• 제목/요약/키워드: public Construction client

검색결과 43건 처리시간 0.028초

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

발주자 입장에서 바라본 혁신적인 관급공사 관리 프로세스 제시를 위한 기초 연구 (An Innovative Public Project Process Management For the Government Owner)

  • 김성원;김대영
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.557-562
    • /
    • 2008
  • 우리 건설산업은 2000년 이후 공공부문의 발주액이 꾸준히 증가하고 있다. 하지만 현재 국내 공공사업에서의 비용, 일정 그리고 품질관리는 일반적으로 결과 중심적인 관리행태에 의존하고 있음과 공사 중 투명한 관리가 이루어지지 못하고 있음으로 인하여, 비용과 일정의 증가, 부실시공, 문제점의 조기발견과 대책수립의 어려움, 그리고 시공자, 감독자, 설계자 사이의 책임소재 불명확 등의 문제를 야기하고 있는 것으로 인식되고 있다. 따라서 본 연구에서는 공공부문 관급공사의 발주자조직을 대상으로 현 관급공사의 발주자의 관리실태를 파악 및 분석하여 그 문제점 및 관리의 한계를 도출하고자 한다. 또한 도출된 문제점과 한계를 보완 또는 개선할 수 있는 모델을 발주자 조직에 제시하여 보다 나은 발주자의 효율적이고 실질적인 프로젝트관리업무 향상에 기여하고자 한다.

  • PDF

지방자치단체 CM사업 특징 분석에 관한 연구 : CM사업 채택 동기를 중심으로 (Characteristics of CM Projects in Local Government Client's motivation in selecting the CM procurement route)

  • 송연주;김한수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.433-436
    • /
    • 2004
  • 국내 건설산업에서 건설사업관리(CM)의 활성화 논의가 활발하게 진행되고 있는 가운데 최근 민간 및 공공부문에서 CM사업이 점차 증가하고 있는 추세이다. 공공부문의 CM사업은 강제사항이 아닌 임의사항인데도 불구하고 증가 추세를 보이고 있다는 것은 주목할 만한 특징이다. 공공부문 중 특히 지방자치단체 CM사업이 중앙정부에 비해 활발하게 발주되고 있으며, 본 연구의 목적은 최근 7년간 발주된 지자체 CM사례를 채택 동기의 관점에서 분석하여 주요 특징과 시사점을 도출하는 것이다. 지자체 사례를 중심으로 CM채택 동기에 대한 분석을 통해 특징과 시사점을 도출하는 것은 공공 발주자 CM수요의 특징을 이해하고 공공부문에서 CM활성화의 방향성을 모색한다는 측면에서 중요한 의의를 지닌다.

  • PDF

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

개선된 Identity 기반의 브로드캐스트 암호화 기법 (Improved Identity-Based Broadcast Encryption)

  • 김기탁;박종환;이동훈
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2008년도 정보통신설비 학술대회
    • /
    • pp.347-349
    • /
    • 2008
  • The primitive of Identity-Based Broadcast Encryption allows a sender to distribute session keys or messages for a dynamically changing set of receivers using the receiver's identity as a public key. We already know that the trade-off exists the efficiency between the public parameter size and the ciphertext size. So, if the ciphertext size is O(1), then the public parameter size may be O(n). Some of IBBE scheme take the public parameters as input in decryption phase. Thus, a decryption device (or client) has to store the public parameters or receive it. This means that a decryption device (or client) has to have the proper size storage. Recently, delerabl$\square$e proposed an IBBE which have the O(1) size ciphertexts and the O(n) size public parameters. In this paper, we present an IBBE scheme. In our construction the ciphertext size and the public parameter size are sub-linear in the total number of receivers, and the private key size is constant.

