• Title/Summary/Keyword: project management information system

Search Result 1,360, Processing Time 0.028 seconds

AN ONTOLOGY SCHEME FOR DISCRIMINATING CONSTRUCTION IETM FROM EXISTING INFORMATION SYSTEMS

  • Jeong, Jinwook;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.942-948
    • /
    • 2009
  • Today's construction is a large-scale and long life span program, so called Mega-scale project, that every moment constructor faces much of hardships, It is because of a large amount of stakeholders, data and complicated relationship among workers. In order to overcome these problems, IETM(Interactive Electronic Technical Manual) has been introduced to construction industry recently, It is regarded as a useful tool for handling the data, procedures of the construction, but it is similar to existing IT-based information systems, the PMIS(Project Management Information System) and the KMS(Knowledge Management System), without characterizing. This research is intended to find out IETM's property and to present the Ontology scheme discriminating Construction IETM from existing systems..

  • PDF

DEVELOPMENT OF A GIS-BASED GEOTECHNICAL INFORMATION ENTRY SYSTEM USING THE GEOTECHNICAL INVESTIGATION RESULT FORM AND METADATA STANDARDIZATION

  • YongGu Jang;HoYun, Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1388-1395
    • /
    • 2009
  • In March 2007, Korea's Ministry of Construction & Transportation (MOCT) established "Guidelines on the Computerization and Use of Geotechnical Investigation Results," which took effect as official instructions. The 2007 Geotechnical Information DB Construction Project is underway as a model project for a stable geotechnical information distribution system based on the MOCT guidelines, accompanied by user education on the geotechnical data distribution system. This study introduces a geotechnical data entry system characterized by the standardization of the geotechnical investigation form, the standardization of metadata for creating the geotechnical data to be distributed, and the creation of borehole space data based on the world geodetic system according to the changes in the national coordinate system, to define a unified DB structure and the items for the geotechnical data entry system and to computerize the field geotechnical investigation results using the MOCT guidelines. In addition, the present operating status of the geotechnical data entry system and entry data processing statistics are introduced through an analysis of the model project, and the problems of the project are analyzed to suggest improvements. Education on, and the implementation of, the model project for the geotechnical data entry system, which was developed via the standardization of the geotechnical investigation results form and the metadata for institutions showed that most users can use the system easily. There were problems, however, including those related to the complexity of metadata creation, partial errors in moving to the borehole data window, partial recognition errors in the installation program for different computer operating systems, etc. Especially, the individual standard form usage and the specificity of the person who enters the geotechnical information for the Korea National Housing Corporation, among the institutions under MOCT, required partial improvement of the geotechnical data entry system. The problems surfaced from this study will be promptly addressed in the operation and management of the geotechnical data DB center in 2008.

  • PDF

SUPPLY CHAIN MANAGEMENT SYSTEM FOR CURTAIN WALLS USING RFID TECHNOLOGY

  • Sangyoon Chin;Suwon Yoon;Yea-Sang Kim;Cheolho Choi;Do-Bum Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1022-1027
    • /
    • 2005
  • This research presents a collaborative supply chain management system for curtain walls using Radio Frequency IDentification (RFID) to track the product and information flow among participants in high-rise building construction projects. This resarch developed a process model and a strategy for effective utilization of RFID technology through the curtain wall life-cycle. Then an information management system was developed to support the supply chain management of curtain walls with incorporating RFID into curtain wall products flow throughout the life-cycle. The system has been tested for validation and verification in a real world project.

  • PDF

A Building Scheme on LAMIS for ROK Army (한국군 종합군수지원 관리정보체계 (LAMIS) 구축방안)

  • Hong Jang-Ui;Yun Hyeon-Cheol;Byeon Jae-Jeong
    • Journal of the military operations research society of Korea
    • /
    • v.18 no.2
    • /
    • pp.1-22
    • /
    • 1992
  • Computer-aided logistics support system is recognized an essential system to reduce supply and maintenance cost, and to improve readiness of weapon system or operationable composite machines. According to these trends, this paper focuses on the design scheme and the computerization strategy of information management system for Integrated Logistics Support (ILS) work. Suggested system. LAMIS(Logistics support Analysis Management Information System) is a total system that composed of Logistics Support Analysis Management information system (LSAM), Configuration Management Information System (CMIS), Maintenance Management Information System (MMIS), Project Management System (PMS) and Information Retrival System(IRS) etc. Also, LAMIS is a computerized tool that improves current supply and maintenance support program, that attempts to reliable requirment analysis of logistics support elements, and that supports to use the existing technical specification of similar one when weapon system acquisition project is started newly. When LAMIS implication is completed, it can be applied to logistics support of defense or commercial site. Straightway, LAMIS will be enhanced with computer - aided design system, engineering drawing system, interactive electronic technical manual system, electronic data interchange system, and three dimensional simulation system to weapon system configuration. When that is done, LAMIS is CALS system.

