• 제목/요약/키워드: project participants

검색결과 679건 처리시간 0.03초

Key success factors for implementing modular integrated construction projects - A literature mining approach

  • Wuni, Ibrahim Yahaya;Shen, Geoffrey Qiping
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.343-352
    • /
    • 2020
  • Modular integrated construction (MiC) is an innovative construction method where components of a building are manufactured in an offsite factory, trucked to the job site in sections, set in place with cranes, and assembled together to form a whole building. Where circumstances merit, favorable conditions exist and implemented effectively; MiC improves project performance. However, several key factors need to converge during implementation to realize the full benefits of MiC. Thus, a thorough understanding of the factors which are critical to the success of MiC projects is imperative. Drawing on a systematic review of 47 empirical studies, this research identified 25 key success factors (KSFs) for MiC projects. Of these, the five topmost cited KSFs for MiC projects include effective working collaboration and communication among project participants; standardization, optimization, automation and benchmarking of best practices; effective supply chain management; early design freeze and completion; and efficient procurement method and contracting. The study further proposed a conceptual model of the KSFs, highlighting the interdependences of people, processes, and technology-related KSFs for the effective accomplishment of MiC projects. The set of KSFs is practically relevant as they constitute a checklist of items for management to address and deal with during the planning and execution of MiC projects. They also provide a useful basis for future empirical studies tailored towards measuring the performance and success of MiC projects. MiC project participants and stakeholders will find this research useful in reducing failure risks and achieving more desired performance outcomes. One potential impact of the study is that it may inform, guide, and improve the successful implementation of MiC projects in the construction industry. However, the rigor of the analysis and relative importance ranking of the KSFs were limited due to the absence of data.

  • PDF

신제도주의 관점에서의 한국 상향식 농촌지역개발사업 분석 (Analysis of the Bottom-up Rural Development Project viewed from the New Institutionalism in Korea)

  • 김정태;유병욱
    • 농촌계획
    • /
    • 제21권3호
    • /
    • pp.67-84
    • /
    • 2015
  • Although the bottom-up rural area development project was conceived with great expectations, the general evaluation of the project so far reveals that it does not significantly differ from projects carried out in a top-down manner. This paper examines the nature of the bottom-up rural area development project with a focus on its background, including the roles of authority and project participants. Results revealed that the project was designed to be implemented in line with the state affairs ideology of the leader in a negative position of bureaucratic society. Though the form of implementation for the project seemed bottom-up as seen in the process of the roles and authorities in supporting organizations the top-down method of implementation can be seen in the authorities and roles of the central government. It was also noticed that the private sector, designed to elicit participation of various experts, looked to be managed and controlled by public organizations. The abovementioned signifies that the Korea rural area development project has been implemented not in a bottom-up manner but rather in an ever-strong top-down manner, which means that the central government holds more responsibility for the project's results, evaluation, and discussions. Furthermore, as seen in the background of the project, policies have been implemented in a top-down manner without the confidence of the bureaucratic society. Therefore, in order to implement a proper bottom-up rural area development project, there is a need for the bureaucratic society to have confidence in the rural societies.

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 - (A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project -)

  • 심구식;김성만;안재홍
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권3호
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

플랜트 엔지니어링 프로젝트의 공급망관리 : 개념과 이슈 (Concept and Issues in Supply Chain Management for Plant Engineering Project)

  • 정흥교;박성택;김태웅
    • 디지털융복합연구
    • /
    • 제10권9호
    • /
    • pp.213-224
    • /
    • 2012
  • 프로젝트 기반의 공급망관리는 입찰 및 수주, 협력업체의 선정, 계약체결부터 시작하여 프로젝트 진행을 위한 협력업체와의 지속적 통합 등 다양한 활동이 포함된다. 본 연구는 최근 플랜트 엔지니어링 산업에 확산되고 있으나 심도깊은 연구와 분석이 미진한 공급망관리의 개념과 주요 이슈에 대한 논의를 담고 있다. 프로젝트 공급망관리의 도입과 운영을 위해 필요한 전제조건으로 기술적 인프라, 사회적 인프라 그리고 공급망 참여기업들을 연결시키는 정보시스템 등을 제시하고, 각 영역별로 관련 선행연구들의 주요 결과와 앞으로 연구가 필요한 이슈에 대해 논의한다.

Critical Success Factors of Large Design-Build Projects in Vietnam

  • Dang, Chau Ngoc;Le-Hoai, Long;Lee, Young-Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.30-39
    • /
    • 2012
  • Design-build (D&B) has been broadly perceived as an effective project delivery method and become popular in the world. However, the implementation process of this innovative procurement method in Vietnam encounters difficulties due mainly to unfamiliarity and inexperience with the approach. Critical success factors (CSFs) which could be used to enhance the project execution are useful to practitioners in Vietnam if identified. A questionnaire survey was employed to identify CSFs of D&B projects in Vietnam. Parties' competence, especially financial capability, and contract documentation are the most important factors significantly affecting project success. It was also shown that the perspectives of two principal parties in D&B projects on the CSFs are statistically correlated. The identified CSFs were then validated with some various D&B projects. The execution results of CSFs' were compared with the projects' performance measured try key performance indicators (KPIs). The most important success factors of this study were also compared with other countries'. The validation and comparison results provide project participants with some useful information to perform D&B projects better. Practitioners should well perform the identified CSFs to enhance the chance of the success of D&B projects in Vietnam. The findings of this study are useful not only to Vietnamese practitioners but also to others who are concerned about D&B method and plan to employ it in Vietnam in future.

THE CONFLICT MANAGEMENT STYLE ADOPTED BY THE SUBCONTRACTORS OF HONG KONG BUILDING PROJECTS

  • Andy K.W. Ng;Andrew A.D.F. Price
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.628-634
    • /
    • 2009
  • It is a common practice in Hong Kong for the main contractors of local building projects to sublet most of the work to subcontractors. Consequently their roles have gradually transformed from a constructor to a manager of subcontractors. The outcomes of a project therefore depend heavily on the subcontractors' performance. However, most of the subcontractors complain that they are unable to efficiently and effectively operate due to site coordination problems, such as inaccurate site reference lines, caused by main contractors. The site problems may consume significant amounts of resources if practical solutions cannot be agreed by the project participants early enough. Rahim Organizational Conflict Inventory-II (ROCI-II) model was developed by M.A. Rahim that measure five types of conflict management style including Integrating, Obliging, Dominating, Avoiding and Compromising. This paper presents the questionnaire survey based on the ROCI-II model to rank the preference on the conflict management style adopted by the project representatives of the subcontractors in handling the site coordination problems and its impact to the time used to agree the solutions to the different types of site coordination problems with main contractor. The survey results show that most of the subcontractors' project representatives preferred to adopt the Compromising style to tackle the site coordination problems and the time used to agree the solutions with main contractor was influenced by the conflict management style adopted.

  • PDF

Issues of New Technological Trends in Nuclear Power Plant (NPPs) for Standardized Breakdown Structure

  • Gebremichael, Dagem D.;Lee, Yunsub;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.353-358
    • /
    • 2020
  • Recent efforts to develop a common standard for nuclear power plants (NPPs) with the aim of creating (1) a digital environment for a better understanding of NPPs life-cycle management aspect and (2) engineering data interoperability by using existing standards among different unspecified project participants (e.g., owners/operators, engineers, contractors, equipment suppliers) during plants' life cycle process (EPC, O&M, and decommissioning). In order to meet this goal, there is a need for formulating a standardized high-level physical breakdown structure (PBS) for NPPs project management office (PMO). However, high-level PBS must be comprehensive enough and able to represent the different types of plants and the new trends of technologies in the industry. This has triggered the need for addressing the issues of the recent operational NPPs and future technologies' ramification for evaluating the changes in the NPPs physical components in terms of structure, system, and component (SSC) configuration. In this context, this ongoing study examines the recent conventional NPPs and technological trends in the development of future NPPs facilities. New reactor models regarding the overlap of variant issues of nuclear technology were explored. Finally, issues on PBS for project management are explored by the examination of the configuration of NPPs primary system. The primary systems' configuration of different reactor models is assessed in order to clarify the need for analyzing the new trends in nuclear technology and to formulate a common high-level PBS. Findings and implications are discussed for further studies.

  • PDF

Size-Specific Dose Estimation In the Korean Lung Cancer Screening Project: Does a 32-cm Diameter Phantom Represent a Standard-Sized Patient in Korean Population?

  • Kim, Eun Young;Kim, Tae Jung;Goo, Jin Mo;Kim, Hyae Young;Lee, Ji Won;Lee, Soojung;Lim, Jun-tae;Kim, Yeol
    • Korean Journal of Radiology
    • /
    • 제19권6호
    • /
    • pp.1179-1186
    • /
    • 2018
  • Objective: The purposes of this study were to evaluate size-specific dose estimate (SSDE) of low-dose CT (LDCT) in the Korean Lung Cancer Screening (K-LUCAS) project and to determine whether CT protocols from Western countries are appropriate for lung cancer screening in Korea. Materials and Methods: For participants (n = 256, four institutions) of K-LUCAS pilot study, volume CT dose index ($CTDI_{vol}$) using a 32-cm diameter reference phantom was compared with SSDE, which was recalculated from $CTDI_{vol}$ using size-dependent conversion factor (f-size) based on the body size, as described in the American Association of Physicists in Medicine Report 204. This comparison was subsequently assessed by body mass index (BMI) levels (underweight/normal vs. overweight/obese), and automatic exposure control (AEC) adaptation (yes/no). Results: Size-specific dose estimate was higher than $CTDI_{vol}$ ($2.22{\pm}0.75mGy$ vs. $1.67{\pm}0.60mGy$, p < 0.001), since the f-size was larger than 1.0 for all participants. The ratio of SSDE to $CTDI_{vol}$ was higher in lower BMI groups; 1.26, 1.37, 1.43, and 1.53 in the obese (n = 103), overweight (n = 70), normal (n = 75), and underweight (n = 4), respectively. The ratio of SSDE to $CTDI_{vol}$ was greater in standard-sized participants than in large-sized participants independent of AEC adaptation; with AEC, SSDE/$CTDI_{vol}$ in large- vs. standard-sized participants: $1.30{\pm}0.08$ vs. $1.44{\pm}0.08$ (p < 0.001) and without AEC, $1.32{\pm}0.08$ vs. $1.42{\pm}0.06$ (p < 0.001). Conclusion: Volume CT dose index based on a reference phantom underestimates radiation exposure of LDCT in standard-sized Korean participants. The optimal radiation dose limit needs to be verified for standard-sized Korean participants.