• Title/Summary/Keyword: pretensioned prestressed concrete

Search Result 26, Processing Time 0.032 seconds

Theoretical Determination of Transfer Length in Pretensioned Members Using Thick Cylinder Theory

  • Oh, Byung-Hwan;Kim, Eui-Sung
    • KCI Concrete Journal
    • /
    • v.12 no.2
    • /
    • pp.31-43
    • /
    • 2000
  • The extensive usage of pretensioned prestressed concrete component in modem construe- tion as structural members mandates precise understanding of its mechanism. Especially, an adequate transfer of prestressing force from steel tendons to concrete around the end regions of the member is a critical issue. Due to the importance of the topic, several investigators have formulated equations modeling the transfer bond length based on various bonding mechanism between steel and concrete. However, the existing models are still inadequate in predicting the bond development in pretensioned prestressed concrete members. Therefore, this study presents a model of transfer bond length based on rational theory that can simulate experimental results. The model is developed into solid mechanics based structural analysis computer program. The program is validated by comparing the analysis results with experimental results of bond stress distribution, concrete strain profiles, and transfer length in pretensioned prestressed concrete members. The proposed analytical procedure in this study can be utilized as a useful tool for realistic evaluation of transfer length in pretensioned prestressed concrete members.

  • PDF

Bond Characteristics of PS Strand around the End Zones of High Strength Pretensioned Prestressed Concrete Members (고강도 프리텐션 프리스트레스트 콘크리트 부재 단부 영역에서의 PS 강연선 부착특성 연구)

  • 김동백;김의성
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.3
    • /
    • pp.102-107
    • /
    • 2000
  • The extensive use of pretensioned prestressed concrete in the modem construction industry, together with wider application of pretensioned components for structural purposes requires some important consideration on the adequate transfer of prestress force into the concrete, especially around the end zones of pretensioned member. The main objective of this paper is to study the effects of various important parameters on the bond characteristics of prestressing strand around the end zone of high strength pretensioned concrete members. To this end, a comprehensive experimental program has been set up. The principal test variables considered were strand diameter, concrete strength, concrete cover size. The present study provides valuable test data for the realistic and accurate determination of transfer length, which can be efficiently used for improving the design equation of transfer length in pretensioned prestressed concrete members.

  • PDF

Derivation of Development Length in Pretensioned Prestressed Concrete Members (프리텐션공법의 프리스트레스트 콘크리트 부재의 정착길이 산정에 관한 실험 및 이론연구)

  • 오병환;김의성;최영철
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.6
    • /
    • pp.3-11
    • /
    • 2000
  • In pretensioned concrete structures, bond between prestressing steel and concrete is an essential component to ensure the integrity of a pretensioned member. The anchorage and development of the prestressing force depend exclusively on bond. The purpose of this study is to investigate the characteristics of bond and development length between pretensioned steel and concrete. To resolve the controversy over the adequacy of the current code provision on development length of prestressing strands, a comprehensive test program has been scheduled and twenty four rectangular prestressed concrete beams have been tested to determine development length. Major test variables include diameter of strands (12.7mm, 15.2mm) and concrete covers (3cm, 4cm, 5cm). The test results indicate that the development length based on the bond stress-slip relation. The proposed model can evaluate realistically the development length of pretensioned prestressed concrete members and can be the good basis for the future basis of code equations on development length of PSC members.

An Experimental Study on Influence of Concrete Strength and Cover Size on Transfer Length of Prestressing Strand in Pretensioned Prestressed Concrete Members (압축강도 및 피복두께에 따른 프리텐션 부재의 전달길이 변화에 관한 연구)

  • 오병환;김동백;김의성;최영철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.355-358
    • /
    • 1999
  • In recent times, large strands have become increasingly popular in the pretensioned prestressed industry and have found wide applications in varying geometries of sections. However, use of such elements and their behavior in several situations have been questioned with respect to anchoring of these strands in concrete. In addition, the experimental results available on bond are limited and information relating to large strands is rare. This study was conducted to determine the influence of some of the inadequately examined properties on transfer length of prestressing strand. The principle variables considered were strand size, concrete strength and clear bottom cover. The experimental results indicate clearly that concrete strength at transfer and cover size influence transfer length significantly. An attempt was made to suggest prediction equation for transfer length including above parameters.

  • PDF

Transfer length of 2400 MPa seven-wire 15.2 mm steel strands in high-strength pretensioned prestressed concrete beam

  • Yang, Jun-Mo;Yim, Hong-Jae;Kim, Jin-Kook
    • Smart Structures and Systems
    • /
    • v.17 no.4
    • /
    • pp.577-591
    • /
    • 2016
  • In this study, the transfer length of 2400 MPa, seven-wire high-strength steel strands with a 15.2 mm diameter in pretensioned prestressed concrete (PSC) beams utilizing high strength concrete over 58 MPa at prestress release was evaluated experimentally. 32 specimens, which have the variables of concrete compressive strength, concrete cover depth, and the number of PS strands, were fabricated and corresponding transfer lengths were measured. The strands were released gradually by slowly reducing the pressure in the hydraulic stressing rams. The measured results of transfer length showed that the transfer length decreased as the concrete compressive strength and concrete cover depth increased. The number of strands had a very small effect, and the effect varied with both the concrete cover depth and concrete strength. The results were compared to current design codes and transfer lengths predicted by other researchers. The comparison results showed that the current transfer length prediction models in design codes may be conservatively used for 2400 MPa high-strength strands in high-strength concrete beams exceeding 58 MPa at prestress release.

Finite Element Analysis of Transfer Length in Pretensioned Prestressed Concrete Members (프리텐션 PSC부재의 전달길이 해석 및 예측에 관한 연구)

  • Oh Byung-Hwan;Lim Si-Nae;Choi Young-Cheol
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.3 s.81
    • /
    • pp.293-302
    • /
    • 2004
  • The transfer of prestress force in pretensioned prestressed concrete (PSC) members is of great concern because it affects directly the distribution of stress around the transfer zone. The design provision of current design code on the transfer length considers only the prestress intensity and the diameter of prestressing steels. However, other factors such as concrete compressive strength and concrete cover may affect greatly the transfer length. The purpose of the present paper is to explore the various factors that affect the transfer length in pretensioned PSC members. The bond stress-slip relation between prestressing steel and concrete was modeled first from experimental data and then this model was incorporated into the interface element. The interface element was used to perform the finite element analysis for pretensioned PSC members. The results indicate that the compressive strength and concrete cover are also very important parameters which affect the transfer length greatly. This means that the current design code, which considers only the effective prestress and diameter of prestressing steel, must be improved to take into account the other important variables of compressive strength and concrete cover. The present study allows more realistic analysis and design of pretensioned PSC members.

Influence of Cover Size on Transfer Length of Prestressing Strand in Pretensioned Prestressed Ultra High Perfrmance Concrete Members (피복에 따른 초고성능 콘크리트 프리텐션부재의 응력전달길이 변화)

  • Park, Jong-Sup;Lee, Kyu-Wan;Kim, Byong-Suk;Joh, Chang-Bin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.95-96
    • /
    • 2009
  • In this paper, the transfer lengths in pretensioned prestressed Ultra High Performance Concrete members are verified to collect the basis data of UHPC increased in practical uses recently. The cover sizes and pretension forces were the main parameters of UHPC.

  • PDF

A Study on Ready-Mixed-Mortar for Prestressed Concrete grouting material (PC (Prestressed Concrete) 그라우트용 레미탈에 관한 연구)

  • 박길수;김경덕;이학봉;노현승;이완경
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.888-895
    • /
    • 2000
  • As conventional grouting materials for the sheath such as cement slurry or cement-mortar are mixed and pumped in site, those harden with bleeding or shrinkage and meets low compressive strength. Also the materials haven't always same cements, sand size distributions, additives in site, so those materials have unstable quality properties. We have studies on ready-mixed-mortar for grouting pretensioned or post-tensioned cables and rods to encapsulate the steel so that we have developed a formulation of specially selected, flowable, shrinkage-compensating materials.

  • PDF

Long Term Behavior and Analysis of Full Span Precast Segmental Bridge (풀스팬 프리캐스트 세그먼트 교량의 해석 및 장기거동 해석)

  • 오병환;채성태;정상화;박지언
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.434-441
    • /
    • 1999
  • The newly proposed Precast Segmental Mettled (PSM), which makes use of precast elements for election, is relatively new, efficient and fast mettled for the construction of prestressed box girder bridges. A precast segment of 25m long pretensioned in the fabrication yard is transported by a special trailer and a launching truss to its final position. The segments are then connected in the site by post-tensioning to make a continuous prestressed concrete box girder bridges. The purpose of this parer is to analyze and evaluate the design of precast prestressed concrete box girder bridges. The detailed analyses including time-dependent behavior of PSM bridges are conducted. The major results and findings, which have been obtained from finite element analysis of PSM bridge, are discussed in this paper and these results will be a good base for the design and analysis of a new precast bridges.

  • PDF