건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

CM 전문회사 단장 활용실태 및 개선방안 (Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures)

  • 손창백;허영기;이동은
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.87-95
    • /
    • 2013
  • 국내 CM시장이 활성화됨에 따라 경쟁이 심화되어 실제 프로젝트 관리를 담당하는 CM단장의 능력은 CM사업 수주를 위한 중요한 요소가 되었다. 이로 인해 각 CM전문회사는 유능한 CM단장의 확보를 위해 현재 담당 프로젝트가 없더라도 후속 프로젝트의 수주를 위해 CM단장을 일정수 대기상태로 확보하고 있으나, 효율적인 활용방안에 대해서는 체계적인 방법이 마련되지 못한 실정이다. 이에 본 연구는 현재 CM전문회사가 보유하고 있는 대기상태 CM단장들의 활용실태 및 문제점을 분석하고, CM단장의 효율적인 활용을 위한 개선방안을 모색하기 위한 실무적 기초자료를 제시하고자 하였다. 본 연구결과, CM전문회사의 현재 대기상태 CM단장 인력수는 적정 비율 및 인력수에 비해 약 2배 정도 많은 것으로 나타났고, CM단장의 선정기준으로 프로젝트의 수주를 위해 프레젠테이션 능력을 가장 중요한 요소로 고려하고 있었다. 그리고 대기상태 CM단장의 보유 및 활용상 문제점은 크게 고용비용 증가와 현장 및 본사 업무지원능력 부족 및 제한적 활용으로 요약되었고, 대기상태 CM단장의 효율적인 활용을 위한 현장 및 본사 기술지원과 수주능력 강화 및 제도개선 등에 관한 개선방안을 제안하였다.

도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰 (A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects)

  • 문명렬;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF

External Factors Influencing Bid/No-Bid Decision for Supervision Consultant Service: A Case of Construction Project in Hanoi

  • HA, Son Tung;TRAN, Manh Linh;HOANG, Huy Viet;TRAN, Van Hung
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권6호
    • /
    • pp.417-425
    • /
    • 2020
  • This paper investigates the potential impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the capital of Vietnam. The data used in this study are secondary data taken from annual reports and sourced from the Department of Public Procurement, Ministry of Planning and Investment in Hanoi. Besides, to identify the impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the study collected data from 272 qualified questionnaires from bidders doing business in Hanoi. Cronbach's Alpha, EFA and regression model are used to explore the impact of each independent variable on bid/no-bid decision for supervision consultant service on construction project. The results show that three external determinants, including Project characteristic (PC), Legal codes (LC) and Competition (C) are affecting bid/no-bid decision for supervision consultant service on construction project in Hanoi. Among them, Project characteristic (PC) and Legal codes (LC) have positive relationships with bid/no-bid decision for supervision consultant service on construction project, whereas Competition (C) negatively affects bid/no-bid decision for supervision consultant service on construction project. It means the more contractors actually participate in a bid, the less bid/ no-bid decisions are made.

미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점 (U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication)

  • 장철기
    • 한국콘텐츠학회논문지
    • /
    • 제20권2호
    • /
    • pp.215-225
    • /
    • 2020
  • 국내 공공건설사업에서 건설기술용역 발주 및 입·낙찰 과정은 공정성과 투명성이 강조되어 계량적 항목 위주로 업체를 선정하는 방법을 주로 적용하여왔다. 이로 인해 업체의 기술경쟁력을 강화하고자 하는 동기부여가 미흡하였고, 기술력을 기반으로 하는 업체선정방식의 필요성은 지속적으로 제기되어 왔다. 본 연구에서는 미국 공공건설사업에서의 건설기술용역 서비스 발주 및 입·낙찰 관련 미국 정부의 방침, 제반 절차 및 규정 등을 관련법 및 관련시스템을 통해 분석하고, 국내 공공건설공사에서의 건설기술용역 발주 및 입·낙찰 및 나아가 계약관리 및 사후관리에 있어서 공정하고 효율적인 건설기술용역 관리에 시사 하는 바를 도출하였다. 주요 시사점으로는 자격요건 및 역량 기반의 업체 선정, 제출 서류의 단순화, 발주자의 역할 및 책임 강조, 중소업체에 대한 배려, 탈락자에 대한 배려, 사후평가 등의 측면에서 국내 건설기술용역 발주 및 입·낙찰에 고려될 수 있을 것으로 기대된다.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

지자체 공공건설사업의 발주방식 선정기준에 관한 연구 (AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments)

  • 최은아;김병옥;이상범
    • 한국건축시공학회지
    • /
    • 제9권5호
    • /
    • pp.111-117
    • /
    • 2009
  • 건설공사는 복잡화, 다양화, 대형화 되고 있으며 이러한 다변화된 건설 환경에 대응하기 위해 건설 선진국에서는 다양한 발주방식을 도입 적용해 오고 있다. 국내에서도 지속적으로 발주제도를 개선해 오고 있으며, 최근에는 공공건설공사의 발주방식을 보다 다양화하려는 취지에서 국가계약법시행령 개정을 통해 "기술제안입찰", "설계공모 기술제안입찰"을 새로 도입하였다. 이러한 정부의 노력에 부합되도록 공공공사에 적절한 발주방식선정기준이 제시되어야 한다. 이에 본 연구에서는 기 발주된 건설 공사 실태 및 현황분석을 설문조사를 통하여 문제점을 정리하였고, 이 문제점에 대한 개선방안으로 사업유형별 발주방식 선정기준을 제시하였다.

CASE STUDY OF THE NATIONAL STADIUM: RISKS AND OPPORTUNITIES IN CHINA'S PPP IMPLEMENTATIONS IN MAJOR SPORTS FACILITIES

  • Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.474-479
    • /
    • 2011
  • With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.

  • PDF

공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 - (A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project -)

  • 심구식;김성만;안재홍
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

건설산업에서 프로젝트관리오피스(PMO)와 프로젝트성과의 영향관계 분석: PM리더십 조절효과 중심으로 (Analyzing the Influential Relationship between PMO and Project Performance in Construction Industry: Focusing on Moderation Effect of PM Leadership)

  • 이헌창;박소현;김승철
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.133-145
    • /
    • 2021
  • Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.