• Title/Summary/Keyword: priority scheduling

Search Result 393, Processing Time 0.023 seconds

Customizable Global Job Scheduler for Computational Grid (계산 그리드를 위한 커스터마이즈 가능한 글로벌 작업 스케줄러)

  • Hwang Sun-Tae;Heo Dae-Young
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.7
    • /
    • pp.370-379
    • /
    • 2006
  • Computational grid provides the environment which integrates v 따 ious computing resources. Grid environment is more complex and various than traditional computing environment, and consists of various resources where various software packages are installed in different platforms. For more efficient usage of computational grid, therefore, some kind of integration is required to manage grid resources more effectively. In this paper, a global scheduler is suggested, which integrates grid resources at meta level with applying various scheduling policies. The global scheduler consists of a mechanical part and three policies. The mechanical part mainly search user queues and resource queues to select appropriate job and computing resource. An algorithm for the mechanical part is defined and optimized. Three policies are user selecting policy, resource selecting policy, and executing policy. These can be defined newly and replaced with new one freely while operation of computational grid is temporarily holding. User selecting policy, for example, can be defined to select a certain user with higher priority than other users, resource selecting policy is for selecting the computing resource which is matched well with user's requirements, and executing policy is to overcome communication overheads on grid middleware. Finally, various algorithms for user selecting policy are defined only in terms of user fairness, and their performances are compared.

Design and Implementation of Transmission Scheduler for Terrestrial UHD Contents (지상파 UHD 콘텐츠 전송 스케줄러 설계 및 구현)

  • Paik, Jong-Ho;Seo, Minjae;Yu, Kyung-A
    • Journal of Broadcast Engineering
    • /
    • v.24 no.1
    • /
    • pp.118-131
    • /
    • 2019
  • In order to provide 8K UHD contents of terrestrial broadcasting with a large capacity, the terrestrial broadcasting system has various problems such as limited bandwidth and so on. To solve these problems, UHD contents transmission technology has been actively studied, and an 8K UHD broadcasting system using terrestrial broadcasting network and communication network has been proposed. The proposed technique is to solve the limited bandwidth problem of terrestrial broadcasting network by segmenting 8K UHD contents and transmitting them to heterogeneous networks through hierarchical separation. Through the terrestrial broadcasting network, the base layer corresponding to FHD and the additional enhancement layer data for 4K UHD are transmitted, and the additional enhancement layer data corresponding to 8K UHD is transmitted through the communication network. When 8K UHD contents are provided in such a way, user can receive up to 4K UHD broadcasting by terrestrial channels, and also can receive up to 8K UHD additional communication networks. However, in order to transmit the 4K UHD contents within the allocated bit rate of the domestic terrestrial UHD broadcasting, the compression rate is increased, so a certain level of image deterioration occurs inevitably. Due to the nature of UHD contents, video quality should be considered as a top priority over other factors, so that video quality should be guaranteed even within a limited bit rate. This requires packet scheduling of content generators in the broadcasting system. Since the multiplexer sends out the packets received from the content generator in order, it is very important to make the transmission time and the transmission rate of the process from the content generator to the multiplexer constant and accurate. Therefore, we propose a variable transmission scheduler between the content generator and the multiplexer to guarantee the image quality of a certain level of UHD contents in this paper.

A Study on the Legal Proposal of Crew's Fatigue Management in the Aviation Regulations (항공법규에서의 승무원 피로관리기준 도입방안에 관한 연구 - ICAO, FAA, EASA 기준을 중심으로 -)

  • Lee, Koo-Hee;Hwang, Ho-Won
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.27 no.1
    • /
    • pp.29-73
    • /
    • 2012
  • Aviation safety is the State and industry's top priority and more scientific approaches for fatigue management should be needed. There are lately various studies and regulation changes for crew fatigue management with ICAO, FAA and EASA. ICAO issued the provisions of fatigue management for flight crew since 1st edition, 1969, of Annex 6 operation of aircraft as a Standards and Recommended practice(SARPs). Unfortunately, there have been few changes and improvement to fatigue management provisions since the time they were first introduced. However the SARPs have been big changed lately. ICAO published guidance materials for development of prescriptive fatigue regulations through amendment 33A of Annex 6 Part 1 as applicable November 19th 2009. And then ICAO introduced additional amendment for using Fatigue Risk Management System (FRMS) with $35^{th}$ amendment in 2011. According to the Annex 6, the State of the operator shall establish a) regulations for flight time, flight duty period, duty period and rest period limitations and b) FRMS regulations. The Operator shall implement one of following 3 provisions a) flight time, flight duty period, duty period and rest period limitations within the prescriptive fatigue management regulations established by the State of the Operator; or b) a FRMS; or c) a combination of a) and b). U.S. FAA recently published several kinds of Advisory Circular about flightcrew fatigue. U.S. passed "Airline Safety and FAA Extension Act of 2010" into law on August 1st, 2010. This mandates all commercial air carriers to develop a FAA-acceptable Fatigue Risk Management Plan(FRMP) by October 31st, 2010. Also, on May 16, 2012, the FAA published a final rule(correction) entitled 'Flightcrew Member Duty and Rest Requirements; correction to amend its existing prescriptive regulations. The new requirements are required to implement same regulations for domestic, flag and supplemental operations from January 4, 2014. EASA introduced a Notice of Proposed Amendment (NPA) 2010-14 entitled "Draft opinion of the European Aviation Safety Agency for a Commission Regulation establishing the implementing rules on Flight and Duty Time Limitations and Rest Requirements for Commercial Air Transport with aeroplanes" on December 10, 2010. The purpose of this NPA is to develop and implement fatigue management for commercial air transport operations. Comparing with Korean and foreign regulations regarding fatigue management, the provisions of ICAO, FAA, EASA are more considering various fatigue factors and conditions. Korea regulations should be needed for some development of insufficiency points. In this thesis, I present the results of the comparative study between domestic and foreign regulations in respect of fatigue management crew member. Also, I suggest legal proposals for amendment of Korea Aviation act and Enforcement Regulations concerning fatigue management for crew members. I hope that this paper is helpful to change korea fatigue regulations, to enhance aviation safety, and to reduce the number of accidents relating to fatigue. Fatigue should be managed at all level such as regulators, experts, operators and pilots. Authority should change surveillance mind-set from regulatory auditor to expert adviser. Operators should identify various fatigue factors and consider to crew scheduling them. Crews should strongly manage both individual and duty-oriented fatigue issues.

  • PDF