• 제목/요약/키워드: process management system

검색결과 7,285건 처리시간 0.039초

제조업종의 표준 업무프로세스 개발 연구 (A Study on Process-driven Standardization in Manufacturing Industries)

  • 김훈태;정한일;한정우;양은찬;임춘성
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2001년도 International Conference CALS/EC KOREA
    • /
    • pp.277-288
    • /
    • 2001
  • Nowadays, for the competitive power of an enterprise, there are many attempts to implement information system that could support business innovation by business process re-engineering. However, there is no effort to standardize the core business processes of enterprise based on standards of data, documents. These facts make it difficult to introduce and implement enterprise information system designed by business processes of the higher level. Therefore, standardization of business process by analyzing the functionality and relationships among them are important and necessary. The results of our research are summarized as process-driven standardization (standardization of core business processes) and development of a repository. In process-driven standardization, we proposed the reference model by analyzing the business processes of the leading enterprises for core business processes. The reference model focuses on core business processes, such as sales management, procurement management, production management, logistics management, and customer support in manufacturing industry. We developed a knowledge-based system as a repository for a integrated management system of business process. And this repository was built up web-based system for the purpose of both reference and management.

  • PDF

국제표준기반의 고안전성 철도신호시스템 개발을 위한 형상관리프로세스 적용사례 연구 (A Case Study on the Application of Configuration Management Process for the Development of High-Safety Railway Signaling System Based on International Standards)

  • 최요철
    • 시스템엔지니어링학술지
    • /
    • 제15권2호
    • /
    • pp.108-115
    • /
    • 2019
  • The activities of managing and controlling the configuration of a system component over its life cycle are critical tasks in developing a high safety system as well as general system development. These configuration management activities should be defined through the management plan at the beginning of the life cycle, and should be performed continuously and systematically until the end of the project after the system or product development is completed. In this study, the configuration management process applied in the development of high safety railway signaling system was introduced and an efficient application proposals of it was proposed. In particular, configuration management through the establishment of a configuration management system based on computer tools is one of the important activities of maintaining the configuration integrity of the system or product.

Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축 (Web 2.0 Cluster based Process and Performance Management System Modeling)

  • 안재규;옹호경;김대영
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.892-898
    • /
    • 2007
  • 본 연구는 중소(지방)건설업체의 효율적인 공정관리와 국내 건설 산업의 성과관리를 위한 시스템 구축을 목적으로 한다. 린 건설의 공정관리 프로세스를 탑재한 시스템은 Web 2.0 플랫폼을 기반으로 프로젝트에 참여한 수많은 원도급업체와 협력업체의 클러스터를 생성하여 상호 유기적인 공정관리를 가능하게 할 것이다. 또한 프로젝트 진행 중 발생되는 수많은 데이터를 수집/축적하여 프로젝트가 진행 중이거나 종료 된 후 이를 분석하여 프로젝트의 성과관리에 대한 비교가 가능 할 것이다. 이러한 성과관리 사례들은 차후 실행되는 유사한 프로젝트의 공정계획에도 도움이 될 것이다. 본 연구의 기대효과는 Web을 통한 공정관리로 인해 국내 중소(지방)건설업체가 느끼는 복잡한 공정관리 및 시스템 구축에 따른 부담감을 조금이나마 덜어 줄 것이며, 데이터베이스에 축적되는 방대한 양의 신뢰도 높은 데이터로 보다 정확한 성과관리를 할 것으로 기대된다. 그리고 더 나아가 공정관리뿐만 아니라 설계, 감리, CM 등 폭 넓은 데이터베이스 구축을 통해 건설산업의 경쟁력 향상에도 기여 할 것이다.

  • PDF

ISO/TS16949 품질경영시스템 인증에 따른 경영성과에 관한 연구 (A Study on Management Performance by ISO/TS 16949 Quality Management System Certification)

  • 박종영;홍정의;김광수
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2009년도 추계학술대회
    • /
    • pp.269-288
    • /
    • 2009
  • After enterprise get a certification in acquisition, the core requirements of ISO/TS 16949 standard is pull out the Performance Indicators by process access approach during the settlement and operation of system, and the pulled key performance indicators classified into the customer intention process, support process and management process and analyzed the effect to the management result. This study conducted with following step. Firstly, preceding research, the literature and investigation analysis about process approach method which is the special characteristics of ISO/TS 16949 standard. Secondly, each process of ISO/TS 16949 standard is classified and deduced the key performance indicators followed process access method. Finally, get a enterprise survey data related to improvement of Performance Indicator and analyzed by SPSS statistical software.

