo. Analyses of composition of samples showed similar result to those of limestone in Giza and thus such samples can be easily used for further experimental work without disturbing real monuments. Future work will be concentrated on the change of engineering properties of samples before and after artificial weathering and the change of digital image acquired from the colored surface of monuments.
Proceedings of the Korean Geotechical Society Conference
/
2009.03a
/
pp.677-685
/
2009
From the result of precise field investigation and stability examination for the cut slope, following results were acquired. 1. The cause of the cut slope collapse seems that it came from complex actions such as the weathering rock itself, existing fault zone and crack from excessive blasting. 2. As a result of analysis, it is appeared that the cut slope can be in danger of plane destruction. 3. The reinforcement force is decided by the result of limit equilibrium analysis. 4. For reinforcement the method after relaxing the slope was judged as the most proper method to the cut slope as comparing/analyzing Rock Anchor, Rock Bolt and method after relaxing the slope.
Dimitraki, Lamprini S.;Christaras, Basile G.;Arampelos, Nikolas D.
Geomechanics and Engineering
/
v.25
no.2
/
pp.111-121
/
2021
Large deformation and rapid pressure propagation take place inside the rock mass under the dynamic loads caused by the explosives, on quarry faces in order to extract aggregate material. The complexity of the science of rock blasting is due to a number of factors that affect the phenomenon. However, blasting engineering computations could be facilitated by innovative software algorithms in order to determine the results of the violent explosion, since field experiments are particularly difficult to be conducted. The present research focuses on the design of a Finite Element Analysis (FEA) code, for investigating in detail the behavior of limestone under the blasting effect of Ammonium Nitrate & Fuel Oil (ANFO). Specifically, the manuscript presents the FEA models and the relevant transient analysis results, simulating the blasting process for three types of limestone, ranging from poor to very good quality. The Finite Element code was developed by applying the Jones-Wilkins-Lee (JWL) equation of state to describe the thermodynamic state of ANFO and the pressure dependent Drucker-Prager failure criterion to define the limestone plasticity behavior, under blasting induced, high rate stress. A progressive damage model was also used in order to define the stiffness degradation and destruction of the material. This paper performs a comparative analysis and quantifies the phenomena regarding pressure, stress distribution and energy balance, for three types of limestone. The ultimate goal of this research is to provide an answer for a number of scientific questions, considering various phenomena taking place during the explosion event, using advanced computational tools.
An ore of stone obtained from quarry lose its about 60% such as the muck and the stone-dust during the process of making the architectural block, the crushed aggregate and so on. A part of the muck is only reutilized for the crushed aggregate as road pavement materials, while the most of the muck in the shape of powder is mixed with water and then it is deposited in a sludge tank. The muck in the shape of powder is called the stone-dust. If the stone-dust is discharged and sprayed, an ecosystem will have terrible damage because the seepage of surface water, the flow of ground water and the movement of air are not occurred smoothly by packing the void of soils. As the Waste Management Law (2003) in Korea, the stone-dust is sorted out the industrial waste and the most of that is dumped in ground. Therefore, the establishments of an efficient recycling plan are necessary through the improvement of engineering properties of the stone-dust. To investigate the possibility of recycle and improvement for the stone-dust, the stone-dust and natural soils are sampled from six quarries in Korea. The various soil tests are performed by use of the mixed soils with the stone-dust content ratio. As the result of various soil tests, the recycle possibility of the stone-dust is analyzed as subbase layer materials of the roads.
Post-Environmental impact investigation(Post-EII) plays an important role in investigating and reducing the environmental impacts of construction operations in South Korea. To date, it has been estimated that the results for Post-EII showed the low reliability; however, understanding those reliability has rarely been studied. We investigated the effect on water qualities by construction operations of the quarry mine, training center, and golf club in South Korea. In addition, the results of water quality analysis in this study were compared and analyzed with those in Post-EII. Treated wastewater in a quarry mine showed high concentrations of biochemical oxygen demand(BOD), suspended solid(SS), total nitrogen(T-N), and total phosphorus(T-P). Compared with the water quality results between this study and Post-EII, the concentrations of BOD, SS, T-N, and T-P in the treated wastewater were higher than the interquartile range(IQR) as well as the range of the results from minimum to maximum in Post-EII(p<0.05). The concentrations of BOD, SS, T-N, and T-P in treated wastewater were high under constructions in a training center. The concentrations of BOD and SS exceeded the consultation standard for the treated wastewater. These concentrations showed the significant difference with the IQR and the range from minimum to maximum of the water quality results in Post-EII(p<0.05). Therefore, the management and monitoring for water quality should be conducted in the treated wastewater by of construction operations. In addition, the alternative to enhance the reliability for the water quality results should be sought in Post-EII.
