Journal of Construction Engineering and Project Management
/
v.5
no.3
/
pp.18-28
/
2015
Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.131-138
/
2002
Traditional bidding process and activities in public construction area has many problems in terms of the clearness and fairness of administration. And, it causes many cost consumption to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey and questionnaire, to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems.
International conference on construction engineering and project management
/
2022.06a
/
pp.83-90
/
2022
Public-private partnerships (PPP) projects are becoming popular in both developed and developing countries due to their ability to access new financing sources and transfer certain project risks to the private sector. PPP has been an active research area where the concept of Critical Success Factors (CSF) is often discussed by researchers. This study aims to identify the CSFs for various PPP infrastructure projects that have been explored in previous CSF studies. This article reviewed the literature about CSF in PPP projects from the years 2002 to 2021, compared the findings of studies regarding the identified CSFs, and consolidated the CSFs that can be applied to various PPP infrastructure projects. The results showed that dominant research focused on general infrastructure, where CSFs can be applied to all infrastructure sectors rather than any specific sector. The most identified CSFs from the study are favorable and efficient legal frameworks, appropriate risk allocation and sharing, a robust and reliable private consortium, a competitive and transparent procurement process, and political support and stability. The findings from the study can provide an overview of CSFs that are relevant to specific PPP infrastructure sectors like building infrastructure, transportation, water, etc. as well as for general infrastructure. In addition, the results can also be used for further empirical analysis.
Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.
Eshun, Bridget Tawiah Badu;Chan, Albert P.C.;Oteng, Daniel;Antwi-Afari, Maxwell Fordjour
International conference on construction engineering and project management
/
2022.06a
/
pp.33-41
/
2022
Infrastructure procurement has been a major engagement route between China and Africa. This contributes immensely to the gradual infrastructure development seen on the continent. However, maturing discourse purports that these infrastructure collaborations lack intentionality in the continuous development of strategic guidelines and policies for effective implementation despite their uniqueness and criticality. This study proposes that an efficient approach to policy recommendations is through the political and economic analysis (PEA) of these partnerships using public-private partnership (PPP) optics. Unquestionably, these partnerships are representative of the concept of diplomatic transnational public-private partnership (DT-PPP) where infrastructure is procured through the collaboration of public (African governments) and private sector (Chinese state-owned corporations) who provide the managerial, financial, and technical resources for the project implementation. Given the quest for sustainable win-win, this study identifies strategies towards the realization of win-win in the implementation (i.e enablers of win-win) such that fairness and co-benefit, as well as interests, will be achieved. Thus, based on the PEA framework, case scenarios from Ghana and Nigeria using expert interviews identify the criticalities and best practices for the realization of these enablers at the development phase. Findings indicate more effort is required of the public sector (African host countries) in terms of people, structure/institutions, and the implementation processes. Recommendations include improvement of environmental management structures, contract administration procedures, external stakeholders/local community engagement mechanisms, knowledge and technology transfer procedures, and sector-based project operation and maintenance culture and systems. Additionally, actors must have emotional intelligence, good problem-solving abilities, and overall ensure cordial relationships for continued bilateral cooperation.
Korean Journal of Computational Design and Engineering
/
v.20
no.2
/
pp.171-181
/
2015
Building Information Modeling (BIM) provides many advantages when it is adopted in virtual design construction, to analyze constructability, etc. For this reason, advanced countries have made it mandatory to adopt BIM in public construction projects. The Korea Public Procurement Service announced that from 2016, BIM adoption will be mandatory in every construction project in Korea. Currently, however, it is not possible to fully adopt BIM in the building design process domestically because BIM-based systems have not been used broadly in Korea's building approval system (Seumter). In this research, four challenges were drawn from a focus group interview. Focusing on tackling one challenge, this paper reviewed previous research into building approval systems and the building approval systems of Singapore, the U.K. and the U.S., and identified elements of the building approval application process and presents a system to create and manage the information. The system supports the creation and management of information and 2D drawings from an IFC-based BIM model. We expect that the system will encourage designers to use BIM from the beginning of the design process and ultimately increase the efficiency of design in a BIM-based project.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.296-299
/
2002
Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.
Korean Journal of Computational Design and Engineering
/
v.21
no.3
/
pp.242-251
/
2016
Around the world, BIM application has been mandated. In Korea, an announcement was made in 2016 that BIM application will be required for all public constructions ordered by the Public Procurement Service. However, BIM cannot be used for building permits as Seumter, a building permit system, doesn't support BIM, even if it was used for building design. To utilize BIM for permit application, this study introduces a method of management for BIM-used permit application information. It was done by analyzing the data entered for new building permit application in Seumter. For the analysis, the permit application information is classified as internal BIM information and external BIM information and the required information is defined. To easily create and utilize the data types at the design stage, this study introduces a method of creating and utilizing a permit template. Also, this study developed a tool for combining the area information to add up all the related information such as gross floor area and floor area ratio. This study is significant in that it analyzes the required information for new building permit application among all the permit application types in Korea.
Journal of the Korean Institute of Educational Facilities
/
v.18
no.5
/
pp.43-50
/
2011
There are emerging issues to update the educational environment for schools in terms of information and communication technology in order to provide customized programs to students as well as all participants relating to learning and teaching. The past year has been turbulent as the education facilities has changed and new procurement processes such as BTL have emerged. In this study, the feasibility analysis of ICT for the public educational environment is to analyse the current primary schools by means of collecting parent's opinion. In the web-site questionnaires, it was designed with 70 items such as teaching method, class organization, aptitude drill and educational community. As results, the statistical analysis is to propose the list of priority and orientation covering social agenda in the issue of ICT for education, the benefits schools can achieve by smart environment is to have the advanced learning services and solutions that represents parental engagement with identical local aims of interactive interface between their students and qualified teachers at a school. Both the national curriculum as well as the after-school program initiatives from the ministry of education, science and technology may reduce negative effects of private education so that the program has to be carefully developed for balanced education society revitalizing mutual communication within regional learning participants such as students, teachers and educational experts.
The purpose of this study is to present an evaluation model to measure the clarification level of stakeholder requirements of public sector software projects in the Republic of Korea. We tried to grasp the quality of proposal request through evaluation model. It also examines the impact of the level of stakeholder requirements on the level of system requirements. To do this, we analyzed existing research models and related standards related to business requirements and stakeholder requirements, and constructed evaluation models for the system operation concept documents in the ISO/IEC/IEEE 29148. The system operation concept document is a document prepared by organizing the requirements of stakeholders in the organization and sharing the intention of the organization. The evaluation model proposed in this study focuses on evaluating whether the contents related to the system operation concept are faithfully written in the request for proposal. The evaluation items consisted of three items: 'organization status', 'desired changes', and 'operational constraints'. The sample extracted 217 RFPs in the national procurement system. As a result of the analysis, the evaluation model proved to be valid and the internal consistency was maintained. The level of system operation concept was very low, and it was also found to affect the quality of system requirements. It is more important to clearly write stakeholders' requirements than the functional requirements. we propose a news classification methods for sentiment analysis that is effective for bankruptcy prediction model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.