  • PDF

핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구 (Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors)

  • 박희대;한승헌;김성수
    • 대한토목학회논문집
    • /
    • 제29권3D호
    • /
    • pp.399-408
    • /
    • 2009
  • 우리나라 건설사업은 점차 대형화되고 복잡화되는 가운데 예산 및 원가절감에 대한 압박도 점차 높아지고 있다. 이러한 가운데 정부와 공공발주기관들은 경제성 및 품질 향상에 부응하기 위한 발주자 주도의 원가관리기법인 '설계VE(Value Engineering)'을 도입하기 위해 노력해왔다. 국토해양부는 2000년 3월 건설기술관리법시행령을 통해 총공사비 500억원 이상의 1종 시설물 공사에 대하여 설계VE를 의무화하였고 2006년 1월부터는 총공사비 100억원 이상 공사로 그 대상을 확대하였다. 또한 정부는 '경영혁신기본법'과 '공공기관운영에관한법률' 제정을 통해 공공발주기관의 경영혁신 필요성을 제고하고 있어 설계VE의 도입 필요성은 더욱 증가하고 있다. 이에 본 연구는 공공발주기관의 설계VE 성공과 매우 밀접한 7개 부문 총 19개의 핵심성공요인(Critical Success Factors, CSFs)을 도출하고, 10개의 주요기능을 도출한 후 프로세스 모델링기법을 활용하여 공공발주기관의 개선된 설계VE 프로세스를 제시하였다. 연구에서 제시된 프로세스는 공공발주기관인 G사의 사례 연구를 통해 그 효과를 확인하였다. 본 연구결과는 설계VE를 이미 시행하고 있거나 새로 도입하고자 하는 정부, 지방자치단체 및 기타 공기업들이 보다 효과적인 설계VE 프로세스를 도입하는데 활용될 수 있을 것으로 기대된다.

공공 발주자 혁신프로그램 전략 및 성과 분석 - 미국 GSA Construction Excellence 프로그램을 중심으로 - (Innovation and Achievements in Public Construction Clients - Lessons Learned from GSA Construction Excellence Program -)

  • 김한수;정희옥
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.394-397
    • /
    • 2003
  • 현재 한국 건설산업은 미래지향적인 혁신을 필요로 하고 있다. 건설산업의 혁신과 효율성 및 생산성 향상을 모색하기 위한 다양한 주제 중 본 연구에서는 발주자 혁신 노력에 초점을 두고 있다. 그 주된 이유는 건설생산의 효율성과 생산성은 궁극적으로 발주자치 역량과 효율성에 의해 결정되기 때문이다. 본 연구는 미국 GSA(General Services Administration)의 Construction Excellence 프로그램을 추진 배경, 추진 전략 및 성과 등의 관점에서 분석하고 이 혁신 프로그램이 주고 있는 교훈과 시사점을 발굴하고자하는 목적으로 수행되었으며 공공 발주자의 자각, 민간주체와의 파트너십, Best Practice 발굴 및 실천, 성과측정 등이 주요 키워드로 분석되었다.

  • PDF

발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석 (BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client)

  • 함남혁;김웅기;김재준
    • 한국BIM학회 논문집
    • /
    • 제10권3호
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

공공건축물의 초기공사비 산정방법 연구 (Cost Estimating method for the Public Office building at the early stage)

  • 구원용;김정곤;이준석;박형근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.261-266
    • /
    • 2007
  • 이 연구는 프로젝트 기획단계에서 발주자가 실적자료를 활용해 공공건축물인 관공서의 총공사비를 견적하는 방법에 대한 것이다. 최근 공공건축물의 종류 및 용도가 다양화 되면서, 공사비 산정 시 고려해야할 요소가 증가하여 공사비 추정에 대한 논리적인 분석이 어려운 경우가 많다. 이로 인해 경우에 따라서는 건축물이 과다 또는 부실하게 계획되는 사례가 발생하고 있어 예산이 낭비되기 쉽다. 특히, 학교, 관공서, 체육시설 등의 공공건축공사에 BTL(Build Transfer Lease)방식이 도입되어 활성화되면서 건축물의 기획 단계부터 적정규모 산정 및 공사비에 대한 체계적 예측 및 관리가 필요하며, 효과적인 건축물의 기획을 위해서는 장기적인 건축물의 이용자 및 건축물의 수명주기(Life cycle)를 예측한후 건축물의 규모를 산정하는 것이 바람직하다. 그러나 현실적으로 모든 변수들을 종합한 결과를 토대로 건축물을 기획하는 것은 용이한 일이 아니다. 따라서 본 연구에서는 발주자가 건축물의 기획 단계에서 공공건축물의 예산 수립을 쉽게 검토할 수 있는 방법론을 제공하고, 과거에 수행된 유사한 용도의 건축물 실적자료를 활용해, 총공사비를 견적할 수 있는 회귀분석모델을 제안하고 모델의 적용성검토를 위해 일본의 관공서 건축데이터를 통해서 검증하였다.

  • PDF