Evaluating the pull-out load capacity of steel bolt using Schmidt hammer and ultrasonic pulse velocity test

  • Saleem, Muhammad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.5
    • /
    • pp.601-609
    • /
    • 2018
  • Steel bolts are used in the construction industry for a large variety of applications that range from fixing permanent installations to temporary fixtures. In the past much research has been focused on developing destructive testing techniques to estimate their pull-out load carrying capacity with very little attention to develop non-destructive techniques. In this regards the presented research work details the combined use of ultrasonic pulse velocity and Schmidt hammer tests to identify anchor bolts with faculty installation and to estimate their pull-out strength by relating it to the Schmidt hammer rebound value. From experimentation, it was observed that the load capacity of bolt depends on its embedment length, diameter, bond quality/concrete strength and alignment. Ultrasonic pulse velocity test is used to judge the quality of bond of embedded anchor bolt by relating the increase in ultrasonic pulse transit time to the presence of internal pours and cracks in the vicinity of steel bolt and the surrounding concrete. This information combined with the Schmidt hammer rebound number, R, can be used to accurately identify defective bolts which resulted in lower pull-out strength. 12 mm diameter bolts with embedment length of 70 mm and 50 mm were investigated using constant strength concrete. Pull-out load capacity versus the Schmidt hammer rebound number for each embedment length is presented.

Pull-out Capacity of Screw Anchor Pile in Sand Using Reduced-Scale Model Tests (축소모형실험을 이용한 사질토 지반에 근입된 Screw Anchor Pile의 인발저항특성)

  • Kim, Dae-Hyun;Yoo, Chung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.121-133
    • /
    • 2013
  • This paper presents the results of an investigation into the pull-out capacity characteristics of screw anchor piles. Theoretical background of screw anchor pile (SAP) was first discussed. A series of reduced-scale model tests were performed on a number of cases with different SAP geometries such as pitch and diameter of screw as well as relative density of the model ground. The applicability of the pull-out capacity prediction equations were also examined based on the test results. It was shown that the pitch of screw has negligible effect on the pull-out capacity, while the diameter of screw has relatively large effect on pull-out capacity under a given condition. Practical implications of the findings from this study are discussed in great detail.

An analysis of the Behaviour of Uplift-Resisting Ground Anchors from Pull-out Tests (현장시험을 통한 부력앵커의 거동분석)

  • Lee, Cheolju;Jun, Sanghyun;Yoo, Namjae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.1
    • /
    • pp.33-40
    • /
    • 2007
  • Engineering behaviour of uplift-resisting ground anchors constructed in weathered rocks has been investigated by carrying out a series of full scale pull-out tests. The anchor was to resist uplift forces (buoyancy) associated with high groundwater table acting on the basement of a rail way station. The study has included the ultimate pull-out capacity of the anchors and shear stress transfer mechanism at the anchor-ground interface. The pull-out tests were conducted by changing bonded lengths of the anchor (2~7 m) and diameter of drilled borehole (108~165 mm) to investigate their effects on the behaviour of the anchor. The measured results showed that the ultimate capacity of the anchors was increased with an increase in the bonded length, diameter of drilled borehole as expected. The ultimate capacity of the anchors deduced from the pull-out tests ranged from 392 to 1,569 kN, depending on the above-mentioned factors. This corresponds to the interface shear strength of about 227~505 kPa. Interface shear stresses deduced from the pull-out test showed that the larger the pull-out force, the larger the mobilisation of the interface shear strength. The failure mode of the anchors heavily depended on the bonded lengths of the anchors. When the bonded length was short (2~3 m), a cone-type failure was observed, whereas when the bonded length increased (5~7 m), failure developed at the grout-ground interface.

  • PDF

An Experimental Study on the Pull-Out Behaviors of Headed GFRP Rebar in Mortar (정착판 GFRP 근(Rebar)의 모르타르 인발거동에 관한 시험연구)

  • Ji, Hyo-Seon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.6
    • /
    • pp.2797-2803
    • /
    • 2012
  • This paper presents the pull-out behaviors of headed glass fiber reinforced polymer (GFRP) rebar embedded in mortar under tension loading. Five specimens with headed GFRP rebars that were anchored in the center of mortar bases were constructed and the pull-out test was conducted. To verify the test results, the finite element analysis was conducted and the results were compared with the FE analysis using ANSYS software package. Based on the test results it was indicated that the CCD(concrete capacity design) failure theory should be adopted and not to use the 45o cone failure theory as the breakout capacity in the headed GFRP rebar embedded in mortar.

The effect of group pile installation (무리말뚝 시공의 영향)

  • Lee, Myung-Whan;Hong, Hun-Sung;Kim, Sung-Hoi;Jun, Young-Suk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1303-1311
    • /
    • 2006
  • Most of the piles are designed as group piles. In certain geotechnical environments, the installation of group piles causes heaving of the already installed piles. The unfavorable effects of pile heaving on pile bearing capacity have been well known to field engineers. However not many engineers pay enough attention to this subject. According to our recent researches, not only the bearing capacity but also the pile material could be seriously damaged due to the installation of nearby piles, especially with the cases of precast concrete piles. When the pull-out force due to installation of neighboring piles acting on the already installed precast concrete pile exceeds the shaft friction, pile heaving occurs. At the same time, if the pull-out force exceeds the allowable tensile strength of the precast concrete pile, tensile failure is inevitable, which is critical for the pile integrity. In other cases the pile material was not damaged but serious relaxation occurred as the results of pile heaving. In this paper, the pull-out mechanism due to the installation of group piles is explained.

  • PDF

Pull-out Capacity of Cast-in-place Anchor for Construction of Precast Concrete Segment Arch (프리캐스트 콘크리트 패널 분절 아치 시공을 위한 선설치 앵커의 인발 강도 평가)

  • Ahn, Jin-Hee;Yim, Hong Jae;Bang, Jin Soo;Jeon, Seok Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.2
    • /
    • pp.94-102
    • /
    • 2020
  • Precast concrete segment arch system has an economic and construct ability that combined with advantage of precast concrete and arch behavior. A precast concrete segment arch system with outrigger is consisted of segmented precast panels, a steel outrigger rib, and V-strip to connect precast panels with a steel outrigger rib and cast-in-place anchors in precast panels to connect V-strip should have sufficient pull-out capacity to form its arch shape by site lifting for assembled precast panels and outriggers. However, it is difficult to secure its embedment depth due to the relatively shallow thickness of precast panel. It can be also occurred that flexure deformation of precast panels caused by its pull-out behaviors. In this study, pull-out capacity of cast-in-place anchor was examined for construction of precast concrete segment arch system with outriggers. Therefore, a total of 24 precast panel specimens were fabricated to examine pull-out capacities of cast-in-place anchor in precast panels, and installation depth of anchors, diameter of anchors and wire mesh effects for the precast panel were examined. From this pull-out tests, its pull-out capacities and failure modes were evaluated and the type of the cast-in-place anchor applicable to the precast concrete segment panel arch system with outriggers was determined from comparison of the design specification values.

On determining seismic anchor force of anchoring frame structure supporting three-stage slope

  • Lin, Yu-liang;Lu, Li;Li, Ying-xin;Xue, Yuan;Feng, Zhi-jun;Wang, Zhi-meng;Yang, Guo-lin
    • Geomechanics and Engineering
    • /
    • v.22 no.3
    • /
    • pp.265-275
    • /
    • 2020
  • As a flexible supporting structure, the anchoring frame structure is widely adopted to support multistage slopes in high earthquake-intensity area for its effectiveness and practicality. The previous study indicates that the anchor of anchoring frame structure is the most likely to be damaged during earthquakes. It is crucial to determine the pull-out capacity of anchor against seismic force for the seismic design of anchoring frame structure. In this study, an analytical model of a three-stage slope supported by anchoring frame structure is established, and the upper bound method of limit analysis is applied to deduce the seismic anchor force of anchoring frame structure. The pull-out capacity of anchor against seismic force of anchoring frame structure at each stage is obtained by computer programming. The proposed method is proved to be reasonable and effective compared with the existing published solution. Besides, the influence of main parameters on the pull-out capacity of anchor against seismic force is analyzed to provide some recommendations for the seismic design of anchoring frame structure.

