• 제목/요약/키워드: process delay

검색결과 1,576건 처리시간 0.03초

VDSM 공정에서 적용되는 RTL-to-GDS Methodology 검토 및 적용 (Review on RTL-GDS Methodology for VDSM Process)

  • 권오철;정길임;김주선;배점한
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2000년도 추계종합학술대회 논문집(2)
    • /
    • pp.132-135
    • /
    • 2000
  • We have been aware fer some time. that it is becoming harder to develop ASIC only, using the vendor wire model for the current top-down/bottom-up process. Because VDSM has a much bigger wired delay than cell delay, it is also difficult to reduce development time, as well as time-to-market, while developing several million gate ASIC's. The same is true for high frequency ASIC's with VDSM (which have larger wire delay versus cell delay). Therefore, a solution called “RTS-GDS”, using physical constraints fur SOC with timing met, is being actively discussed. This paper suggests a methodology for SOC development by utilizing a top down flow via CWLM along with discussing potential problems. This paper also provides a design flow, including physical synthesis, DFT, floor plan and CWLM, all of which are relevant to proper SOC development.

  • PDF

밀폐공간내 복사에 의한 고체연료 점화의 실험적 연구 (Experimental study of solid fuel ignition in a confined enclosure)

  • 김영관;백승욱
    • 대한기계학회논문집B
    • /
    • 제20권11호
    • /
    • pp.3630-3638
    • /
    • 1996
  • An experimental study has been conducted to explore the behaviors of the radiative ignition of polymethylmetacrylate(PMMA) in a confined enclosure such as the ignition delay time, PMMA surface temperature, the ignition location and the ignition process. In addition, the effects of hot wall orientation on the ignition delay and PMMA surface temperature were studied. When the hot wall is located at the bottom, ignition delay time is the shortest. Ignition surface temperature becomes the lowest for the hot top wall case. These are due to buoyancy effect. Since the radiative heat flux of hot wall is rather lower than laser source, the ignition is considered to be controlled by the mixing process. Therefore, the ignition location, where appropriate mixture of fuel and oxygen exists, occurs near the hot wall. The flame propagates along the hot wall where there exists sufficient oxygen.

조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안 (Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

RFID와 바코드가 적용된 검수작업의 대기비용 비교를 위한 시뮬레이션 (A Study on RFID and Bar-code System Simulations for Delay Time Cost in DC Inspection Process)

  • 박성미;김정자
    • 산업경영시스템학회지
    • /
    • 제30권4호
    • /
    • pp.111-117
    • /
    • 2007
  • Comparing with bar-code systems, RFID systems can supply more efficient work. Using RFID systems, logistic management systems could be helped effectively to gather real-time information. It's available to reduce the working time and object's delay time, and to deal with real-time information by using RFID system. Until now, based on how many pallets used, there is few study about best workload of RFID system. Therefore, in this study, both bar-code and RFID system simulations were executed for inspection process in distribution center. As a result, following the ware pallet quantity, the total cost of both working time and other delay times were calculated and the sensitivity analysis of total cost trend was executed.

계약공사기간 연장에 의한 클레임 처리방안 (A Study on the Delay Claim in Construction Projects)

  • 노병옥;이상범;이호일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.93-98
    • /
    • 2001
  • If the construction delays are occurred during the project execution, the contractual parties should inquire the delay causes and the contractual obligation. Due to the compensation of damages, the interested parties and the contractual parties are placed on the adverse situation. For reasonable of the claim and dispute, the contractual parties are needed the objective and systematic procedure method to analyze the delay. The purpose of this study is to propose a formal process model considering the case of construction delay-claims.

  • PDF

A robust design method for a long dead time system with an intergral mode

  • Ma, Jin-suk;Kim, sun-ja;Kwon, woo-hyen
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2002년도 ICCAS
    • /
    • pp.59.5-59
    • /
    • 2002
  • In this paper, we present a robust controller design method that can not only deal with the constant time delay plant but also an uncertain time delay one. For a constant time delay plant. The proposed DTC can independently adjust the set response and the disturbance response without any stability constraint. And in the uncertain time delay case, one can process the control design step with uncertainty norm bound. To verify real effectiveness, theoretical analysis and simulation results are given.

  • PDF

충격파관을 이용한 분무연료의 착화지연에 관한 연구 (A study on ignition delays of sprays using a shock tube)

  • 정진도;류정인;수곡행부
    • 오토저널
    • /
    • 제11권6호
    • /
    • pp.48-56
    • /
    • 1989
  • A shock tube technique was developed in which a freely falling droplets column produced by an ultrasonic atomizer was ignited behind reflected shock. In the present study, the effects of turbulent mixing on the ignition delay of a cetane was decided, also, ignition process was investigated. For the purpose of disturbance of droplets column and mixing, authors installed turbulent lattice in shock tube. Usually, the ignition delay is so called Arrhenius plot which found break point in the Arrhenius plot on the high temperature side. The rate of misfiring increased rapidly below 1080K, but ignition took place from 838k and luminous flame was seen to spread over the whole section by turbulent lattice. Length, from end plate to turbulent lattice, was varied with 60,40,20mm. Also, ignition process was detected by Photo transistor. As a result, it was found that physical factors changed ignition delay greatly and turbulent mixing had a considerable effects in the ignition process.

  • PDF

The effect of the MgO process on the properties of AC-PDPs

  • Kim, Young-Sung;Park, Min-Soo;Ryu, Byung-Gil
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2007년도 7th International Meeting on Information Display 제7권2호
    • /
    • pp.1376-1379
    • /
    • 2007
  • The effects of the MgO fabrication process on the properties of AC-PDPs were examined. MgO films were deposited by e-beam evaporation with various substrate temperatures and oxygen flow rates. MgO films were analyzed by XRD, CL and ellipsometer. Panel properties such as luminance, efficiency, discharge voltage and discharge delay time were measured with test panels. MgO films with higher temperature, smaller oxygen flow rate showed shorter discharge delay time. Also they showed smaller XRD peak intensity. These results revealed that the discharge delay time was strongly influenced by temperature and oxygen flow rate of the MgO fabrication process.

  • PDF

On order determination in identification of closed-loop systems

  • Oura, Kunihiko;Akizuki, Kageo;Hanazaki, Izumi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1995년도 Proceedings of the Korea Automation Control Conference, 10th (KACC); Seoul, Korea; 23-25 Oct. 1995
    • /
    • pp.480-483
    • /
    • 1995
  • Identification of a process in closed-loop control system is an important problem in practice. This paper deals with parameter estimation using input-output data of the process operating in a closed-loop system. It is necessary to determine orders and delay-time to get consistent estimators by least square method for input-output data collected from the process. The authors considered a problem to determine delay-time in the condition that orders were known, in last KACC. So we extend the range to determine orders and delay-time in this paper.

  • PDF

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

  • 조태제;최종수
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.9-17
    • /
    • 2011
  • 건설프로젝트에서 공기지연은 공정 및 공사비 관리 측면에서 핵심 관리사항에 해당된다. 본 연구는 아파트 건설공사에서 직접비의 상당부분을 차지하는 골조공사를 대상으로 공사부위별 공기지연 수준을 분석하고 대책을 제시한 실증연구로 10개 현장의 공사비 비중분석 결과에 기반하여 골조공사에서 지연이 발생하는 부위의 순위, 원인 등을 분석하였다. 분석결과 1층 골조공사에서 가장 큰 지연이 발생하는 것으로 나타났으며 지연원인을 다양한 분류에 의거하여 분석하고 대책을 제시하였다.