The slope stabilization analysis was performed by conducting survey and selecting the representative section in order to improve slope composition and management technology of masonry embankments in the quarry area, The mean slope of the masonry retain wall (A, B, C, D, E, F) was $38.5^{\circ}$, although the steep slope of the lowest slope (A) as $59^{\circ}$. The horizontal distance of the masonry embankments is 66.2 m and the slope height is 48.3 m. However, the inclination of the masonry embankments is relatively steep and visually unstable. The slope stability analysis for the slope stability analysis was taken into account during the drying and saturation. The slope stability analysis during saturation was performed by modeling the fully saturated slope. The strength constants of the ground were divided into two groups. The safety factor for dry period was 1.850 and the safety factor for rainy season was 1.333. The safety rate of dry period and rainy season was above 1.5 and 1.2. However, the weathered granite on the upper part of the masonry embankments at the time of heavy rainfall is considered to have a high risk of slope erosion and collapse. Therefore, it is considered necessary to take measures for stabilization through appropriate maintenance such as drainage installation.
This study was carried out to provide necessary information for improving quarrying industry management in Korea. The results of the study are summarized as follows : 1. In aggregate and building-stone quarrying firms the managers over 40 years of age are 97% and 89.1%, the ones above education level of high school are 90% and 85% and the ones not more than 10 years of quarrying experience are 70% and 52%, respectively. Accordingly it can be pointed out that most of the managers of two types of firms are relatively old, have high educational background, while quarrying experiences of building-stone firm managers are longer than that of aggregate firm managers. 2. Most of the management forms are social corporation(60%) for aggregate quarry firms and private management(76%) for building-stone firms. Average areas of permitted stone-pits of aggregate and building-stone quarries are about 2.86ha and 1.66ha respectively. That is, aggregate quarrying firms are carried on a larger scale than building-stone quarrying firms. 3. The yearly average product of aggregate quarrying firms has increased steadily from $88.961m^3$ in 1985 to $144.028m^3$ in 1988, while, in case of building-stone quarry firms, it has significantly increased from $4.155m^3$ to $19.462m^3$ from 1985 to 1987, but reduced to $13.400m^3$ in 1988. Unstable production activities of building-stone quarrying firms may require continuous government support. 4. Major cost items are equipment rental, depreciation, salaries, repair, maintenance for aggregate quarrying firms, and salaries, depreciation, fuel, tax for building-stone quarrying firms. The yearly average rate of return is about 9.7% for aggregate quarry firms and 2.6% for building-stone quarry firms. It can be pointed out that aggregate quarrying firms is better managed than building-stone quarrying firms. 5. The production elasticity of salary for aggregate quarrying firms is 0.495, that of employees is 0.559, and that of capital service is 0.513. The sum of the elasticities is 1.257>1. Fur building-stone quarrying firms, that of employees is 0.492, that of variable costs is 0.192, and that of capital service is 0.498. The sum of elasticities is 1.172>1, thus denotes the increasing returns to scale for both types quarrying firms. 6. The ratio of marginal value product to opportunity cost of empolyees is 2.54, that of variable costs is 3.62, and that of capital service is 1.45, in aggregate quarrying firms. That of employees is 2.47, that is variable costs was 2.34, and that of capital service is 19.67 in building-stone quarrying firms. Therefore the critical factors for more expansion of management scale in aggregate quarrying firms are variable cost and employees, and are capital service in building-stone quarry ing firms. 7. The break-even points of stone sales are about 0.587 billion won and 0.22 billion won in aggregate and building-stone quarrying firms respectively. The optimum sales Level for profit maximization are about 2.0 billion and 0.5 billion in aggregate and building-stone quarry firms respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.