Design Equation for Punching Shear Capacity of SFRC Slabs

  • Higashiyama, Hiroshi;Ota, Akari;Mizukoshi, Mutsumi
    • International Journal of Concrete Structures and Materials
    • /
    • v.5 no.1
    • /
    • pp.35-42
    • /
    • 2011
  • In this paper, a design equation for the punching shear capacity of steel fiber reinforced concrete (SFRC) slabs is proposed based on the Japan Society of Civil Engineers (JSCE) standard specifications. Addition of steel fibers into concrete improves mechanical behavior, ductility, and fatigue strength of concrete. Previous studies have demonstrated the effectiveness of fiber reinforcement in improving the shear behavior of reinforced concrete slabs. In this study, twelve SFRC slabs using hooked-ends type steel fibers are tested with varying fiber dosage, slab thickness, steel reinforcement ratio, and compressive strength. Furthermore, test data conducted by earlier researchers are involved to verify the proposed design equation. The proposed design equation addresses the fiber pull-out strength and the critical shear perimeter changed by the fiber factor. Consequently, it is confirmed that the proposed design equation can predict the punching shear capacity of SFRC slabs with an applicable accuracy.

Estimation of Pull-out force by using modified Direct Shear Apparatus (개설된 직접전단시험기(CNS)를 이용한 보강재의 인발력 추정)

  • 유병선;이학무;장기태;한희수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.145-154
    • /
    • 2003
  • When a nail pulled out in dense, granular soil, the soil in the vicinity of the nail tends to dilate, but its dilatancy results in a normal stress concentration at the soil/nail interface, thereby increasing the pull-out resistance of the inclusion. It is thought to be occurring within the resistance zone where the soil mass is at stationary state and the reinforcement are held in position by the soil, due to the friction or bond. In this paper, A series of direct shear and interface tests were conducted by using so called‘Constant Normal Stiffness Test Apparatus’which was modified and improved from the conventional direct shear box test rig. Unlikely the normal shear box test, this enables to simulate the different constraint effects of surrounding soil during shear under the conditions of constant stress and volume, constant normal stiffness. The aim of the research programme is to get better understanding of pull-out bond mechanism, thus to explore the possibility of evaluating the pull-out bond capacity of soil/reinforcement at the preliminary design stage from the laboratory test.

  • PDF

An Experimental Study on Structural Capacity of Joint Between Composite PHC Wall Pile and Bottom Slab with CT Shear Connector (CT형강 전단연결재가 적용된 합성형 PHC벽체파일-하부슬래브 연결부 성능에 관한 실험적 연구)

  • Mha, Ho Seong;Won, Jeong Hun;Lee, Jong Ku
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.5
    • /
    • pp.531-541
    • /
    • 2013
  • This paper investigated the structural capacity of the CT shear connectors, which is a kind of the perfobond rib and functions as an anchor transferring the tension force in the joint between a composite PHC wall pile and a bottom slab. The direct pull-out test was performed for various specimens. From failure modes and load-displacement curves, it was found that transverse rebars should be placed to holes in a web to restrict pull-out failure of CT shear connectors. The results of additional tests for specimens with transverse rebars and various support lengths indicated that all specimens were failed by the tension failure of PHC pile before pull-out failure of CT shear connector and concrete pull-out failure. Thus, the CT shear connector could endure the tension force between the PHC wall pile and the bottom slab.