• 제목/요약/키워드: productivity increase

검색결과 2,105건 처리시간 0.028초

국내 건설기업의 안전인식수준과 건설생산성간의 상관관계 분석 기초연구 (A Basic Study on the Correlation Analysis between Safety Perception Level of Domestic Construction Companies and Construction Productivity)

  • 전상섭;오준석;손승현;손기영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.47-48
    • /
    • 2019
  • Currently, the government has made a lot of efforts to improve construction productivity but there are few studies which measure between safety perception level and productivity in the South Korean construction industry. Therefore, the objective of this study is to analyze correlation between safety perception level of domestic construction companies and construction productivity. To achieve the objective, first, the concept of safety perception level was defined. Second, the safety perception level and construction productivity were investigated in the case projects. Third, correlation analysis was conducted between safety perception level and productivity. As a result, it was concluded that a high level of safety perception of executive and manager would increase construction productivity. In addition, To improve the safety perception level in the construction company, it is suggested that the provision safety resources for managements and the equal communication system between workers and managements and the development safety education tools considering the worker's experience. In the future, these findings can be utilized to develop future evaluation tools for a safety perception level in domestic construction company.

  • PDF

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

재택근무가 업무 생산성에 미치는 영향과 업무 특성의 조절 효과: 대규모 현장 데이터를 활용한 실증 분석 (The Productivity Impact of Working from Home and the Moderating Effect of Task Characteristics: An Empirical Investigation of Field Data)

  • 김재영;이동주
    • 아태비즈니스연구
    • /
    • 제15권1호
    • /
    • pp.113-129
    • /
    • 2024
  • Purpose - This study aims to empirically identify the quantitative effects of work from home (WFH) on employee productivity using field data. Design/methodology/approach - Based on large-scale field data from a South Korean company which introduced the WFH arrangement in 2020, we conducted fixed effect and moderating effect analyses using individual-level panel data over sixty-three weeks. Findings - The empirical analysis generated several findings. It was found that overall, WFH has a positive effect on productivity. However, the productivity impact of WFH was found to vary depending on task characteristics. Specifically, WFH led to over 20% increase in productivity for simple and repetitive tasks. On the other hand, no significant productivity impact was observed for professional and knowledge-based tasks. Research implications or Originality - As the first study based on field data from South Korea, this study offers convincing causal evidence of the moderating impact of task characteristics on the relationship between WFH and productivity. Further, the above findings provide managers with practical insights concerning their work arrangement decisions.

The Role of Arbitration in the Influence of Organizational Intangible Power on Work Commitment and Conflict

  • Kim, Chul-Jung
    • 한국중재학회지:중재연구
    • /
    • 제28권3호
    • /
    • pp.55-73
    • /
    • 2018
  • The purpose of this study is to investigate effects of arbitration in organizational performances by means of literature review. The contents of the study were theoretical studies on the role of intangible power in the organization. By mediating compliance and repulsion, it is intended to reduce conflicts and increase work commitment, which in turn will increase productivity and increase employee self-esteem, and help improve corporate image over the long term. Factors such as the contents of professional power, the content of referent power, the importance and contents of informational power as well as the importance of arbitration were studied. It is found that when arbitration is effective, it can increase work commitment and improve the productivity of the enterprise.

우리나라 제조업과 서비스업의 생산성과 기술변화 비교분석 (Analysis of the Productivity and Technological Change of the Manufacturing and Service Industries in Korea)

  • 배영임;송성환;권성훈;홍순기
    • 산업공학
    • /
    • 제21권3호
    • /
    • pp.312-321
    • /
    • 2008
  • The productivity increase by technological advance is the biggest driving force of economic growth. In this paper, we investigate the inputs and outputs of the manufacturing and service industries in Korea. We also estimate the total and partial factor productivities of both industries using the Solow model and the Kendrick model. Finally, we analyze the contribution of each input factor to industrial growth.

코레일 신규채용기준의 유의성에 관한 연구 (An empirical study on the significance of employment criteria in KORAIL)

  • 인태명;박수명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1914-1923
    • /
    • 2009
  • KORAIL continuously drives practical reforms of change and originality both internally and externally for the purpose of adapting to rapidly changing circumstance and promote productivity of the organization. Various management strategies are needed to increase its productivity, yet the fist thing to be considered is to select talented human resources. A selection of the human resource should be conducted based on 3R(Right People, Right Place, Right Time). This study empirically analyzes through actual study how the method of new employment introduced on January 1, 2005 positively affects capability and productivity of each member of KORAIL. The area of this study is defined centering on the standard of new employment, capability of personnel, and productivity of the organization. Also, the improvement of new employment standard of KORAIL is suggested as significance of the standard was verified through survey of the standard, the capability and the productivity conducted to KORAIL working personnel.

  • PDF

고랭지에 적합한 사료작물 2모작 작부체계에 관한 연구 (Effect of the Double Cropping at High Altitude Area Which was Cultivated Suitable Forage Crop)

  • 한성윤;김대진
    • 한국초지조사료학회지
    • /
    • 제20권3호
    • /
    • pp.147-154
    • /
    • 2000
  • This study was conducted to increase the utility and productivity of forage crops at high altitued areas. For that purpose, 21 cultivars of corn and 2 cultivars of rye were cultivated for 3 years using a randomized block designed with 3 replications. The results obtained were as follows. 1. In the Taekwallyong area (800m above sea level) which has a short frostless period, all the seeding and harvest of corn must be finished within about 135 days between mid May, the time of the last frost, and late September, the time of the first frost 2. It was relatively safe for the early maturity cultivar(ll0days) and the medium maturity cultivar(l20days), compared to the late maturity cultivar(l30days) which might have had the possibility of an overlapping period between the time of harvest and the first frost in high altitude areas 3. The productivity of forage corn, which is the most efficient crop for capturing solar energy, varied significantly with the climate circumstances but the productivity of Taekwallyong showed similar results of 19 M/T/ha, compared with 20 M/T/ha in Suwon from the '96-'98 study 4. Rye could be cultivated in high altitude areas and when corn was raised as a second crop after rye in the same year, it was possible to increase the productivity of dry matter yield by 20% through double cropping(P < 0.05). (Key words : Cropping system, Corn, Rye, Forage production)

  • PDF

조선소 판넬라인의 최적 생산계획 수립을 위한 생산 시뮬레이션 연구 (A Study of Product Simulation for Establishing the Optimal Production Scheduling of the Panel line in a Shipyard)

  • 박주용;김세환;최우현
    • Journal of Welding and Joining
    • /
    • 제24권5호
    • /
    • pp.62-66
    • /
    • 2006
  • Panel line is an important process occupying the largest work amount in shipbuilding. In this research product simulation has been carried out to establish the optimal production scheduling. For this purpose a web-based panel line simulator was developed using an object modeling technology and C# language. The balance of work-load and increase in the productivity by the improvement of production facilities and process are the key factors for a good scheduling. In this study SPRT(Shortest Remaining Process Time) rule was applied for the work-load balancing and a good result achieved. To increase the productivity in the stiffener welding stage which is a bottleneck; process, more welding heads and higher welding speed were tested using the developed simulator. The simulation results showed that either more welding head or higher welding speed decreased the total work time. Use of both, however, deteriorated the productivity because of the bottleneck in the following stage. This result points out that the improvement of production facilities and/or process should be evaluated with their influences on the leading and following processing stage.

Membrane Cell Recycle Fermentor에 의한 에탄올 연속 발효 (Continuous Ethanol Fermentation Using Membrane Cell Recycle Fermentor)

  • 김태석;이석훈;손석민;권윤중;변유량
    • 한국미생물·생명공학회지
    • /
    • 제19권4호
    • /
    • pp.419-427
    • /
    • 1991
  • 에탄올의 발효 생산성을 높이기 위해서는 발효조의 균체농도를 높여 고농도의 배양을 해야하며 또한 에탄올에 의한 저해 작용을 감소시켜 비생산성을 향상시키기 위해서는 발효액 중에 축적되는 에탄올을 배출 시킬 필요가 있다. 이와 같은 목적으로 본 연구에서는 고분자 hollow fiber membrane, ceramic filter를 이용하여 가장 중요한 조작 변수인 희석율과 bleed stream ratio가 에탄올 생산성에 미치는 영향 및 조작의 문제점과 장기 조업 가능성을 검토하였다.

  • PDF

지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구 (A study on the safety improvement and productivity's increase through continuous preventive maintenance)

  • 양두진;이창호
    • 대한안전경영과학회지
    • /
    • 제7권1호
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.