  • PDF

ISO/TS16949 품질경영시스템 인증에 따른 경영성과에 관한 연구 (A Study on Management Performance by ISO/TS 16949 Quality Management System Certification)

  • 박종영;홍정의;김광수
    • 대한안전경영과학회지
    • /
    • 제11권3호
    • /
    • pp.227-237
    • /
    • 2009
  • After enterprise get a certification in acquisition, the core requirements of ISO/TS 16949 standard is pull out the Performance Indicators by process access approach during the settlement and operation of system, and the pulled key performance indicators classified into the customer intention process, support process and management process and analyzed the effect to the management result. This study conducted with following step. Firstly, preceding research, the literature and investigation analysis about process approach method which is the special characteristics of ISO/TS 16949 standard. Secondly, each process of ISO/TS 16949 standard is classified and deduced the key performance indicators followed process access method. Finally, get a enterprise survey data related to improvement of Performance Indicator and analyzed by SPSS statistical software.

해양플랜트 배관재 공정관리 방법에 관한 연구 (A Study on Process Management Method of Offshore Plant Piping Material)

  • 박중구;우종훈
    • 대한조선학회논문집
    • /
    • 제55권2호
    • /
    • pp.124-135
    • /
    • 2018
  • In order to secure manufacturing competitiveness of offshore plants, piping process is one of the most important processes. This study is about the design of management system for piping materials manufacturing of the offshore plant. As a result of the study, we analyzed the system and algorithms needed for the processing of piping material products and designed the structure of the entire management system. We conducted a process analysis of the design, manufacturing and installation processes. And also we proposed a system structure to improve the various problems that have come out. We also proposed an algorithm to determine the delivery order of the pipe spools, and proposed a raw material management system for the manufacturing of the pipe spools. And we designed a manufacturing process management system to manage the risk of pipe materials delivery. And finally we proposed a data structure for the installation process management system. The data structures and algorithms were actually implemented, and applied the actual process data to verify the effect of the system.

CMMI 기반 프로세스 지원 시스템 설계 (Design of Process Support System based on CMMI)

  • 최동희
    • 한국군사과학기술학회지
    • /
    • 제12권3호
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

LabVIEW를 이용한 SCM 지원 신발 공정관리 모니터링 시스템 개발 (Development of Shoes Process Management Monitoring System for Supporting SCM Using LabVIEW)

  • 이병우;김창동;이영진;고석조
    • 한국정밀공학회지
    • /
    • 제22권6호
    • /
    • pp.135-143
    • /
    • 2005
  • The shoes process management monitoring system for supporting SCM is developed in this study. This system consists of a monitoring program, a conveyer system, a pneumatic unit, a controller, an USB camera, and a server and a client computer. To operate the developed system easily, the monitoring program using LabVIEW in the Windows environment is developed. This program consists of 5 modules: production management, inventory control, media management, defective management, and communication management. The developed system has several advantages: reduced time for managing process work, decreased labor costs, effective operation, and continuous work without an operator. Nowadays advanced manufacturing companies are trying to find a way to check the performance of their production equipments and plants from remote sites. Thus, to manage the developed system from remote sites, communication network is constructed. In order to evaluate the performance of the monitoring system, experiments were performed. The experimental results showed that the developed system provided a reliable performance and a stable communication.

The LIS with the Kernel of the Process Management

  • Yong, He;Zhong, Chen
    • 한국공간정보시스템학회 논문지
    • /
    • 제11권2호
    • /
    • pp.34-38
    • /
    • 2009
  • Based on the design of the LIS of GuangZhou and BeiJing, this paper discusses the resolution of the LIS with the kernel of process management. It applies the idea of workflow in the management supporting stratum, applies the process-oriented mechanism in the definition, coordination, supervision and control of the management process. The scheme has the character of information-media-oriented, work process dynamic changing supported, application system extended and restructure supported and is independent of the running environment of specific work.. Due to the previous character, the LIS is flexible, useable, elastic and able to support the dynamic application.

  • PDF

OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출 (Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction)

  • 전영훈;배병윤;윤원건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF