모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출 (Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction)

  • 김민주;이동민;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 - (Development of the procurement system for Just-in-Time Building Construction)

  • 신봉수;김창덕
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.235-244
    • /
    • 2004
  • 도심지의 대형 공사를 그것도 짧은 공기 내에 수행함에 있어 가장 중요한 과제로 부각되는 것은 건설 주요 자원의 효율적인 관리이다. 즉 자재, 인원, 장비 등의 적기적소 조달이 주요 관리 항목이 되고 있다. 또한, 자원의 적기적소 조달을 위한 생산 단계별 생산주체간의 효율적인 정보의 교환은 성공적인 공사 수행에 절대적인 영향을 끼치게 된다. 따라서 이러한 정보를 효율적으로 관리하여 주요 자원을 조달, 운반, 양중, 적치, 설치 각 단계별로 관리할 수 있도록 하는 주요 자원 관리 시스템의 개발이 필수적이다 본 연구에서는 자동차 제조 산업 등 타 산업분야에서 성공적으로 사용된 적시생산의 기본적인 원리와 정보전달기법, 즉 간판시스템의 기본개념을 응용하여 건설프로젝트 자원정보관리시스템을 개발하였다. 또한, 이 시스템을 콘크리트 타설 공사에 적용하였다. 현장의 콘크리트 공사 흐름을 분석한 후, 가치흐름맵핑(VSM)을 통해 정보관리 개선 후 개선모델(FSM)을 제시하고, 이를 실제 초고층주상복합 건물현장의 자원정보관리에 적용하였다. 또한 현장 적용 시 도출된 적용성 등 문제점을 보완하여, 시스템의 추후 사용성을 제고하였다.

Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향 (The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site)

  • 이상혁;임명복;이재성;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.341-344
    • /
    • 2003
  • 도심지내 대형화, 고층화 공사에서는 증가하는 자재의 종류와 양에 비해 한정된 공간과 장비의 제한 등의 문제로 효용성 제고가 요구되고 있어 물류관리의 중요성이 강조되어지고 있다. 이러한 제약들로 인해 공사비 증대, 공기지연, 생산성 저하, 안전사고 발생 등의 문제를 야기 할 수 있다. 이러한 현장 내 물류관리의 문제점들을 해결하기 위하여 적시생산(just-in-time. 이하JIT)관리개념에 대한 관심이 높아지고 있으며 건설자재의 기존 물류흐름 프로세스를 개선한 양중 및 조달의 다양한 시도가 이루어지고 있다. 현재 콘크리트와 같은 주요 자재의 JIT적용 연구는 이미 많은 연구와 수행이 진행이 되고 있으나 마감자재에 대한 연구는 아직 미비하다 하겠다. 이에 커튼월과 더불어 주요 마감자재라 할 수 있는 유리, 그중 Low-emissivity 복층유리(이하 Low-e 유리)를 적용하여 현재의 물류관리 흐름 파악과 JIT관리 적용시 발생하는 효과와 양중조달 시스템 개발방향을 제시하는 것이다.