• 제목/요약/키워드: project-based work

검색결과 838건 처리시간 0.032초

재해분석을 통한 농업토목공사의 공종별 위험성 평가 (Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process)

  • 양영진;오수훈;노재경
    • 한국농공학회논문집
    • /
    • 제60권4호
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

교대제 개선 시범사업이 간호사의 교대근무 적응, 일과 삶의 균형 및 이직의도에 미치는 효과: 혼합연구방법 (The Effects of a Shift Improvement Pilot Project on Nurses' Shift Adjustment, Work-Life Balance, and Turnover Intention: A Mixed-Methods Study)

  • 최수정;김미순;전미경;최진주;손숙연;김은혜
    • 임상간호연구
    • /
    • 제29권3호
    • /
    • pp.223-237
    • /
    • 2023
  • Purpose: This study aimed to investigate the impact of a nurse shift improvement pilot project on nurses' shift adjustment, work-life balance, and turnover intention, as well as nurses' experiences of participating in the pilot project. Methods: An explanatory sequential mixed-methods study was performed. Survey data was collected from a total of 1,051 nurses both in participant and non-participant groups. For the qualitative study, focus group interviews were conducted with 22 nurses who participated in the shift improvement pilot, including 12 staff nurses, 7 nurse managers, and 3 substitute nurses. Results: There were significant positive effects on the key variables of nurses' shift adjustment, work-life balance, and turnover intention in the group that participated in the nurse shift improvement pilot project. Based on the qualitative study, participants in the shift improvement pilot project indicated that it enabled nurses to recover their circadian rhythm, and achieve a better work-life balance, and they wanted to continue working as a nurse, and hoped expanded application of the pilot project. Conclusion: In order for expanded implementation of the pilot project and continued improvement in the shift system, we recommend establishing compensation standard, systematizing the use of substitute nurses, developing guidelines for shift schedules, and expanding the shift improvement pilot project to other departments such as the emergency room.

단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발 (The Development of a Schedule Management Support System Using Productivity Information of Construction Activities)

  • 오세욱;박상규;김영석
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.181-192
    • /
    • 2005
  • 건설 프로젝트의 단위작업을 기반으로 발생되는 노무자의 작업시간은 진행된 실적물량 정보와 연계되어 생산성 정보로 가공되고 이는 다시 해당 단위작업의 공정관리와 연계됨으로써 프로젝트의 계획 대비 실적을 비교 및 분석할 수 있는 근거자료로 활용 될 수 있다. 또한 이러한 작업정보(노무자의 작업시간 및 실적물량 정보)는 잔여 작업 일정에 대한 예측 및 작업조 운영계획 조정 등 공정관리와 관련된 다양한 원천데이터로 제공될 수 있으며, 실적자료로 축적되어 향후 유사 프로젝트의 공사계획 수립에 유용하게 재활용될 수 있다. 본 연구의 목적은 PDA, 바코드, 웹 기술 등을 활용하여 단위작업을 기반으로 발생되는 작업정보를 효과적으로 수집하고 이를 생산성 정보로 가공하여 공정 및 공사관리 업무를 지원하는 전산화 시스템을 개발하는 것이다. 개발 시스템을 통해 분석 및 축적된 생산성 정보는 단위작업의 공정과 연계되어 잔여작업 일정 예측 및 작업조 조정 등 다양한 공정 지원데이터를 제공할 수 있으며 지식관리 차원에서 향후 유사 프로젝트의 공정계획 수립시 매우 유용한 참고자료로 활용될 수 있을 것으로 기대된다.

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

건설사업관리자의 역량기반 경력관리체계 구축 방안 (Competency-Based Career Management System Plan for Construction Manager)

  • 정서영;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF

농작업 대행사업 경제성 분석 - 나주시 봉황면 사례를 중심으로 - (An Economic Feasibility Analysis of Custom Work Service - Case of Bonghwang-myeon, Naju City -)

  • 이정민;신승엽
    • 농촌지도와개발
    • /
    • 제28권4호
    • /
    • pp.167-174
    • /
    • 2021
  • This study analyzed the feasibility of custom work service to deal with the imbalance of farm labor supply due to population aging. The economic feasibility analysis is based on the case of Bonghwang-myeon in Naju-si, where the majority of farm work is entrusted to local agricultural cooperative. To assess the project profitability and economic feasibility based on the projected cash flow for the next ten years, Return On Investment (ROI), Net Present Value (NPV), and Internal Rate of Return (IRR) of the projects were calculated. The results showed that ROI is estimated at 13.7%, and NPV and IRR are KRW 1,504,932,000 and 15.6%, respectively, with a discount rate of 4.5%, indicating a good enough profitability. Furthermore, a sensitivity analysis with government support as part of an assumption showed that without the support, NPV turns negative, implying that the project is not profitable, and that government support for at least 30% of the cost is needed to secure the economic feasibility of a project. Hence, to promote agricultural work entrustment, it is necessary for the government to partly support the agricultural machinery and facility costs, which require a considerable amount of initial investment.

ESG-oriented Governance Work System for Smart Highway Implementation

  • Bong-Shik, Yun;So-Wol, Yoo
    • 스마트미디어저널
    • /
    • 제11권10호
    • /
    • pp.36-45
    • /
    • 2022
  • This study was promoted to prepare an ESG-oriented work system for Korea Expressway Corporation through sustainable highway construction, IOT-based smart highway preparation, and establishment of a broad convergence business governance system between multiple ministries and implementing entities. Based on the 2nd Basic Plan for Landscape Policy (2020~2024) and the Public Design Promotion Act (2018~2022), the study was conducted through the improvement of the highway design method to be applied for four years from 2021 to 2024, the changes in construction and social conditions related to expressways, the analysis of policies and plans to secure consistency with the 'Korean New Deal', and the analysis of the project performance and work promotion system that the Korea Expressway Corporation's business execution organization has promoted together with each government department. The results of this research are expected to help the Korea Expressway Corporation establish the 21st Innovation Plan for the phased construction of a "100-years landscape with people" and the preparation of a sustainable future highway environment creation project for the lives and safety of the people.

e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발 (A Qualitative Approach to eIT Project Management)

  • 정기호
    • 한국IT서비스학회지
    • /
    • 제1권1호
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.