Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1318-1323
/
2009
In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.
Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.808-813
/
2005
Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.
The 1th International Conference on Construction Engineering and Project Management
/
pp.849-854
/
2005
After participation in the Colombo Plan in 1954, Japan has provided Official Development Assistance (ODA) to 185 countries and areas, and the accumulated amount of Japan's ODA is approximately US$ 221 billion for 50 years. Japan is the second largest ODA donor country in the world now. The country is contributing to the peace and development of the international community. However, the recipient government and the parties concerned are not always satisfied with the Japan's ODA system.. Especially the grant aid system is strongly based on the domestic public work system. This paper analyzes the problems and figures out solutions from the viewpoint of donor and the participant.
Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.
공공공사의 입찰 방식 결정은 공무수행담당자의 경험 및 업무의 편의성 등을 고려하여 결정되고 있는데, 입찰을 위한 방식 결정 과정의 타당성 검증은 이루어지지 못하고 있는 실정이다. 입찰방식의 선정에 있어 또다른 도전과제는 경험위주의 의사결정을 근간으로 하고 있어 새로운 형태의 프로젝트 발주 또는 새로운 형태의 입찰방식 적용 시 그것에 대한 객관적 타당성을 마련할 방법이 쉽지 않다는 점이 있다. 따라서 본 연구는 공공공사 프로젝트 발주 방식 선정에 도움을 줄 수 있는 의사결정모델을 개발하고 이의 활용성을 검토하고자 한다. 본 연구는 계층분석적의사결정기법을 이용하여 모델을 개발하였고 실제 업무 수행 담당자 32명을 통해 검증하였다. 모델 활용결과 32명 중 5명의 모델활용에 일관성이 있었으며, 담당자들은 모델에 전적으로 의존할 수 없다는 사실을 인지하면서도 가이드를 제시해줄 수 있다는 점에서 긍정적 의견을 제시하였다. 이를 통해 본 연구에서 제시한 모델이 향후 새로운 형태의 입찰방식 또는 과제 발생 시 관련 업무 수행자의 업무관련 부담을 줄여주고 객관적인 공무수행에 도움을 줄 수 있을 것으로 기대된다.
2000년대 후반 들어 플랜트산업은 초유의 호황기를 누리고 있으나, 시장 확대에 따라 사업주의 품질, 기술요구가 점차 강화되고 있어 이러한 국내 플랜트 산업이 대외경쟁력을 구비하고 지속적으로 성장 가능한 산업으로 거듭나기 위해서는 우수한 설계능력의 확보를 통한 고부가가치 기술집약산업으로 변화가 요구되고 있다. 이를 위해서 우수설계를 위한 체크리스트의 도출과 그 측정이 가능하도록 하는 객관적인 사례평가모델의 개발이 필수적이다. 본 연구에서는 플랜트사업의 설계사례의 체크리스트기반 평가모델 개발을 위해 우선 국내외 플랜트 EPC 산업현황과 체크리스트 관련 선행연구에 대한 문헌고찰을 수행하였다. 이를 기반으로 전문가 설문을 통해 각 설계분야의 업무항목별 중요도와 업무별 체크리스트 항목의 중요도를 도출하여 체크리스트 평가에 따른 정량적 평가모델을 개발하였다. 또한 개발된 모델의 사례평가의 적용성 검토를 위해 플랜트 설계사례를 정량적으로 평가하고 분석하였다. 현재 국내에서는 우수사례의 도입 초기 단계로 본 연구에서 개발된 건설사업 단계별 업무 체크리스트를 향후 산업계와 학계, 연구계의 상호 협동을 통해 지속적인 연구와 적용을 통해 발전시켜 나간다면 국내 EPC업체의 우수설계능력 확보에 기여할 것으로 기대된다.
본 연구는 범용 프로젝트 관리 및 운영을 위해 범용 프로젝트 관리 전산시스템에 적용할 수 있는 초기 전산관리용 데이터베이스를 구축하였다. 본 연구에서 제시한 데이터베이스 구축 모형은 시설요소, 구조요소, 공사요소, 자원요소의 조직정보분류체계를 근거로 2교대 3경간의 교량공사를 조직분류체계, 활동, 자원별 활동의 계층으로 표현하여 구축하였다. 본 연구에서 구축된 데이터베이스 모형은 향후 범용 프로젝트 관리 및 운영을 위해서 매우 체계적이고 과학적인 관리로 활용할 수 있을 것으로 사료된다.
