• Title/Summary/Keyword: professional project

Search Result 471, Processing Time 0.022 seconds

Completing the Seohae Grand Bridge Construction Supervision (서해대교 감리를 마치며)

  • 전준수
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.23-26
    • /
    • 2001
  • Seohae Grand Bridge is a part of the new West Coast Highway(353km) under construction, which connects Inchon and Mokpo. It is the longest bridge in Korea (7.31 km), and has 97 spans of 60m each precast segmental approach bridges, 2 main spans of 165m each free cantilever segmental bridge(500m), and 1 stay cable bridge of 990m In total length. During the seven year long construction period, many new construction technologies and methods were utilized for the first time in Korea, and gave invaluable opportunities to experience and master these in completing the project on time with safety and precision. I am proud of being a member of this project, and wish to express deep appreciations to those who participated in the project.

  • PDF

A study on exposed aggrigate P.C. in field plant cast - case study for core building, VOTRAKON project - (골재노출 P.C제품의 현지생산에 관한 소고 -보트라콘 프로젝트의 코아빌딩을 중심으로-)

  • 이학영
    • Journal of the Korean Professional Engineers Association
    • /
    • v.19 no.2
    • /
    • pp.34-42
    • /
    • 1986
  • These brief studies and reports of the use of exposed aggrigate precast concrete in practice are combined with a description of some notable co-ordination such as shop drawing, manufacturing and erection in the field construction. Above mentioned exposed aggrigate P. C. means architectural P. C. which was used to the VOTRAKON site in Riyadh, Saudi Arabia. Fabricated P. C. on the site without autoclaving and steam curing plant had been successfully carried out on this project-core building, conference room and others. The project designed by HOPE/VTN international INC. which is located in San Diego, California U.S.A. stands for vocational training and related support facilities contract. We had to submit shop drawings showing complete information for fabrication and installation of P. C. unit reinforcement. Also we should be indicated member dimension and cross section, location size and type of necessary for erection. We can delineate the following characteristic results. One of the most important things how to handle exposed aggrigate P.C. unit as specified was quality assurance and co-ordination for shop drawing, manufacturing and erection.

  • PDF

How to Efficiently Implement Modernization Projects of process Control Systems (플랜트 계측제어 시스템의 개선과 프로젝트의 효율적인 수행)

  • 최기원
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.4
    • /
    • pp.44-47
    • /
    • 2000
  • Recently number of reinstrumentation projects in the process plants has grown to meet the needs to modernize or upgrade the exsisting control systems in a bid to boost productivity and quality. Design, installation and start-up of these process automation systems can be successful and trouble-free only if decision points are addressed properly. The critical decision points are encountered from tile design through the start-up phases of implementing a modernization project and discussed extensively here on a practical basis. Key points are ;to assign a project manager out of the plant instrument engineers for him to organize and lead a project team. ;to follow three critical steps in designing and implementing. :to think ahead of the critical steps and to induce a positive cooperation from all level of participants in the effort to prevent possible schedule delays.

  • PDF

The Solution Of Software Contract (기획특집 - 공공 소프트웨어 발주관행 개선방안(IT 프로젝트관리 실무))

  • Shim, Ki-Bo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.29-31
    • /
    • 2009
  • A general practice in software ordering behavior in public sector has been an enormous obstacle standing in development path of Korea's software industry. Standard on software development cost estimation is supposedly based on Function Point, but in general, it is on headcounting (a number of people involved in a project). Moreover, it is difficult to change a contract in an on-going project, since statement of work is not precisely and carefully described. But it has a simple solution. Design and Implementation should be a separate project, as in construction industry, and both power and responsibility for design should be given to an expert with a national-level qualification. Here, there is a simple way for Korea to reborn as one of the strongest software country.

  • PDF

The Plan of Refurbishing Korea's Top 4 Rivers (-국토개발의 균형발전 측면에서본- 4대강 정비사업계획)

  • Chung, Moo-Yong
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.2
    • /
    • pp.35-40
    • /
    • 2009
  • This article is summary of 'Korean Green New Deal' project which strives to revive Korea's Top 4 rivers for the next four years, between 2009 and 2012. The purpose of this project is balanced national development and recovered regional economy, creating new jobs. Details of the 'Korean Green New Deal' include means to reinforce obsolete embankments and to recover the river ecosystem by maintaining sedimentary soil, to install small- to middle-sized dams and flood control reservoirs and to establish eco-friendly reservoir for emergency water supplies. The project is expected to generate 190,000 new employee and create 23 trillion won worth production inducement effect, contributing in the revival of regional economies.

  • PDF

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

New Technical Method in Incheon Bridge (인천대교와 신기술들)

  • Yoon, Man-Keun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.6 s.189
    • /
    • pp.42-48
    • /
    • 2006
  • This is briefly to introduce about design and construction method newly adopted in Incheon bridge construction site. The Incheon Bridge Project are divided into 3 parts, that is Cable Stayed Bridge. Viaduct Bridge and Approach Bridge. In this paper, we will describe overview and construction sequence of each kind part.

  • PDF

Tunneling project of Oil Storage in Underground Base (지하 원유 저장기지 터널굴착공사)

  • Kim Yoong Tae
    • Explosives and Blasting
    • /
    • v.9 no.2
    • /
    • pp.13-18
    • /
    • 1991
  • It was described Several Tuneling method for applying petrolum oil storage. The most Important factor of Tunneling is not only reinforcing works such as pre-grouting and after grouting but also rock bolting and shotcrete. The efficent works should be done by professional skillman, and also the classification of rock should be decided by professional engineers.

  • PDF

Taipei Financial Center Project (Taipei F.C 건물의 신공법 시공사례 -세계 최고층(508m) 프로젝트-)

  • 옥유곤
    • Journal of the Korean Professional Engineers Association
    • /
    • v.37 no.2
    • /
    • pp.37-41
    • /
    • 2004
  • 왜 이렇게 높이 지어야 하는가? 그 가장 큰 목적은 초고층 건축물의 건축을 통해 세계와 경쟁하고, 인간의 능력, 즉 현시점의 건축기술 한계에 대한 도전이자 경제, 문화수준의 발산일 것이다. 그런 관점에서 아무도 세계에서 제일 높은 건축물을 대만에 지으리라 생각하지 않았을 것이다.(중략)

  • PDF

University's the UCC Project Teaching and Learning Model Development and its Application (대학의 UCC 프로젝트 교수·학습 모형 개발 및 적용)

  • Kwon, Myung-Soon;Kan, Jin-Sook
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.4
    • /
    • pp.937-957
    • /
    • 2013
  • This study was conducted for the purpose of developing the UCC project teaching and learning model based on the rationale which are applicable effectively in the field of university education. Firstly, we have designed the rationale based on the research of documents and preceding researches about teaching method models. Secondly, we have developed the UCC project teaching and learning model. the UCC project teaching and learning model based on the rationale was assessed by the professional formative evaluation group and tested in the field of university education in advance and thereafter. It was finally rectified and supplemented. Particularly, any corrections were to be made repeatedly in the stage of developing of the UCC project. And also, during the assessment and arrangement process, it was designed for the study participants to feel a sense of achievement as learners who combine knowledge and attitudes toward participants'subjects of the curriculum and professional vocational skills by performing the nursing science training scene which could happen in the field. Thirdly, the final version of the UCC project teaching and learning model was verified in its effectiveness by being applied in the field of the nursing science education in the $2^{nd}$ step. As a result, we noticed that learners diverse abilities were improved through systemic process and performing elements such as teaching plan which was needed for designing the UCC project in the field, making storyboard and skills for making video contents. We hope that the UCC project teaching and learning model in this study will be used by the students for designing, developing and utilizing educational UCCs which are necessary in industrial fields and it will contribute for training university students as professionals having the practical skills in the field.