• Title/Summary/Keyword: property FMC

Search Result 4, Processing Time 0.019 seconds

Mixed $H_2/H_{\infty}$ Finite Memory Controls for Output Feedback Controls of Discrete-time State-Space Systems

  • Ahn, Choon-Ki;Han, Soo-Hee;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.529-534
    • /
    • 2005
  • In this paper, a new type of output feedback control, called a $H_2/H_{\infty}$ fnite memory control (FMC), is proposed for deterministic state space systems. Constraints such as linearity, unbiasedness property, and finite memory structure with respect to an input and an output are required in advance to design $H_2/H_{\infty}$ FMC in addition to the performance criteria in both $H_2$ and $H_{\infty}$ sense. It is shown that $H_2$, $H_{\infty}$, and mixed $H_2/H_{\infty}$ FMC design problems can be converted into convex programming problems written in terms of linear matrix inequalities (LMIs) with some linear equality constraints. Through simulation study, it is illustrated that the proposed $H_2/H_{\infty}$ FMC is more robust against uncertainties and faster in convergence than the existing $H_2/H_{\infty}$ output feedback control schemes.

  • PDF

hierarchical Control and Intelligent Scheduling of Flexible Manufacturing Cell (유연 생산셀의 계층적 제어와 지능형 스케쥴)

  • 서기성;이노성;안인석;박승규;우광방
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.3
    • /
    • pp.492-503
    • /
    • 1994
  • In this study, the control and scheduling of the flexible manufacturing cell (FMC) is discussed, which can perform the mixed production and relieve the effect of machine failure. The control of the FMC isvery complex task due to the property of multiple jobs and the dynamically changing states. For effective control of proposed FMC, the hierarchical scheme is introduced and the functions of each levels are defined. Especially for the control functions of shop floor level and cell level, the intelligent scheduler is implemented. To show the efficiency of the intelligent scheduler, the production method fo the existing assembly lines was evaluated and compared with the proposed intelligent FMC method. The results from the production performance show that the proposed method is superior to the existing method in various performance indices.

An expert system for intelligent scheduling in flexible manufacturing cell (유연생산셀의 지능형 스케쥴링을 위한 전문가 시스템)

  • 전병선;박승규;이노성;안인석;서기성;이동헌;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.1111-1116
    • /
    • 1993
  • In this study, we discuss the design of the expert system for the scheduling of the FMC(Flexible Manufacturing Cell) consisting of the several versatile machines. Due to the NP property, the scheduling problem of several machine FMC is very complex task. Thus we proposed the two heuritstic shceduling algorithms for solving the problem and constituted the algorithm based of solving the problem and constituted the algorithm base of ISS(Intelligent Scheduling System) using them. By the rules in the rule base, the best alternative among various algorithms in algorithm base is selected and applied in controlling the FMC. To show the efficiency of ISS, the scheduling output of ISS and the existent dynamic dispatching rule were tested and compared. The results indicate that the ISS is superior to the existent dynamic dispatching rules in various performance indexes.

  • PDF

MAXIMAL CHAIN OF IDEALS AND n-MAXIMAL IDEAL

  • Hemin A. Ahmad;Parween A. Hummadi
    • Communications of the Korean Mathematical Society
    • /
    • v.38 no.2
    • /
    • pp.331-340
    • /
    • 2023
  • In this paper, the concept of a maximal chain of ideals is introduced. Some properties of such chains are studied. We introduce some other concepts related to a maximal chain of ideals such as the n-maximal ideal, the maximal dimension of a ring S (M. dim(S)), the maximal depth of an ideal K of S (M.d(K)) and maximal height of an ideal K(M.d(K)).