  • PDF

IECS: an Integrated E-Community System for Management, Decision and Service

  • Bo, Yu;Wang, Hongding;Peng, Zhang;Tong, Yunhai;Tang, Shiwei;Yang, Dongqing
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.375-387
    • /
    • 2004
  • The paper presents an Integrated E-Community System (IECS) for management, decision and service, designed for the e-government project of Haishu District of Ningbo, Zhejiang, China. The project need is to promote the integration of management information and service information of communities, providing a unified platform on which different departments of the district government can share and exchange community information, government officers can analyze information and make decisions, and the outside users can access and request services. To meet the project need, the IECS consists of five parts: 1) The Central DataBase (CDB) that stores all information related with management, decision and service of communities: 2) Information Extracting Subsystem (IES) that provides functions of extracting data from data sources, transforming and loading them into the CDB for system administrators; 3) Information Management Subsystem (IMS) that provides functions of querying and sharing of information for government users, and functions of information maintenance, rights and log management for system administrators: 4) Intelligent Analysis Subsystem (IAS) that provides functions of extracting analysis related data from the CDB and loading them into the DW, and functions of multi-dimensional analysis and decision-making based on the DW and OLAP for government users; 5) Information Service Website (ISW) that provides functions of promulgating and collecting of information for government users and system administrators, and functions of browsing, querying and requesting of service information for outside users. The IECS supports management, decision and service of a government based on a unified data platform--the CDB, and ensures data security by providing different workplaces and rights for different users. In the real application, the system works well.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

A Priority Analysis on Influential Factors for Invigorating Project Management Office (PMO) in Public Sectors based on Analytic Hierarchy Process (AHP) (계층분석과정을 이용한 공공분야 PMO 제도 활성화요인 우선순위 분석)

  • Back, Hyungchung;Kang, Pilsung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.42-53
    • /
    • 2014
  • This study identifies influential factors for invigorating the public management office (PMO) system for system integration (SI) projects in public sectors and analyzes the priority of each factor from the point of different stakeholders, i.e., owners, SI company, and PMO. Based on the literature review, four first-level influential factors are identified: legal system maintenance, owner's capability, SI company's capability, and PMO's capability. Among them, the PMO's capability is determined as the most critical factor by all the stakeholders. Among the second-level influential factors, the capabilities of professional engineers and project managers are considered as important among the PMO's capability, whereas the reasonable consulting fee is considered as the most critical factor among the legal system maintenance. With respect to each stakeholder, project management capability is considered as the most important factor for owners, while the reasonable consulting fee is considered as the most important factor for PMO.

A study on the Strategy for Management Business Innovation and Information System in Next generation. (Focued on PI & Six Sigma) (차세대 경영혁신 및 정보시스템 구축 전략에 관한 연구 (PI & 6시그마 중심으로))

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.19-29
    • /
    • 2005
  • Since 1980's, many enterprises have constructed Strategy Information System and tried BPR, ISP. Also, they implemented ERP and practiced the Process Innovation and Six Sigma for Management Innovation in todays, Although most companies had provious good plans, but those are not satisfied. Because of failed to change management and continued next activity. Many Project for Process innovation are ended as disposal project in many case, if they want next project, they need a new plan which needs additional fund and re source. This paper studied Process Innovation and Six Sigma in many things and proposed new model for continued project on the master plan. Also it proposed next study subject about ERP Optimization and Harmonization after implemented ERP which is considered as next step of PI.

  • PDF

A study on the Strategy for Management Business Innovation and Information System in Next generation(Focued on PI & Six Sigma) (차세대 경영혁신 및 정보시스템 구축 전략에 관한 연구(PI & 6시그마 중심으로))

  • Park, Jong-Ki;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.119-130
    • /
    • 2006
  • Since 1980's, many enterprises have constructed Strategy Information System and tried BPR, ISP. Also, they implemented ERP and practiced the Process Innovation and Six Sigma for Management Innovation in todays. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and continued next activity. Many Project for Process innovation are ended as disposal project in my case, if they want next project, they need a new plan which needs additional fund and resource. This paper studied Process Innovation and Six Sigma in many things and proposed new model for continued project on the master plan. Also it proposed next study subject about ERP Optimization and Harmonization after implemented ERP which is considered as next step of PI.

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF