• Title/Summary/Keyword: productivity

Search Result 10,680, Processing Time 0.035 seconds

The Mediating Effect of Profitability and Activity on the Relationship between Productivity and Stock Return (생산성과 주가수익률의 관계에서 수익성과 활동성의 매개효과)

  • Ji, Chang-Soo;Oh, Sang-Hoon;Lee, Sang-Ryul
    • Asia-Pacific Journal of Business
    • /
    • v.11 no.2
    • /
    • pp.189-206
    • /
    • 2020
  • Purpose - The purpose of this study is to clarify the mediating effect of profitability and activity in the relationship between productivity and stock return, assuming that the productivity of the company will affect share prices with the parameters of profitability and activity. Design/methodology/approach - The study extracted productivity indicators, profitability indicators, activity indicators, and share price-related indicators from 1999 to 2018 of non-financial enterprises listed on the securities market, and then classified them into three factors: productivity (labor productivity LP, capital productivity CP), activity (TT), and profitability (net profit rate NI, operating profit ratio OI) through the factor analysis method, and analyzed the impact of each factor on the stock return through steps 1 to 3. Findings - The regression analysis shows that productivity has a significant positive effect on the stock return through the full mediating effect of profitability and activity. Research implications or Originality - In a situation where the relationship between productivity and profitability is not clear, this study is meaningful in that it has empirically analyzed that productivity has a positive effect on the stock return by mediating effects of profitability and activity.

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

A Comparison of Methods for Estimating the Productivity of Zostera marina

  • Park, Sang-Rul;Li, Wen-Tao;Kim, Seung-Hyeon;Kim, Jae-Woo;Lee, Kun-Seop
    • Journal of Ecology and Environment
    • /
    • v.33 no.1
    • /
    • pp.59-65
    • /
    • 2010
  • Because seagrass production significantly contributes to the biodiversity and production of coastal and estuarine ecosystems, accurate estimation of seagrass productivity is a critical step toward understanding the ecological roles of seagrass in these ecosystems. To develop an accurate and effective method of measuring seagrass productivity, we estimated leaf productivity of eelgrass (Zostera marina) on the southern coast of Korea using three methods, the conventional leaf marking method, the elongation-mass method (Short '87 method), and the plastochrone method. In each season, shoots were pierced through the bundle sheath using a hypodermic needle and were collected after 2-4 weeks had elapsed to estimate their productivity. The leaf elongation and the leaf plastochrone intervals varied significantly among seasons. On an annual basis, the conventional leaf marking method showed the lowest leaf productivity estimates compared to the elongation-mass method and the plastochrone method, suggesting that the conventional leaf marking method underestimated leaf productivity as it ignored leaf maturation processes and new leaf growth within the sheath. Since the elongation-mass method considered leaf maturation processes, this method produced higher leaf productivity estimates than the conventional leaf marking method. On an annual basis, the plastochrone method produced the highest leaf productivity estimates. Below-ground productivity, which can be easily estimated using the plastochrone method, ranged between 3.29 and 5.73 (mg dry weight $shoot^{-1}\;day^{-1}$) and accounted for about 17.8% to 30.3% of total productivity. Because of the high contributions of below-ground productivity to total seagrass production, we suggest that the plastochrone method is an effective and simple technique for assessing both above- and below-ground productivities.

WBS Development for Acquisition and Analysis of public Housing Productivity Data (공동주택 생산성 데이터 수집/분석을 위한 WBS 개발)

  • Kim, Jae-Woo;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.86-94
    • /
    • 2008
  • Productivity is one of key management indexes for evaluating soundness of a manufacturing organization and its efficiency. In many aspects of productivity management in the construction industry, however, intuition of an experienced field manager still plays a greater role while productivity data is not utilized efficiently for the construction management purposes, because the collection and analysis of the productivity-related information are not systematic. Lack of systematic method in collecting and analyzing the productivity data results in such problems. The existing WBS should therefore be improved to solve them. The authors developed a new WBS for productivity data collection and analysis by following the research direction that was determined by literature reviews, overseas cases, and interviews with field engineers. The new breakdown structure was then evaluated for its feasibility as a productivity analysis framework. It is expected that the productivity data collected by the WBS will be used for OLAP and mining for future productivity forecast.

Public hospitals and Private hospitals analysis of productivity differences (공공병원과 민간병원의 생산성에 관한 차이 분석)

  • Lee, Jin-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7885-7892
    • /
    • 2015
  • This study public hospital productivity and private hospitals, comparative analysis was divided into capital productivity, labor productivity, value-added productivity, based on the findings public hospitals are able to ensure the public interest to provide stable and profitable health services of good quality. It proposes measures to improve productivity. Investigation period were based on the fiscal year 2013, the target of 39 public hospitals are private hospitals surveyed were selected for a total of 147 hospitals with 108. ANOVA analysis was performed the analysis, hierarchical regression analysis. In the conclusions showed as the most important factor in the profitability of labor productivity, the productivity of public hospitals variables, because exert a significant impact on the productivity and efficiency of future public hospitals are required to establish an effective personnel management system. It should also Productivity and specific assessment of the effective management be analyzed by the association between the margins would have to be.

An evaluation of local waters productivity by operating types (운영형태별 수도사업 생산성 평가)

  • Kim, Shang-Moon;Lee, Ik-Gyu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.3
    • /
    • pp.325-334
    • /
    • 2011
  • Market Environment around water work industry is rapidly changing. ISO, International Organization for Standardization, announced the international water work service standard for comparison and evaluation between nations and businesses. And developed countries in water work are introducing market principle for growth of nation's water industry and reinforcement of its competitiveness. Also, some local governments entrusted their water utilities for improvement of competitiveness of water work. However, as some failure cases from overseas came out with emphasis, there are many refuting perspective about entrusted operation achievements of domestic water market. Hence, this paper evaluated competitiveness of domestic local water utilities from the perspective of productivity. After evaluating productivity using Malmquist productivity index, the authors compared and analyzed whether there is a difference of productivity between two different operating types by using Mann-Whitney test. As a result of analysis, it has shown that local water utilities achieved higher productivity at entrusted operation type rather than direct operation type. The local water utilities which chose entrusted operation had increased the productivity 13.9% on total factor productivity(TFP) during experimenting period, while the local water utilities which chose direct operation had increased 0.2%. The background of achieving this high productivity in entrusted operation was analyzed as a result of the higher technological effectiveness of a special water company. The result of this study can be referred when local government needs to decide on what operating types they will use.

A Comparative Study on Productivity of the Single PPM Quality Certification Company by using the Bootstrapped Malmquist Productivity Indices (부트스트랩 맘퀴스트 생산성지수를 이용한 Single PPM 인증기업의 생산성 비교 연구)

  • Song, Gwang-Suk;Yoo, Han-Joo
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.2
    • /
    • pp.261-275
    • /
    • 2010
  • The purpose of this study is to empirically analyze the productivity change of the 10 Single PPM Certification Company in the 3 Industry(Electronics, Motor-Parts, Machines). In this study, Productivity change over the time in Korean small and medium sized firms in the 3 industries by the bootstrapped Malmquist Productivity Index(MPI). The traditional Malmquist Productivity Index(MPI) and Data Envelopment Analysis(DEA) Models have not only bias but also lack statistical confidence intervals. they could lead to wrong evaluations of the efficiency and productivity scores. In this paper, DEA and a MPI are combined with a bootstrap method in order to provide statistical inferences that analyze the performance of the Single PPM Certification Company. The data cover the period between 2004 and 2007. The result of this paper reveals : 1) The Electronics Industry had productivity effect of 17%, but there was not direct effect for other Industries(Motor-Parts, Machines). 2) average productivity Progress of the 7DMU(Electronics), 1DMU(Motor-Parts) and none(Machines).

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

Forecasting of Port Productivity to Response Very Large Container Ship (초대형 컨테이너선 기항에 대응하는 항만생산성 예측)

  • Choi Yong-Seok;Ha Tae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.319-325
    • /
    • 2005
  • The objective of this paper is to forecast the port productivity of container terminal to response very large container ship. In general, the productivity of container terminal is evaluated by productivity of stevedoring system including container cranes, yard cranes, and yard tractors. Therefore, we analyzed the current productivity of container crane as port productivity in Pusan ports and forecast net productivity and gross productivity of container cranes to handle the containers cf very large container ship. In order to improve the productivity, we summarize alternatives of stevedoring system and operation system.

  • PDF

Alternative improvement policies of the value-added productivity in the manufacturing firms (제조업을 위한 부가가치생산성의 향상방안)

  • 유인선
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.41
    • /
    • pp.243-254
    • /
    • 1997
  • The fast changes of business environment make the enterprise filled with many problems which have to be solved. Productivity is a measure of the organizational performance, especially in manufacturing activities. The purpose of this paper is to measure the value-added productivity of the firms, to identify the characteristics and the relationship between key variables which affect the value-added productivity and also to study the alternative policies of productivity improvement elements which increase productivity effectiveness.

  • PDF