• Title/Summary/Keyword: push-out

Search Result 399, Processing Time 0.026 seconds

The Results of Posterior Cruciate Ligament Reconstruction. -Transtibial Two Tunnel Technique vs. Modified Tibial Inlay Technique- (관절경적 후방십자인대 재건술에 있어서 Transtibial Two Tunnel방법과 Modified Tibial Inlay방법의 비교)

  • Jung, Young Bok;Tae, Suk Kee;Yum, Jae Kwang;Koo, Bon Ho
    • Journal of the Korean Arthroscopy Society
    • /
    • v.2 no.2
    • /
    • pp.135-140
    • /
    • 1998
  • From 1989 to 1994, authors have reconstructed the posterior cruciate ligament(PCL) in 51 knees with an autogenous central one-third of the patellar tendon by transtibial two tunnel technique, but there were not a few cases of unfavorable results. So from January 1995, we have reconstructed the PCL deficient knees by "modified tibial inlay technique" to avoid the grafted tendon abrasion at the posterior opening of the tibial tunnel(killer turn). Purpose of this study was to compare the results of two surgical techniques and what its advantages and disadvantages are. We could follow up 39 cases of transtibial two tunnel techique group(group A) more than one year, average being 23.7 months and 21 cases of modified tibial inlay technique group(group B) more than 12 months, average being 14.7 months. The clinical results were evaluated by the OAK knee scoring system ($M{\ddot{u}}ller$'s criteria) and the posteror stress roentgenography (push view) with Telos stress device compared with the uninjured knees. The arthroscopic second-look findings were also evaluated. In group A : The $M{\ddot{u}}ller$'s knee score was average 80.1 points, the posteror displacement in push view was average 4.4mm at the last follow up. There were 17 cases(44%) of unfavorable results which showed unstable posterior displacement more than 4mm compared with the uninjured knee in push view. Among the 19 cases of arthroscopic second look examinations, nearly normal PCL appearances of the grafted tendons were noted only in 9 cases(47%). In group B : The $M{\ddot{u}}ller$'s knee score was average 86.7 points, the posterior displacemnet in push view was average 3.6mm at the last follow up. There were 5 cases(23.8%) of unfavorable results which showed unstable posterior displacement more than 4mm compared with the uninjured knee in push view but 4 out of 5 cases showed 6mm posterior displacement in push views. Among the 7 cases of arthroscopic second-look examinations, 6 cases(86%) showed nearly normal PCL appearances of the grafted tendons. In modified tibial inlay technique of PCL reconstruction, it was easier to pull out the BPTB and in cases of remained laxed meniscofemoral ligament it was easier to preserve the remained structures than transtibial two tunnel technique. We expect the "modified tibial inlay technique" may solve the problem of grafted patellar tendon abrasion at the posterior orifice of tibial tunnel and may contribute to the successful PCL reconstruction.

  • PDF

Mechanical Properties of High Strength Shear Connector (고강도(高强度) 스터드 볼트의 역학적 특성에 관한 연구)

  • Eom, Chul Hwan
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.93-98
    • /
    • 2012
  • The headed studs those are used extensively for steel-composite construction is specified as SS400 at the current Korean Standard specification considering the welding condition. And the corresponding equation for the shear force calculation is limited for the use of compression strength of concrete below $300kg/cm^2$. However, it is expected that the high strengthening and precast of both steel and concrete due to the necessity of shear connector or other connecting material for the combination of steel and concrete. Therefore, the experimental results obtained during the development process of high strength stud for the connection of high strength concrete and the steel member are reported in this paper. Also the effectiveness of newly developed shear connector using pipe to increase the stiffness of a stud is verified by comparing both the stiffness and the strength with common stud bolt through the welding ability, mechanical characteristics and experimental investigation.

Performance analysis of a loss priority control scheme in an input and output queueing ATM switch (입출력 단에 버퍼를 가지는 ATM 교환기의 손실우선순위 제어의 성능 분석)

  • 이재용
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.6
    • /
    • pp.1148-1159
    • /
    • 1997
  • In the broadband integrated service digital networks (B-ISDN), ATM switches hould be abld to accommodate diverse types of applications ith different traffic characteristics and quality ddo services (QOS). Thus, in order to increase the utilization of switches and satisfy the QOS's of each traffic type, some types of priority control schemes are needed in ATM switches. In this paper, a nonblocking input and output queueing ATm switch with capacity C is considered in which two classes of traffics with different loss probability constraints are admitted. 'Partial push-out' algorithm is suggested as a loss priority control schemes, and the performance of this algorithm is analyzed when this is adopted in input buffers of the switch. The quque length distribution of input buffers and loss probabilities of each traffic are obtained using a matrix-geometric solution method. Numerical analysis and simulation indicate that the utilization of the switch with partial push-out algorithm satisfying the QOS's of each traffic is much higher than that of the switch without control. Also, the required buffer size is reduced while satisfying the same QOS's.

  • PDF

A Study on the Strength of Stud Shear Connectors in High Strength Concrete Composite Structures. (고강도 콘크리트 합성구조의 스터드 쉬어콘넥더 내력에 관한 연구)

  • 박복만
    • Journal of the Korean Professional Engineers Association
    • /
    • v.19 no.3
    • /
    • pp.23-30
    • /
    • 1986
  • This study summarizes the results of tests on 18 two-slab push out specimens. The main purpose of tile survey was to evaluate the capacity and behavior of stud shear connectors embedded in high strength normal concrete (F$\sub$c/=260~390kg/$\textrm{cm}^2$). The normal concrete was made with crushed stones and natural sand near the Han River. Two different diameters (ø19mm, ø16 mm) of stud shear connectors were used for push out specimens. The following conclusions were drawn from this study. 1) The shear strength of stud connectors embedded in high strength concrete (F$\sub$c/=260~390kg/$\textrm{cm}^2$) was influenced by tensile stress of the stud shear connectors. The following empirical function described the test results: q$\sub$u/=0.5A$\sub$s/√F$\sub$c/E$\sub$c/$\leq$0.7A$\sub$u/F$\sub$u/ 2) The maximum load in this study was reached at slips varying from 2.5~6mm.

  • PDF

Numerical studies on shear connectors in push-out tests under elevated temperatures

  • Wang, Aaron J.
    • Structural Engineering and Mechanics
    • /
    • v.39 no.3
    • /
    • pp.317-338
    • /
    • 2011
  • Three-dimensional thermal and mechanical coupled finite element models are proposed to study the structural behaviours of shear connectors under fire. Concrete slabs, steel beams and shear connectors are modelled with eight-noded solid elements, and profiled steel deckings are modelled with eight-noded shell elements. Thermal, mechanical and geometrical nonlinearities are incorporated into the models. With the proper incorporation of thermal and mechanical contacts among steel beams, shear connectors, steel deckings and concrete slabs, both of the models are verified to be accurate after the validation against a series of push-out tests in the room temperature or under the standard fire. Various thermal and mechanical responses are also extracted and observed in details from the results of the numerical analyses, which gives a better understanding of the structural behavior of shear connectors under elevated temperatures.

Shear transfer mechanism in connections involving concrete filled steel columns under shear forces

  • De Nardin, Silvana;El Debs, Ana Lucia H.C.
    • Steel and Composite Structures
    • /
    • v.28 no.4
    • /
    • pp.449-460
    • /
    • 2018
  • This paper reports the experimental results of three through bolt beam-column connections under pure shear forces using modified push-out tests. The investigated specimens include extended end-plates and six through-bolts connecting square concrete-filled steel tubular column (S-CFST) to steel beams. The main goal of this study is to investigate if and how the mechanical shear connectors, such as steel angles and stud bolts, contribute to the shear transfer mechanisms in the steel-concrete interface of the composite column. The contribution of shear studs and steel angles to improve the shear resistance of steel-concrete interface in through-bolt connections was investigated using tests. The results showed that their contribution is not significant when the beam-column connection is included in the push-out tests. The specimens failed by pure shear of the long bolts, and the ultimate load can be predicted using the shear resistance of the bolts under shear forces. The predicted values of load allowed obtaining a good agreement with the tests results.

