• Title/Summary/Keyword: process measurement

Search Result 5,167, Processing Time 0.037 seconds

QUALITY IMPROVEMENT OF VEHICLE DRIFT USING STATISTICAL SIX SIGMA TOOLS

  • PARK T. W.;SOHN H. S.
    • International Journal of Automotive Technology
    • /
    • v.6 no.6
    • /
    • pp.625-633
    • /
    • 2005
  • Vehicle drift was reduced using statistical six sigma tools. The study was performed through four steps: M (measure), A (analyze), I (improve), and C (control). Step M measured the main factors which were derived from a fishbone diagram. The measurement system capabilities were analyzed and improved before measurement. Step A analyzed critical problems by examining the process capability and control chart derived from the measured values. Step I analyzed the influence of the main factors on vehicle drift using DOE (design of experiment) to derive the CTQ (critical to quality). The tire conicity and toe angle difference proved to be CTQ. This information enabled the manufacturing process related with the CTQ to be improved. The respective toe angle tolerance for the adjustment process was obtained using the Monte Carlo simulation. Step C verified and controlled the improved results through hypothesis testing and Monte Carlo simulation.

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

Development of integrated Rule-based CAPP system for Mold Manufacturing and Inspection (금형가공 및 측정을 위한 통합 Rule-based CAPP 시스템 개발)

  • 윤길상;최진화;조명우;이홍희;서태일
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1235-1238
    • /
    • 2003
  • A rule-based CAPP(computer aided process planning) system is proposed in this research to develop integrated manufacturing process of machining and inspection using OMM(On-Machine Measurement) device. Generally workpiece composed of many primitive form features. This features are determined optimum inspection sequence by analyzing the feature information such as features-relationship, probe approach direction and etc. Proposed paper is more efficient method of CAIP(computer aided inspection planning) considered machining process

  • PDF

EM Coupling Effect of sprint inductors by isolation methode in standard CMOS process (Spiral 인덕터 간 격리방법에 따른 Electromagnetic 커플링 효과)

  • Choi, Moon-Ho;Kim, Han-Seok;Jung, Sung-Il;Kim, Yeong-Seuk
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.91-92
    • /
    • 2005
  • The electromagnetic coupling effect in standard CMOS process is simulated and evaluated. EM coupling transfer characteristic between planar spiral inductors by isolation methode in standard CMOS have simulated and measured. Measurement results show that suppression of EM coupling effect by ground guardring. The evaluated structures are fabricated 1P5M(one poly, five metal) 0.25um standard CMOS process. These measurement results provide a isolation design guidelines in standard CMOS process for Rf coupling suppression.

  • PDF

Enhancement of Dielectric Properties of Pb(La,Ti)$O_3$ Thin Films Using Two-step Process (Two-Step Process를 이용한 Pb(La,Ti)$O_3$ 박막의 유전특성 향상 연구)

  • Hur, Chang-Hoi;Lee, Sang-Yeol
    • Proceedings of the KIEE Conference
    • /
    • 2000.11c
    • /
    • pp.416-418
    • /
    • 2000
  • Thin films of phase-pure perovskite $(Pb_{0.72}La_{0.28})Ti_{0.93}O_3$ (PLT) were deposited in-situ onto Pt/Ti/$SiO_2$/Si substrates by pulsed laser deposition. We have systematically investigated the variation of grain sizes depending on the process condition. Both in-situ annealing and ex-situ annealing treatments have been compared depending on the annealing time. The grain sizes of PLT thin films were successfully controlled 260 to 350 nm by changing process parameters. Microstructural and electrical properties of the film were investigated by C-V measurement, leakage current measurement and SEM. Two-step process to grow $(Pb_{0.72}La_{0.28})Ti_{0.93}O_3$ (PLT) films was adopted and verified to be useful to enlarge the grain size of the film and to enhance the leakage current characteristics.

  • PDF

A Novel OLED Inspection Process Method with Simultaneous Measurement for Standard and Deposition Pattern (기준패턴과 증착패턴의 동시 측정을 통한 OLED 공정 검사 방법)

  • Kwak, Byeongho;Cheoi, Kyungjoo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.15 no.4
    • /
    • pp.63-70
    • /
    • 2019
  • The subject of the simultaneous measuring system of base pattern and deposition pattern is a new research topic on a defect inspection of OLED. In this paper, we propose a new OLED inspection method that simultaneously measures standard and deposition pattern images. This method reduces unnecessary processes and tac time during OLED inspection. For an additional reduction of the tac time during pattern measurement, the ROI was configured to measure only in the designated ROI area instead of measuring the entire area of an image. During the ROI set-up, the value of effective deposition pattern area is included so that if the deposition pattern is out of the ROI zone, it would be treated as a defect before measuring the size and center point of the pattern. As a result, the tac time and inspection process could be shortened. The proposed method also could be applied to the OLED manufacturing process. Production of OLED could be increased by reducing tac time and inspection process.

In-Process Diagnosis of Servovalve Wear using Leakage Flow Measurement (누설 유량 계측에 의한 서보밸브 마멸의 인-프로세스 진단)

  • Kim K.H.;Han G.S.;Lee J.C.;Ham Y.B.;Kim S.D.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.1 no.2
    • /
    • pp.1-7
    • /
    • 2004
  • In-process diagnosis is essential to achieve predictive maintenance in industrial plants. An in- process diagnosis method was proposed for hydraulic servo systems, which was based upon leakage flow measurement. Leakage due to servovalve wear was analysed and modeled mathematically far computer simulation work. The key idea of diagnosis algorithm is that when monitoring signals, such as servovalve input and load displacement are in steady states, the return-line flow of hydraulic servo systems can be regarded as null-leakage of servovalve. Virtual experiments were performed to ensure effectiveness of the proposed diagnosis method.

  • PDF

Real-time Risk Measurement of Business Process Using Decision Tree (의사결정나무를 이용한 비즈니스 프로세스의 실시간 위험 수준 측정)

  • Kang, Bok-Young;Cho, Nam-Wook;Kim, Hoon-Tae;Kang, Suk-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.49-58
    • /
    • 2008
  • This paper proposes a methodology to measure the risk level in real-time for Business Activity Monitoring (BAM). A decision-tree methodology was employed to analyze the effect of process attributes on the result of the process execution. In the course of process execution, the level of risk is monitored in real-time, and an early warning can be issued depending on the change of the risk level. An algorithm for estimating the risk of ongoing processes in real-time was formulated. Comparison experiments were conducted to demonstrate the effectiveness of our method. The proposed method detects the risks of business processes more precisely and even earlier than existing approaches.

Degradation Measurement from Electrical Tree Image Using Foreground Object Extracting Skill (전경 물체 추출 기법을 이용한 전기트리 영상에서 열화 측정)

  • 김형균;정기봉;고석만;오무송;김태성
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.11a
    • /
    • pp.270-273
    • /
    • 2001
  • Electrical tree is studied widely by manufacture state of insulating material fare and blazing fire diagnosis system of use in phenomenon of part discharge that happen for main cause of dielectric breakdown of equipment for electric power. Use process that draw tree pattern here measuring above zero to study special quality of this electricity tree, real-time processing by image processing is proposed because reproduction of tree blazing fire process drops and pattern of tree is difficult correct quantification of tree growth by existent visual observation by involution. This research presents general process that need in image processing of tree blazing fire, and that remove various noises that happen in above zero by measuring electrical tree dividing background and complete view in measured above zero taking advantage of specially proposed complete view object abstraction techniques effectively and quantification of tree becomes easy naturally, can apply to dielectric breakdown estimate because can chase growth process of tree.

  • PDF

Discussion of Problems During the Application of the On-line Particle Counter In Water Treatment Process (정수처리 공정에서 연속식 입자계수기의 적용성 검토에 관한 연구)

  • Moon, Seong-Yong;Kim, Seung-Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.2
    • /
    • pp.214-220
    • /
    • 2005
  • Errors may occur due to analysis methods and water quality during the application of the on-line particle counter In water treatment process. Errors caused by analysis methods include particle destruction by shear force due to inflow speed and tube friction, as well as interruption by screening, bubbles and contaminants. Since errors happen frequently because of these factors, it is necessary to examine and evaluate such errors during the application of a particle counter. Errors can be large due to screening and bubbles. Measurement values are effective for water analysis after filtration process. However, because of screening, only measurement values for particles above $7{\mu}m$ are valid for water with a turbidity between 3-10NTU. As particle numbers around $10{\mu}m$ increase a lot after ozone treatment, sufficient pretreatment process is necessary. Physical conditions should keep stable for inflow to decrease errors caused by shear force.