• Title/Summary/Keyword: project evaluation

Search Result 2,386, Processing Time 0.036 seconds

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

Performance Analysis on Income Generation Works in Comprehensive Rural Village Development Project by Their Implementation (농촌마을종합개발사업의 공동소득사업 성과분석)

  • Yang, Won-Sik;Choi, Soo-Myung
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.1
    • /
    • pp.55-70
    • /
    • 2013
  • Since 2004, Ministry for Food, Agriculture, Forestry and Fisheries(MIFAFF) has been carrying out comprehensive rural village development project as the core one of Rural Area Development Schemes in Korea. Up to now, 56 projects had been completed after having with 5-year plan implementation period, on which it is possible to try post-project evaluation works. This study aims to propose a rational income-generation works model of comprehensive rural village development project, based on fulfillment checking results of their statutory stepwise working procedures specified in the project guidelines and their interim/post project performance analysis results in 56 project areas above mentioned. In comprehensive rural village development project, income-generation works generally have both quantitative and qualitative effects to rural communities; the former is focussed on income increasement of villagers, while the latter on community revitalization through job creation and spill-over effects of other linked community activities. So, the research works of this study focussed on these two comprehensive effects above mentioned.

An Evaluation Study on the School Library Revitalization Project (학교도서관 활성화 사업에 대한 인식 및 효과성 측정연구)

  • Noh, Young-Hee;Kwon, Jae-Hyun
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.41 no.2
    • /
    • pp.81-110
    • /
    • 2007
  • This study aims to identify challenges faced by the schools participating in the 2006 School Library Revitalization Project so as to incorporate them in the next year's plan, which is the last year of the phase one of the project, as well as in designing the phase two. By doing so, it seeks to contribute to enhancing effectiveness of the School Library Revitalization Project conducted by the Ministry of Education and Human Resources Development(MOEHRD), the Republic of Korea. The second segment of the research consists of the pub)ic survey in 1,281 project schools(2005) and 1,098 project schools(2006) to assess overall performance of the project. The target group is divided into five categories of school inspectors, principals, teachers, school librarians, and students.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

Evaluation and improvement of forest watershed management projects in Korea

  • Rhee, Hakjun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.885-901
    • /
    • 2020
  • A forest watershed management project was introduced in 2004 to develop ecologically sound forest watersheds. It includes landslide prevention and erosion control, water resource management, landscape development, and forest resource management. However, it has been managed fragmentarily and inefficiently, far from the original intents. This study investigated current status, problems, and improvement measures of the project. Literature reviews were conducted on forest watershed management in Korea and other countries, and surveys were conducted on 201 erosion control experts. When introduced, the forest watershed management project was well planned and implemented as intended. It later turned to focus only on disaster prevention such as erosion control dams and stream conservation measures. The survey results showed that a majority (89% and 86%) of surveyees wanted increases in the project period and budget. They also responded that conflicts with local residents (51%) and determining project locations (32%) were the most difficult tasks when implementing the projects, and only 36% kept project records. To plan and implement the projects as intended, the following suggestions should be considered: (1) establishment of a solid legal foundation and improvement of the erosion control practices law; (2) increase in the project period (from 1 to 2 - 3 years) and budget; (3) development of a manual for project site selection and guidelines; (4) monitoring and systematic information management; and (5) development of spatial analysis tools for watershed analysis and management.

A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military (국방 전장관리정보체계 연구개발사업의 애자일 적용 방안 연구)

  • Yun, SungHyun;Lim, GyooGun
    • Journal of Information Technology Services
    • /
    • v.20 no.1
    • /
    • pp.41-54
    • /
    • 2021
  • The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support it In this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements) - DAPA (project management) - developer - functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.

A Study on Establishing the Performance Evaluation System of the Fish Stock Rebuilding Plans (수산자원회복계획의 성과평가 개선방향에 관한 연구)

  • Kim, Dae-Young;Lee, Jung-Sam;Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.15-29
    • /
    • 2011
  • The Fish Stock Rebuilding Plan (FSRP) is evaluated as one of the most effective fisheries policies domestically and internationally. FSRP is a comprehensive fisheries policy, including target stock size, rebuilding period, application of management measures, and participation of fishermen. The performance outcomes of FSRPs have been partially evaluated for recommendation for stock rebuilding in Korea, while they are fully evaluated in other countries that have implemented FSRPs. The performance evaluation system for FSRP is very needed to enhance its effectiveness as one of fisheries policies. That is, the system where problems can be reconsidered, achieving targets can be evaluated, and the plan can be modified should be implemented. This study classified the performance evaluation of FSRP into the economic evaluation as a quantitative analysis and the policy evaluation as a qualitative analysis. In the economic evaluation, the sustainability of fishery resources, the stability of fishing business, the efficiency of fishery production, and efficient utilization of fishery resources can be considered. As analytical methods for the economic evaluation, the bioeconomic model, efficiency estimation model, the dynamic MEY model can be utilized. The qualitative evaluation is to assess the qualitative performances of FSRPs, including interviews and surveys with fishermen and fisheries experts. In the survey, many different items can be included by evaluation factors which are related to policies such as timeliness, transparency, effectiveness, etc. In addition, the study suggested the performance evaluation system and procedures for objective and efficient evaluation of FSRPs. In order to practically apply the developed performance evaluation model, the pilot project is needed. That is, from the application of pilot project, detailed research methods, effective procedures, and evaluation factors can be investigated.

An option pricing-based model for evaluating privatized infrastructure projects (옵션기반모형을 활용한 민간 사회기반시설 프로젝트 평가 사례: 인천공항철도 민간투자사업)

  • Lee, Sun-Ju;Yoo, Shi-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.4
    • /
    • pp.1442-1448
    • /
    • 2010
  • The evaluation of the financial viability of a privatized infrastructure project is complex because of the uncertainties involved due to the project's scale, long concession period and complexity. Use the BOT option valuation(BOT-OV) model, for evaluating the financial analysis of a privatized infrastructure project. This sophisticated for financial evaluation compared with a traditional NPV analysis.

The Effect of Project Complexity, Team Members' Structure, and Process Index on Efficiency of System Integration Projects

  • Hong, Han-Kuk;Park, Chul-Jae;Leem, Byung-Hak
    • Journal of information and communication convergence engineering
    • /
    • v.6 no.3
    • /
    • pp.323-326
    • /
    • 2008
  • Data Envelopment Analysis (DEA) is a theoretically sound framework for performance analysis that offers many advantages over traditional methods such as performance ratios and regression analysis. Largely the result of multidisciplinary research during the last three decades in economics, engineering and management, DEA is best described as an effective new way of visualizing and analyzing performance data. Besides, overseas information technology companies have aggressively tried to enter the domestic market. In the age of globalization and high competition, it is imperative that the system integration (SI) companies need to introduce the performance evaluation models of SI projects, including Capability Maturity Model and Software Process Improvement and Capability Determination, to gain a competitive advantage. Therefore, it makes our research regarding evaluation of SI projects very opportune. The purpose of the study is not only to evaluate efficiency of each project by DEA but also to gain insight into various factors such as project complexity, team members' man-months structure, and process index(project management index) that link to the projects performance.