• Title/Summary/Keyword: project management information system

Search Result 1,360, Processing Time 0.033 seconds

Con-Metaverse: Analysis of Performance Factor of Activate the Application of the Metaverse to the Construction Industry (건설 메타버스(Con-Metaverse): 메타버스의 건설 산업 적용 활성화를 위한 영향인자 분석)

  • Yu, Chaeyeon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.81-82
    • /
    • 2023
  • Since the COVID-19 pandemic, the importance of remote work has been emphasized, and new digital technologies are rapidly being developed. One such digital technology is the metaverse, which combines reality and virtual space to create an expanded digital world. The metaverse can provide online collaborative spaces that visualize and transmit information and data in real-time. When applied to construction sites, this technology is expected to enable more efficient and stable project management. However, research on construction metaverses, both domestically and internationally, is still inadequate. In this study, 16 influential factors for promoting the application of metaverses to the construction industry were identified through the initial stages of the system dynamics technique. These performance factors were classified into four categories: systemrelated factors for metaverse site construction, device-related factors, user-related factors, and construction site-related factors. It is expected that this study will promote research on the activation of Con-Metaverse by developing casual loop diagrams(CLD) to identify the relationship between each performance factor and constructing stock & flow diagrams(SFD) for simulations in future studies.

  • PDF

Design of Health Warning Model on the Basis of CRM by use of Health Big Data (의료 빅데이터를 활용한 CRM 기반 건강예보모형 설계)

  • Lee, Sangwon;Shin, Seong-Yoon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.8
    • /
    • pp.1460-1465
    • /
    • 2016
  • Lots of costs threaten the sustainability of the national health-guarantee system. Despite research by the national center for disease control and prevention on health care dynamics with its auditing systems, there are still restrictions of time limitation, sample limitation, and, target diseases limitation. Against this backdrop, using huge volume of total data, many technologies could be fully adopted to the preliminary forecasting and its target-disease expanding of health. With structured data from the national health insurance and unstructured data from the social network service, we attempted to design a model to predict disease. The model can enhance national health and maximize social benefit by providing a health warning service. Also, the model can reduce the advent increase of national health cost and predict timely disease occurrence based on Big Data analysis. We researched related medical prediction cases and performed an experiment with a pilot project so as to verify the proposed model.

Integration of in-situ load experiments and numerical modeling in a long-term bridge monitoring system on a newly-constructed widened section of freeway in Taiwan

  • Chiu, Yi-Tsung;Lin, Tzu-Kang;Hung, Hsiao-Hui;Sung, Yu-Chi;Chang, Kuo-Chun
    • Smart Structures and Systems
    • /
    • v.13 no.6
    • /
    • pp.1015-1039
    • /
    • 2014
  • The widening project on Freeway No.1 in Taiwan has a total length of roughly 14 kilometers, and includes three special bridges, namely a 216 m long-span bridge crossing the original freeway, an F-bent double decked bridge in a co-constructed section, and a steel and prestressed concrete composite bridge. This study employed in-situ monitoring in conjunction with numerical modeling to establish a real-time monitoring system for the three bridges. In order to determine the initial static and dynamic behavior of the real bridges, forced vibration experiments, in-situ static load experiments, and dynamic load experiments were first carried out on the newly-constructed bridges before they went into use. Structural models of the bridges were then established using the finite element method, and in-situ vehicle load weight, arrangement, and speed were taken into consideration when performing comparisons employing data obtained from experimental measurements. The results showed consistency between the analytical simulations and experimental data. After determining a bridge's initial state, the proposed in-situ monitoring system, which is employed in conjunction with the established finite element model, can be utilized to assess the safety of a bridge's members, providing useful reference information to bridge management agencies.

Dominant Design Technology Strategy Based on Open Innovation : High Skewed Propeller(HSP) Design and Production System of Hyundai Heavy Industries Co. (개방형 기술혁신 기반의 지배적 디자인 기술개발 및 확보 전략 : 현대중공업의 HSP(High Skewed Propeller) 설계 및 생산 시스템)

  • Ahn, Yeon S.;Kim, Wha Young
    • Journal of Information Technology Applications and Management
    • /
    • v.25 no.1
    • /
    • pp.1-17
    • /
    • 2018
  • This study presents a research model that demonstrates the dominant design technology strategy for developing and securing dominant design technology based on open innovation. For this purpose, this study developed a strategic model for the development and acquisition of design technology, production technology, and production system of propeller which satisfies the requirements of ship propulsion system required by ship owners and shipbuilders. By studying large propellers for ships, it is possible to embody a strategic model that can be used as a technology development strategy of dominant design that is effective in technology field of other industries. In this study, HSP (High Skewed Propeller) strategy of Hyundai Heavy Industries, which occupies the largest global market share (47.5%, 2007) for more than 30 years until now, is analyzed as a successful case to verify this strategic model. The development and acquisition strategy model of dominant design technology presented in this study consists of four stages : dominant design project strategy, dominant design engineering technology strategy, dominant design production technology strategy, and dominant design production system strategy. The strategic model summarizes the key activities at each stage. In addition, the steps and core activities of this strategic model were confirmed through the case study. As a technology development strategy of HSP products, Hyundai Heavy Industries utilized open innovation technology to cooperate with outside, that is, collaborative research and development with KAIST (Korea Advanced Institute of Science and Technology) research team, and succeeded in achieving technology development of dominant design of HSP products by linking it with HSP technology development and acquisition strategy.

Improving Estimation Ability of Software Development Effort Using Principle Component Analysis (주성분분석을 이용한 소프트웨어 개발노력 추정능력 향상)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.9D no.1
    • /
    • pp.75-80
    • /
    • 2002
  • Putnam develops SLIM (Software LIfecycle Management) model based upon the assumption that the manpower utilization during software project development is followed by a Rayleigh distribution. To obtain the manpower distribution, we have to be estimate the total development effort and difficulty ratio parameter. We need a way to accurately estimate these parameters early in the requirements and specification phase before investment decisions have to be made. Statistical tests show that system attributes are highly correlation (redundant) so that Putnam discards one and get a parameter estimator from the other attributes. But, different statistical method has different system attributes and presents different performance. To select the principle system attributes, this paper uses the principle component analysis (PCA) instead of Putnam's method. The PCA's results improve a 9.85 percent performance more than the Putnam's result. Also, this model seems to be simple and easily realize.

Research on the Development of the Oriental Medical Model on the Health Examination in the Industry (산업장 건강검진의 한의학적 모델 개발 연구)

  • Chong M.S.;Kim S.C.;Lee E.K.;Chun E.J.;Han J.M.;Lee S.K.;Kang S.H.;Yu T.S.;Jeung J.Y.;Song Y.S.;Lee K.N.
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.4 no.1
    • /
    • pp.32-50
    • /
    • 2000
  • On the process of research in the plan on oriental medical participation in the industrial health sponsored by BK21 project, we carried out the oriental medical health examination program for workers during former half-year We reached the conclusion as follows, 1. The oriental medical health examination program is contents and formalities that should be determined by present industrial health system, based on the oriental medical system and scholastic character, and included probability of the western and oriental medical cooperation. 2. The oriental medical health examination program can promote capability of individual health management and productive power of workers, and it is capable to manage on the self-conscious symptoms and macroschophically approach to their environment 3. The oriental medical health examination program that we have developed, is flow as questionare, understanding of working environment, information of result and later management. It is composed of three fields as follow , first, use of pulse diagnostic apparatus, understanding of the health promotion life style, and diagnosis of the oriental medical doctor, second, analysis of constitution, third, photographing for understanding of the musculoskeletal disorders, questionare for musculoskeletal self-conscious symptoms, and diagnosis of oriental medical doctor. 4. The oriental medical health examination program that we have developed, progressive from the view point of health, makes the oriental medical doctor's roll more important. It is the first trial at the western and oriental medical cooperation and characterized by excellence about musouloskeletal disorders. But it need to be improved in aspects of time and specialist on the health examination, diagnostic apparatus, control of examinant and later management. So we think that it needs research on the employment of health examination specialist, establishment of later management system, development of significantly diagnosable standard and assessable form on the health examination, and contents of health examination on the western and oriental medical cooperation.

  • PDF

Active IP-RFID System for Maritime Logistics (실시간 해운물류를 위한 능동형 IP-RFID 시스템)

  • Kim, Tae-Hoon;Lee, Byung-Ha;Park, Byung-Kwon;Choi, Sung-Pil;Moon, Young-Sik;Jung, Jun-Woo;Kim, Jae-Joong;Choi, Hyong-Rim
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.12
    • /
    • pp.2511-2519
    • /
    • 2015
  • In maritime logistics, the technology for transmitting status information has been greatly developed, but it has not been available in general logistics environment or it is impossible to support two-way communication as it simply receives and transfers a container's information. In particular, to support two-way communication in all sections of the global maritime logistics, the address value, which can identify the tag, should be managed. In this context, to improve the 433 MHz-based RFID, the project called "DASH 7" has been conducted in recent years. However, it has stopped proceeding because of its slow progress, including the standardization and development of references. In this paper, we introduced an active IP-RFID system configuration for real-time communication in global maritime logistics using a two-way communication-which is characteristic of an IP-applying virtual address values in the RFID tag, and proposing its process and function. When you apply the IP-RFID system proposed in this paper, not only real-time status tracking in the maritime logistics area is possible, but it is also applicable for controlling the tag.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

Construction Business Automation System (건설사업 자동화 시스템)

  • Lee, Dong-Eun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.95-102
    • /
    • 2007
  • This paper presents the core technology of Construction Business Process Automation to model and automate construction business processes. Business Process Reengineering (BPR) and Automation (BPA) have been recognized as one of the important aspects in construction business management. However, BPR requires a lot of efforts to identify, document, implement, execute, maintain, and keep track thousands of business processes to deliver a project. Moreover, existing BPA technologies used in existing Enterprise Resource Planning (ERP) systems do not lend themselves to effective scalability for construction business process management. Application of Workflow and Object Technologies would be quite effective in implementing a scalable enterprise application for construction business processes by addressing how: 1) Automated construction management tasks are developed as software components, 2) The process modeling is facilitated by dragging-and dropping task components in a network, 3) Raising business requests and instantiating corresponding process instances are delivered, and 4) Business process instances are executed by using workflow technology based on real-time simulation engine. This paper presents how the construction business process automation is achieved by using equipment reservation and cancellation processes simplified intentionally.

  • PDF

GIS 데이터구축 감리와 검수 프로그램

  • 조윤숙;박인만;정필구
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2002.03b
    • /
    • pp.11-24
    • /
    • 2002
  • Many GIS systems are not to be trusted becuase many GIS project managers often fail to notice importance of GIS data Construction. With this reason, it is a lively discussion on GIS administration system's adaption. The definition of GIS administration system is not clear, but GIS administration system generally is devided information system administration, audit guideline for the data construction of GIS. Audit guideline for the data construction of GIS. GIS data construction's goals are logical and reasonable action policy of GIS data construction in widespread filed, the other goal is creation of product to the purpose exactly. Audit guideline for the data construction of GIS is composed of optimum of GIS data construction's planning, optimum of GIS data construction's activity, optimum of GIS data quality management, optimum of consultations of GIS data construction, GIS data audit. GIS data audit is the phase of detection product's potential error in each level. GIS data audit is composed of filed examination or filed verification, examination with the naked eye, screen verification, program verification, auto verification. GIS information system's efficiency is linked with auto verification system's function variety, accuracy. this paper offer introduction of Audit guideline for the data construction of GIS, efficient auto verification program

  • PDF