The 3th International Conference on Construction Engineering and Project Management
/
pp.628-634
/
2009
It is a common practice in Hong Kong for the main contractors of local building projects to sublet most of the work to subcontractors. Consequently their roles have gradually transformed from a constructor to a manager of subcontractors. The outcomes of a project therefore depend heavily on the subcontractors' performance. However, most of the subcontractors complain that they are unable to efficiently and effectively operate due to site coordination problems, such as inaccurate site reference lines, caused by main contractors. The site problems may consume significant amounts of resources if practical solutions cannot be agreed by the project participants early enough. Rahim Organizational Conflict Inventory-II (ROCI-II) model was developed by M.A. Rahim that measure five types of conflict management style including Integrating, Obliging, Dominating, Avoiding and Compromising. This paper presents the questionnaire survey based on the ROCI-II model to rank the preference on the conflict management style adopted by the project representatives of the subcontractors in handling the site coordination problems and its impact to the time used to agree the solutions to the different types of site coordination problems with main contractor. The survey results show that most of the subcontractors' project representatives preferred to adopt the Compromising style to tackle the site coordination problems and the time used to agree the solutions with main contractor was influenced by the conflict management style adopted.
건설 공사의 궁극적인 목표는 주어진 공사를 요구된 공사기간내에 설계도서에 명시된 품질 기준을 만족시키면서 가장 경제적이고 안전하게 완성하는데 있다. 마감공사는 공종이 세분화되어 매우 다양하고 복잡한 구조를 가지고 있으며 적정 투입 시점에 대한 세부 공종별 기준이 없고, 선후행 작업간의 우선 순위의 정립의 필요성이 약한 것이 특징이다. 본 연구는 마감공사 작업지연을 최소화하기 위하여 마감공사 세부 공종별 작업지연 우선 순위를 선정하여 소요 공기에 맞추어 프로젝트를 완료할 수 있는 정보를 제공하는 것이 목적이다. 본 연구에서 마감공사를 습식공사와 기타 마감공사로 나누어 각 공종별 내역을 기반으로 중요도를 분류하고, 설문을 통해 설계자, 시공자, 협력업체의 작업지연 요인을 분석하여 최종 작업지연 우선 순위를 선정하여 계획 공사기간 내에 공동주택 프로젝트를 완료할 수 있는 정보를 제공하는데 목적이 있다.
최근 국내 대기업들은 세분화된 팀조직을 그룹조직으로 확대 운영함으로서 프로젝트업무의 유동성과 조직 인력활용의 유연성을 가져왔지만 프로젝트를 추진함에 있어 의사소통체계가 복잡해지게 되는 문제가 발생하게 되었다. 대부분 대기업들이 사용하는 전사적 자원관리시스템은 정보배포에 초점을 맞추고 있어 그룹 내 프로젝트관리 의사소통의 문제를 효율적으로 해결하지 못하고 있는 것으로 조사되었다. 본 연구에서는 국내 제조건설 분야 대기업에 적용할 수 있는 그룹프로젝트관리 지원을 위한 웹 기반 정보보고시스템(WIRS : Webbased Information Reporting System)을 설계하고 프로토타입을 구현하였다. WIRS 구현을 통해 대규모 프로젝트의 시작에서부터 종료까지 소그룹 내 신속하고 원활한 의사소통 지원이 가능하게 되었고 전사적자원관리시스템의 커뮤니케이션 역량을 보완할 수 있게 된 데에 본 연구의 의의가 있다. 구체적으로 WIRS의 기능 설정하기 위해 현장 요구조사를 실시하였고 조사 결과를 바탕으로 데이터베이스를 설계하고 WIRS 프로세스 모델 설정을 위한 분석 및 기획을 수행하였다. 결과물에 대한 사용자 피드백은 대체로 긍정적이었으며, 특히 프로젝트 진행 관련 웹상에서 보고가 이루어진다는 점, 일일메모를 통하여 주간 보고서와 월간보고서가 자동적으로 생성된다는 점, 지시생성 및 일정정보공유기능 등을 긍정적으로 평가되었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.