Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

Time-dependent Parametric Analyses of PSC Composite Girders for Serviceability Design (사용성 설계를 위한 PSC 합성거더교의 시간의존적 변수해석)

  • Youn, Seok-Goo;Cho, Sun-Kyu;Lee, Jong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5A
    • /
    • pp.823-832
    • /
    • 2006
  • To ensure the serviceability requirements of PSC composite girder bridges, it is essential to predict the stresses and deformations of the structure under service load conditions. Stresses and deformations vary continuously with time due to the effects of creep and shrinkage of concrete and relaxation of prestressing steel. The importance of these time-dependent effects is much more pronounced in precast prestressed concrete structures built in stages than in those constructed in one operation. In this paper, time-dependent analyses for PSC composite bridges using 30m standard girders have been conducted considering with the variation of the times of introducing initial prestressing forces and casting concrete. A computer program has been developed for the time-dependent analysis of simple or continuous PSC composite girders and parametric studies are conducted. Based on the numerical results, it is investigated the long-term behaviors of PSC composite girder bridges and discussed the limitations of the current codes for the prestress loss.

Fabrication Technique and Structural Performance Verification of PSC U-Type Segment Girder Using On-Site Pretension Method (현장 프리텐션 긴장 방식 적용 PSC U형 분절 거더 제작 기술 및 구조 성능 검증)

  • Sangki Park;Jaehwan Kim;Dong-Woo Seo;Ki-Tae Park;Hyun-Ock Jang
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.3
    • /
    • pp.17-26
    • /
    • 2023
  • Prestressed Concrete (PSC) girders are divided into pre- and post-tension types as prestressing method, and I- and U-type as cross-sectional shape. There are both advantages and disadvantages depending on each prestressing method and cross-sectional shape, and each method is applied to bridge construction sites. In this study, a new girder design was attempted to develop that overcomes its shortcomings by using the pretension method and U-type cross sectional shape. Its structural performance was verified in this study. Pretension type girders are mainly manufactured in factories because they require a reaction arm and related facilities, and have the disadvantage of being limited in weight and span length for road transportation. In addition, in the case of the U-type cross-section, structural stability is very reliable during construction against overturning, but its own weight is relatively large comparing to I-type, and the post-tension method is mainly applied after on-site production. In this study, a PSC girder manufacturing method using the field pretension was proposed and a span length of 40 m real-scale test specimen was manufactured and verified its structural performance.

Comparison of Future Dangerousness Prediction Models for Long-Term Behaviors of Concrete Cable-Stayed Bridges (콘크리트 사장교 장기거동에 대한 장래 위험성 예측 모델의 비교)

  • Lee, Hwan Woo;Kang, Dae Hui
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.3
    • /
    • pp.51-57
    • /
    • 2008
  • The long-term behaviors of prestressed concrete cable-stayed bridges are considerably influenced by the time dependant material characteristics such as creep and shrinkage. This study investigated the influences of the change of relative humidity by application of the CEB-FIP model and ACI model, which are generally used in the prediction of long-term behavior of concrete structures. In case of the moment of girder, CEB-FIP model predicted a bigger effect of relative humidity change than the ACI model. Furthermore, the effect was significant. Also, the long-term behaviors between these models were different each other even under the same material condition. Therefore, the prediction of the long-term behavior should be compensated after comparative analysis with the results of material tests of each construction site and between the different models.

  • PDF

Numerical Evaluation of Stress Loss Rates and Adjusting Coefficients due to Internal and External Constraints of Concrete Long-Term Deformation (콘크리트 장기변형의 내·외부 구속에 의한 응력 손실률 및 수정계수 평가의 전산구조해석)

  • Yon, Jung-Heum;Kim, Hyun-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.4
    • /
    • pp.429-438
    • /
    • 2013
  • An object oriented numerical analysis program of axial-flexural elements and the step-by-step method (SSM) has been developed to analyze concrete long-term behaviors of structures constrained internally and externally. The results of the numerical analysis for simple and continuous prestressed (PS) concrete box and composite girders, pre-cast slab of continuous steel composite girder, and simple preflex composite girder show that the adjusting coefficient decreases by increasing constraint. The loss rates of pre-tension force were not sensitive but those of pre-compression force were increased rapidly by decreasing adjusting coefficient. This indicates that the design based on the loss rate of pre-tension can over-estimate the pre-compression force in a concrete section constrained internally and externally. The adjusting coefficients which satisfy results of the numerical analysis are 0.35~0.95, and it can be used as an index of constraint of concrete long-term deformation. The adjusting coefficient 0.5 of Bridge Design Specifications can under-estimate residual stress of PS concrete slab, and the coefficient 0.7 or 0.8 of LRFD Bridge Designing Specifications can under-estimate the loss rates of continuous PS concrete girders. The adjusting coefficient of hybrid structures should be less then 0.4.

The Dynamics Responses of Railway Bridges Considering the Track Model (궤도모형에 따른 철도교량의 동적응답분석)

  • Kim, Sang-Hyo;Lee, Yong-Seon;Jung, Jun;Lee, Jun-Suk
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.715-720
    • /
    • 2002
  • The dynamic load effects, generated by moving trains, are transferred to the railway bridges through tracks. The dynamic load effects may vary due to the dynamic characteristics of the applied vehicle loads and the railway bridges including the track system. However, the track models have been neglected or simplified by spring elements in the most studies since it is quite complicated to consider the track systems in the dynamic analysis models of railway bridges. In this study track system on railway bridges are modeled using a three-dimensional discrete-support model that can simulate the load carrying behavior of tracks. A 40m simply supported prestressed concrete box-girder system adopted for high-speed railway bridges are modeled for simulation works. The train models are composed of 20 cars for KTX. The dynamic response of railway bridges are found to be affected depending on whether the track model is considered for not. The influencing rate depends on the traveling speed and different wheel-axle distance. The dynamic bridge response decreases remarkably by the track systems around the resonant frequency. Therefore, the resonance effect can be reduced by modifying the track properties in the railway bridge, especially for KTX trains.

  • PDF

Experimental Study on the Dynamic Response of Box Girder Long-Span Bridges under Various Travelling Vehicles (다양한 차량주행에 의한 박스형 장대교량의 동적 응답에 관한 실험적 연구)

  • Lee, Rae-Chul;Lee, Sang-Youl;Yhim, Sung-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.1
    • /
    • pp.129-138
    • /
    • 2004
  • In this study we determine a dynamic analysis of the existing two-span prestressed concrete box girder bridge subjected to moving vehicle loads using the experimental measurements. The moving loads applied in this paper are classified as general travelling, suddenly brake, continuous travelling, reversely travelling and reversely travelling impact loads for increasing velocities. For each travelling load, we search dynamic behaviors and characteristic in various measuring point of box girder section. In addition, the three-dimensional numerical results analyzed by the developed finite element program using flat shell element with six degrees of freedom per a node are compared with the measured experimental data. Dynamic behaviors caused impact loads by suddenly braking, reversely travelling, are bigger than by general travelling in box girder. Three-dimensional numerical results are better than one-dimensional results.

Behavior of Hollow Box Girder Using Unbonded Compressive Pre-stressing (비부착 압축 프리스트레싱을 도입한 중공박스 거더의 거동)

  • Kim, Sung Bae;Kim, Jang-Ho Jay;Kim, Tae Kyun;Eoh, Cheol Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.201-209
    • /
    • 2010
  • Generally, PSC girder bridge uses total gross cross section to resist applied loads unlike reinforced concrete member. Also, it is used as short and middle span (less than 30 m) bridges due to advantages such as ease of design and construction, reduction of cost, and convenience of maintenance. But, due to recent increased public interests for environmental friendly and appearance appealing bridges all over the world, the demands for longer span bridges have been continuously increasing. This trend is shown not only in ordinary long span bridge types such as cable supported bridges but also in PSC girder bridges. In order to meet the increasing demands for new type of long span bridges, PSC hollow box girder with H-type steel as compression reinforcements is developed for bridge with a single span of more than 50 m. The developed PSC girder applies compressive prestressing at H-type compression reinforcements using unbonded PS tendon. The purpose of compressive prestressing is to recover plastic displacement of PSC girder after long term service by releasing the prestressing. The static test composed of 4 different stages in 3-point bending test is performed to verify safety of the bridge. First stage loading is applied until tensile cracks form. Then in second stage, the load is removed and the girder is unloaded. In third stage, after removal of loading, recovery of remaining plastic deformation is verified as the compressive prestressing is removed at H-type reinforcements. Then, in fourth stage, loading is continued until the girder fails. The experimental results showed that the first crack occurs at 1,615 kN with a corresponding displacement of 187.0 mm. The introduction of the additional compressive stress in the lower part of the girder from the removal of unbonded compressive prestressing of the H-type steel showed a capacity improvement of about 60% (7.7 mm) recovery of the residual deformation (18.7 mm) that occurred from load increase. By using prestressed H-type steel as compression reinforcements in the upper part of cross section, repair and rehabilitation of PSC girders are relatively easy, and the cost of maintenance is expected to decrease.

Evaluation on Static Behavior of Long Span Prestressed Concrete Deck (장지간 프리스트레스트 콘크리트 바닥판의 정적 거동 평가)

  • Joo, Sanghoon;Chung, Chulhun;Lee, Hanjoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.969-977
    • /
    • 2016
  • In this paper, the static load test of long span PSC deck used in the twin steel plate girder bridge was conducted. To evaluate the structural behavior of long span deck, longitudinally sufficient length of deck is needed, but it is difficult to test the full-scale long span deck due to limit of transportation, setting and laboratory space. Therefore, this study proposed a method to apply longitudinal stiffness of the full-scale deck to the test specimen of longitudinally short length, and it was reinforced with the steel beam. The failure behavior and structural performance of the long span deck were evaluated by the proposed test specimen deck.

Evaluation of Buckling in Prestressed Composite Truss Girder using ADINA Structure Analysis (ADINA 구조해석을 이용한 PCT 거더교 좌굴 평가에 관한 연구)

  • Kim, Eui Soo;Kim, Jong Hyuk
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.11
    • /
    • pp.1415-1421
    • /
    • 2013
  • Recently, to resolve problems regarding legal liability for accidents and disasters, various simulation techniques such as F.E.M. and F.V.M. have been used in the field of forensic engineering. In this study, we performed mechanical structure analysis using ADINA to investigate the cause of bridge collapse accidents. Such accidents occurred owing to modified and missing processes in comparison with the original design while filling with concrete. Modified and missing processes cause buckling of the upper plate and twisting of the main girder. Through this study, we determine the exact cause of bridge collapse by comparing the evaluation of the structure stability of the original design with the evaluation of the structure stability of the modified and missing process using ADINA structure analysis. Hence, this result indicates that buckling prediction through FEA is the most effective method.