Shear Strength of Stud Shear Connectors in Precast Concrete Deck using Lightweight Concrete (경량콘크리트를 사용한 프리캐스트 바닥판에서 스터드 전단열결재의 전단강도)

  • Cho, Sun-Kyu;Youn, Seok-Goo;Lee, Jong-Min;Kim, Su-Hyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.414-417
    • /
    • 2006
  • In order to evaluate the shear strength of stud connectors in composite bridges using lightweight concrete decks, static push-out tests were performed. Sixteen push-out specimens were tested during this investigation. The test program consisted of two groups according to deck type, one is cast-in-place(CIP) concrete deck, the other is precast concrete deck. The experimental parameters were concrete compressive strength and bedding layer thickness. Based on the experimental results, the ultimate shear strength and the stiffness of shear connectors in lightweight concrete decks are assessed.

  • PDF

Deterioration in strength of studs based on two-parameter fatigue failure criterion

  • Wang, Bing;Huang, Qiao;Liu, Xiaoling
    • Steel and Composite Structures
    • /
    • v.23 no.2
    • /
    • pp.239-250
    • /
    • 2017
  • In the concept of two-parameter fatigue failure criterion, the material fatigue failure is determined by the damage degree and the current stress level. Based on this viewpoint, a residual strength degradation model for stud shear connectors under fatigue loads is proposed in this study. First, existing residual strength degradation models and test data are summarized. Next, three series of 11 push-out specimen tests according to the standard push-out test method in Eurocode-4 are performed: the static strength test, the fatigue endurance test and the residual strength test. By introducing the "two-parameter fatigue failure criterion," a residual strength calculation model after cyclic loading is derived, considering the nonlinear fatigue damage and the current stress condition. The parameters are achieved by fitting the data from this study and some literature data. Finally, through verification using several literature reports, the results show that the model can better describe the strength degradation law of stud connectors.

Shear behavior of multi-hole perfobond connectors in steel-concrete structure

  • Xing, Wei;Lin, Xiao;Shiling, Pei
    • Structural Engineering and Mechanics
    • /
    • v.56 no.6
    • /
    • pp.983-1001
    • /
    • 2015
  • This study focuses on the load carrying capacity and the force transfer mechanism of multi-hole perfobond shear connectors in steel-concrete composite structure. The behavior of multi-hole perfobond shear connector is more complicated than single-hole connector cases. 2 groups push-out tests were conducted. Based on the test results, behavior of the connection was analyzed and the failure mechanism was identified. Simplified iterative method and analytic solution were proposed based on force equilibrium for analyzing multi-hole perfobond shear connector performance. Finally, the sensitivity of design parameters of multi-hole perfobond shear connector was investigated. The results of this research showed that shear force distribution curve of multi-hole perfobond shear connector is near catenary. Shear forces distribution were determined by stiffness ratio of steel to concrete member, stiffness ratio of shear connector to steel member, and number of row. Efficiency coefficient was proposed to should be taking into account in different limit state.

Performance of shear connectors at elevated temperatures - A review

  • Shahabi, S.E.M.;Sulong, N.H. Ramli;Shariati, M.;Shah, S.N.R.
    • Steel and Composite Structures
    • /
    • v.20 no.1
    • /
    • pp.185-203
    • /
    • 2016
  • Shear connectors are key components to ensure the efficient composite action and satisfactory transfer of shear forces at the steel-concrete interface in composite beams. Under hazardous circumstances, such as fire in a building, the performance of a composite beam significantly relies on the performance of shear connectors. Studies on the behavior of shear connectors subjected to elevated temperatures performed in the last decade are reviewed in this paper. The experimental testing of push-out specimens, the design approaches provided by researchers and different codes, the major failure modes, and the finite element modeling of shear connectors are highlighted. The critical research review showed that the strength of a shear connector decreases proportionally with the increase in temperature. Compared with the volume of work published on shear connectors at ambient temperatures, a few studies on the behavior of shear connectors under fire have been conducted. Several areas where additional research is needed are also identified in this paper.