• Title/Summary/Keyword: pressure-settlement

Search Result 477, Processing Time 0.023 seconds

Performance Evaluation of Full Scale Reinforced Subgrade for Railroad with Rigid Wall Under Static Load (정하중 재하 시 실물 강성벽 일체형 철도보강노반의 성능평가)

  • Kim, Dae-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.3
    • /
    • pp.31-42
    • /
    • 2015
  • The Reinforced subgrade for railroad (RSR) was constructed for one way railway line with the dimension of 5 m high, 6 m wide and 20 m long to evaluate its performance under train design load. The RSR has characteristics of short length (0.3-0.4 H) of reinforcement and rigid wall, 30 and 40 cm vertical spacing of reinforcement installation. To enhance economics and constructability, three kinds of connections (welding, hinge & bolt, bold wire) were also designed to realize the integration between rigid wall and reinforced subgrade. Two times of static loading tests were done on the full size railroad subgrade. The maximum applied pressure was 0.98 MPa (the maximum test load 5.88 MN), which corresponds to 19.6 times of the design load for railroad subgrade, 50 kPa. The performance on the RSR was evaluated with the safety on the failure, subgrade bearing capacity and settlement, horizontal displacement of wall, and reinforcement strain. Based on the full scale test, we confirmed that the RSR with the conditions of 0.35 H (35% of height) short reinforcement length, hinge & bolt type connection for integration between rigid wall and reinforced subgrade, and 40cm vertical spacing of reinforcement installment shows good performance under train design load.

Study on the Estimation of Safety Zone and the Movement of Ground at the Inter-Crossing Tunnel (교차터널에서의 지반거동 및 안전영역평가에 관한 연구)

  • Kim, Woo-Sung;Yoo, Dong-Uk;Lee, Sang-Eun
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.491-502
    • /
    • 2008
  • A certain range of the original ground around the tunnel should be preserved to ensure structural safety of the tunnel when other structures are made around the tunnel, and thus this range is defined as safety zone of the tunnel. The main points to ensure the stability of an existing tunnel when constructing a new tunnel in an inter-crossing area are distance between two tunnels, size of the new tunnel, excavation method for the new tunnel, ground condition around the tunnel, and lining type of the existing tunnel etc. When the new tunnel is excavated above the existing tunnel, the existing tunnel is likely to suffer deformation at a crown zone, damage of arching effect, and live load of the new tunnel etc. On the other hand, when the new tunnel is excavated below the existing tunnel, the existing tunnel is likely to be damaged due to settlement. This study has been made on the behavior of the existing tunnel by means of model test and numerical analysis when the new tunnel is excavated below the existing tunnel. Safety zone of the tunnel was estimated by the results of strength/stress ratio obtained from numerical analysis, and the movement of ground was estimated by the model test. The results of earth pressure, ground displacements, and convergence of the tunnel obtained from model test were compared with those of numerical analysis, and show a similar trend.

Geotechnical investigation on causes and mitigation of ground subsidence during underground structure construction (터널 및 지중매설물 시공에 따른 지반함몰 발생 원인 및 대책에 대한 지반공학적 조사 연구)

  • Choi, Shin-Kyu;Back, Seung-Hun;An, Jun-Beom;Kwon, Tae-Hyuk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.143-154
    • /
    • 2016
  • This study investigated the occurrences, causes, and mitigation of the recent ground subsidence and underground cavity generation events in Korea. Two main causes of ground subsidence are (1) the soil erosion by seepage during tunneling and earth excavation and (2) the damage of underground pipes. The main cause of the soil erosion during tunneling was the uncontrolled groundwater flow. Especially, when excavating soft grounds using a tunnel boring machine (TBM), the ground near TBM operation halt points were found to be the most vulnerable to failure. The damage of underground pipes was mainly caused by poor construction, material deterioration, and differential settlement in soft soils. The ground subsidence during tunneling and earth excavation can be managed by monitoring the outflow of groundwater and eroded soils in construction sites. It is expected that the ground subsidence by the underground pipe damage can be managed or mitigated by life cycle analysis and maintenance of the buried pipes, and by controlling the earth pressure distribution or increasing the bearing capacity at the upper ground of the buried pipes.

Analysis of River Levee Failure Mechanism by Piping and Remediation Method Evaluation (파이핑에 의한 하천제방 붕괴 메카니즘 분석 및 대책공법 평가)

  • Kim, Jin-Man;Moon, In-Jong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.600-608
    • /
    • 2017
  • The presence of piping in a levee body allows water seepage to occur by producing a large cavity or water tunnel within it, ultimately resulting in the failure of the river levee and differential settlement. In order to properly cope with river levee failure due to piping and establish a proper remediation method for this problem, it is necessary to analyze the failure mechanism of the river levee due to piping. Therefore, this study analyzed the shape and mechanism of river levee failure due to piping through small-scale and large-scale models and evaluated the seepage pressure distribution characteristics in the hydraulic well, which has been suggested as a remediation method for piping. According to the results of this study, as the safety factor for the piping in the river levee decreased, the river levee failure shape was more clearly shown through the small-scale model test. In the large-scale model test, the type of local damage to the levee due to the piping was identified and the evaluation showed that the hydraulic well had the largest effect on the inhibition of piping below the center of the well. A follow-up study is needed to confirm the reliability of the results. However, it is thought that this study can be utilized as the baseline data for research into the piping-induced river levee failure mechanism and for the preparation of a remediation method.

Numerical Analysis of Multi-dimensional Consolidation Based on Non-Linear Model (비선형 모델에 의한 다차원 압밀의 수치해석)

  • Jeong, Jin-Seop;Gang, Byeong-Seon;Nam, Gung-Mun
    • Geotechnical Engineering
    • /
    • v.1 no.1
    • /
    • pp.59-72
    • /
    • 1985
  • This paper deals with the numerical analysis by the (mite element method introducing Biot's theory of consolidation and the modified Cambridge model proposed by Roscoe school of Cambridge University as constitutive equation and using Christian-Boehner's technique. Especially, time interval and division of elements are investigated in vies of stability and economics. In order to check the validity of author's program, the program was tested with one-dimensional consolidation case followed by Terzaghi's exact solution and with the results of the Magnan's analysis for existing banking carried out for study at Cubzac-les-ports in France. The main conclusions obtained are summarized as follows: 1. In the case of one-dimensional consolidation, the more divided the elements are near the surface of the foundation, the higher the accuracy of the numerical analysis is. 2. For the time interval, it is stable to divide 20 times per 1-lg cycle. 3. At the element which has long drain distance, the Mandel-fryer effect appears due to time lag. 4. Lateral displacement at an initial loading stage predicted by author's program, in which the load was assumed as not concentrative. but rather in grid form, is well consistent with the value of observation. 5. The pore water pressure predicted by author's program has a better accordance with the value of observation compared with Magnan's results. 6. Optimum construction control by Matsuo-Kawamura's method is possible with the predicted lateral displacement and settlement by the program.

  • PDF

Analysis of behavior a River Levee based on the Earthquake Scenario (지진 시나리오 기반 하천 제방의 거동 변화 분석)

  • Kim, Jin-Man;Jin, Yoon-Hwa;Han, Heui-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.481-487
    • /
    • 2020
  • This study examined the behavior change of river levees during an earthquake by numerical analysis. Unlike conventional research using artificial earthquake waves, earthquake analysis was performed using real earthquake waves. The behavior of a river levee before and after an earthquake was compared and analyzed quantitatively. Studies show that the river levee has a safety factor of approximately 28.5% due to an earthquake. On the other hand, the minimum standard safety factor is satisfied. Vertical effective stress has decreased by 81.8% due to excess pore-water pressure generated by the earthquake. In addition, liquefaction occurs in most of the foundation soil. An examination of the stress-displacement behavior due to the earthquake revealed a large amount of settlement in the backfill layer. Most of the foundation soil yielded. Therefore, the target river levee is quite vulnerable to earthquakes. Through the results of this study, the necessity of refreshing the seismic design standards for river levees is required. This study can be used as basic data for estimating the approximate damage level and vulnerable areas.

Piping Analysis of Reservoir Embankment due to Leakage of Buried Box Culvert (저수지 제체 내 배수통관의 누수로 인한 파이핑 분석)

  • Kim, Han il;Yang, Hak Young;Kim, Young Muk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.787-799
    • /
    • 2017
  • Although the long-term leakage between the box culvert and the soil contact surface is one of the main causes of the failure in the embankment of the reservoir, there is a little studies on this matter. If a leakage occurs by the structure such as the buried box culvert of reservoir embankment is partially damaged, it is difficult to observe and there is a possibility of damage caused by piping. For these reasons, more research is necessary. In this study, the embankment type of the reservoir is divided into the core type and the homogeneous type when the damaged box culvert passing through the embankment of the reservoir is leaked due to the differential behavior of materials like differential settlement. In view of the condition, the seepage analysis of 2D was performed according to the water level change. The result of the study shows that the possibility of piping increases at the upper part rather than the bottom part of the box culvert when the leakage occurs to the box culvert passing through the embankment of the reservoir. Particularly, it is considered that the presence of the core helps to maintain the seepage stability of the embankment in case where the leakage occurs at the downstream side of the embankment. Also, if there is a drastic decrease on the internal pore water pressure in the embankment of reservoir, it is necessary to consider the possibility of piping.

Investigation of Pohang Earthquake Liquefaction Using 1D Effective-Stress Site Response Analysis (1차원 유효응력개념의 지반응답해석을 통한 포항지진의 액상화 현상 규명)

  • Ahn, Jae-Kwang;Baek, Woo-Hyun;Choi, Jae-Soon;Kwak, Dong Youp
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.8
    • /
    • pp.37-49
    • /
    • 2018
  • Since the observation of ground motions in South Korea, liquefaction manifestation was the first to be observed in Pohang earthquake in 2017 with $M_L$ 5.4. Because liquefaction causes ground settlement and lateral spread damaging in-ground or super structures, various researchers have been analyzing the Pohang liquefaction case history to better understand and predict liquefaction consequence and to prevent future disasters. In prior research at the 2018 EESK conference, a map of Liquefaction Potential Index (LPI), indicating the severity of liquefaction, in Pohang was created and compared with damage observations. The LPI correlated well with the observations, but the severity categorized by LPI range was significantly higher than the actual observations in most regions. The prior LPI map was created evaluating ground motions using the simplified approach. In this research, we perform the effective site response analyses with porewater pressure generation model for the detailed evaluation of liquefaction on the liquefied sites in Pohang. We found that the simplified approach for LPI evaluation can overestimate the severity.

A experimental Feasibility of Magnetic Resonance Based Monitoring Method for Underground Environment (지하 환경 감시를 위한 자기공명 기반 모니터링 방법의 타당성 연구)

  • Ryu, Dong-Woo;Lee, Ki-Song;Kim, Eun-Hee;Yum, Byung-Woo
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.596-608
    • /
    • 2018
  • As urban infrastructure is aging, the possibility of accidents due to the failures or breakdowns of infrastructure increases. Especially, aging underground infrastructures like sewer pipes, waterworks, and subway have a potential to cause an urban ground sink. Urban ground sink is defined just as a local and erratic collapse occurred by underground cavity due to soil erosion or soil loss, which is separated from a sinkhole in soluble bedrock such as limestone. The conventional measurements such as differential settlement gauge, inclinometer or earth pressure gauge have a shortcoming just to provide point measurements with short coverage. Therefore, these methods are not adequate for monitoring of an erratic subsidence caused by underground cavity due to soil erosion or soil loss which occurring at unspecified time and location. Therefore, an alternative technology is required to detect a change of underground physical condition in real time. In this study, the feasibility of a novel magnetic resonance based monitoring method is investigated through laboratory tests, where the changes of path loss (S21) were measured under various testing conditions: media including air, water, and soil, resonant frequency, impedance, and distances between transmitter (TX) and receiver (RX). Theoretically, the transfer characteristic of magnetic field is known to be independent of the density of the medium. However, the results of the test showed the meaningful differences in the path loss (S21) under the different conditions of medium. And it is found that the reflection coefficient showed the more distinct differences over the testing conditions than the path loss. In particular, input reflection coefficient (S11) is more distinguishable than output reflection coefficient (S22).

An Analysis of the Effect of PBD Discharge Capacity to Leave Period (방치기간에 따른 PBD의 통수능 효과 분석)

  • Lee, Keeyong;Park, Minchul;Jeong, Sangguk;Lee, Song
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.10
    • /
    • pp.39-49
    • /
    • 2011
  • Recently PBD method, one of acceleration of consolidation methods is used in the soft ground to shorten consolidation time for fast settlement during construction. It is economical and easy to work. Discharge capacity of PBD is sensitive in proportion to thickness of soft ground layer, and drainage of PBD declines due to disturbance effect in surrounding ground by mandrel used for vertical drainage setting and setting machines and type. Also, deviation of discharge capacity is large according to ground condition, construction condition and soil properties. In addition, when embankment loading is not conducted instantly after PBD setting due to rain or lack of embankment material supply, it causes leaving period problems. But cause and analysis of those problems for discharge capacity is lack. So, in this test, ground improvement and discharge capacity is investigated by implementing composite discharge capacity test for analysis of an effect factor of PBD discharge capacity with leaving period. After fixing the vertical drain on a cylindrical cylinder, put churned sample into the cylinder. Then leave 0day, 30day, 60day and 90day. And then, load following the loading step of 30, 70 and 120kPa using a pressure device. As a result, the longer leaving period, discharge capacity is reduced. It is caused by a decrease of discharge area caused by creep transformation moisture absorption of PBD filter after long leaving period.