• Title/Summary/Keyword: process management system

Search Result 7,329, Processing Time 0.032 seconds

A Study on Process-driven Standardization in Manufacturing Industries (제조업종의 표준 업무프로세스 개발 연구)

  • 김훈태;정한일;한정우;양은찬;임춘성
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.277-288
    • /
    • 2001
  • Nowadays, for the competitive power of an enterprise, there are many attempts to implement information system that could support business innovation by business process re-engineering. However, there is no effort to standardize the core business processes of enterprise based on standards of data, documents. These facts make it difficult to introduce and implement enterprise information system designed by business processes of the higher level. Therefore, standardization of business process by analyzing the functionality and relationships among them are important and necessary. The results of our research are summarized as process-driven standardization (standardization of core business processes) and development of a repository. In process-driven standardization, we proposed the reference model by analyzing the business processes of the leading enterprises for core business processes. The reference model focuses on core business processes, such as sales management, procurement management, production management, logistics management, and customer support in manufacturing industry. We developed a knowledge-based system as a repository for a integrated management system of business process. And this repository was built up web-based system for the purpose of both reference and management.

  • PDF

A Case Study on the Application of Configuration Management Process for the Development of High-Safety Railway Signaling System Based on International Standards (국제표준기반의 고안전성 철도신호시스템 개발을 위한 형상관리프로세스 적용사례 연구)

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.108-115
    • /
    • 2019
  • The activities of managing and controlling the configuration of a system component over its life cycle are critical tasks in developing a high safety system as well as general system development. These configuration management activities should be defined through the management plan at the beginning of the life cycle, and should be performed continuously and systematically until the end of the project after the system or product development is completed. In this study, the configuration management process applied in the development of high safety railway signaling system was introduced and an efficient application proposals of it was proposed. In particular, configuration management through the establishment of a configuration management system based on computer tools is one of the important activities of maintaining the configuration integrity of the system or product.

Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

A Study on Management Performance by ISO/TS 16949 Quality Management System Certification (ISO/TS16949 품질경영시스템 인증에 따른 경영성과에 관한 연구)

  • Park, Jong-Young;Hong, Jung-Eui;Kim, Kwang-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.269-288
    • /
    • 2009
  • After enterprise get a certification in acquisition, the core requirements of ISO/TS 16949 standard is pull out the Performance Indicators by process access approach during the settlement and operation of system, and the pulled key performance indicators classified into the customer intention process, support process and management process and analyzed the effect to the management result. This study conducted with following step. Firstly, preceding research, the literature and investigation analysis about process approach method which is the special characteristics of ISO/TS 16949 standard. Secondly, each process of ISO/TS 16949 standard is classified and deduced the key performance indicators followed process access method. Finally, get a enterprise survey data related to improvement of Performance Indicator and analyzed by SPSS statistical software.

  • PDF

A Study on Management Performance by ISO/TS 16949 Quality Management System Certification (ISO/TS16949 품질경영시스템 인증에 따른 경영성과에 관한 연구)

  • Park, Jong-Young;Hong, Jung-Eui;Kim, Kwang-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.3
    • /
    • pp.227-237
    • /
    • 2009
  • After enterprise get a certification in acquisition, the core requirements of ISO/TS 16949 standard is pull out the Performance Indicators by process access approach during the settlement and operation of system, and the pulled key performance indicators classified into the customer intention process, support process and management process and analyzed the effect to the management result. This study conducted with following step. Firstly, preceding research, the literature and investigation analysis about process approach method which is the special characteristics of ISO/TS 16949 standard. Secondly, each process of ISO/TS 16949 standard is classified and deduced the key performance indicators followed process access method. Finally, get a enterprise survey data related to improvement of Performance Indicator and analyzed by SPSS statistical software.

A Study on Process Management Method of Offshore Plant Piping Material (해양플랜트 배관재 공정관리 방법에 관한 연구)

  • Park, JungGoo;Woo, JongHun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.2
    • /
    • pp.124-135
    • /
    • 2018
  • In order to secure manufacturing competitiveness of offshore plants, piping process is one of the most important processes. This study is about the design of management system for piping materials manufacturing of the offshore plant. As a result of the study, we analyzed the system and algorithms needed for the processing of piping material products and designed the structure of the entire management system. We conducted a process analysis of the design, manufacturing and installation processes. And also we proposed a system structure to improve the various problems that have come out. We also proposed an algorithm to determine the delivery order of the pipe spools, and proposed a raw material management system for the manufacturing of the pipe spools. And we designed a manufacturing process management system to manage the risk of pipe materials delivery. And finally we proposed a data structure for the installation process management system. The data structures and algorithms were actually implemented, and applied the actual process data to verify the effect of the system.

Design of Process Support System based on CMMI (CMMI 기반 프로세스 지원 시스템 설계)

  • Choi, Dong-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.3
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

Development of Shoes Process Management Monitoring System for Supporting SCM Using LabVIEW (LabVIEW를 이용한 SCM 지원 신발 공정관리 모니터링 시스템 개발)

  • Lee Byung Woo;Kim Chang Dong;Lee Young Jin;Go Seok Jo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.6 s.171
    • /
    • pp.135-143
    • /
    • 2005
  • The shoes process management monitoring system for supporting SCM is developed in this study. This system consists of a monitoring program, a conveyer system, a pneumatic unit, a controller, an USB camera, and a server and a client computer. To operate the developed system easily, the monitoring program using LabVIEW in the Windows environment is developed. This program consists of 5 modules: production management, inventory control, media management, defective management, and communication management. The developed system has several advantages: reduced time for managing process work, decreased labor costs, effective operation, and continuous work without an operator. Nowadays advanced manufacturing companies are trying to find a way to check the performance of their production equipments and plants from remote sites. Thus, to manage the developed system from remote sites, communication network is constructed. In order to evaluate the performance of the monitoring system, experiments were performed. The experimental results showed that the developed system provided a reliable performance and a stable communication.

The LIS with the Kernel of the Process Management

  • Yong, He;Zhong, Chen
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.2
    • /
    • pp.34-38
    • /
    • 2009
  • Based on the design of the LIS of GuangZhou and BeiJing, this paper discusses the resolution of the LIS with the kernel of process management. It applies the idea of workflow in the management supporting stratum, applies the process-oriented mechanism in the definition, coordination, supervision and control of the management process. The scheme has the character of information-media-oriented, work process dynamic changing supported, application system extended and restructure supported and is independent of the running environment of specific work.. Due to the previous character, the LIS is flexible, useable, elastic and able to support the dynamic application.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF