• Title/Summary/Keyword: prefabricated steel structure

Search Result 51, Processing Time 0.019 seconds

Research on cold-formed steel connections: A state-of-the-art review

  • Qin, Ying;Chen, Zhihua
    • Steel and Composite Structures
    • /
    • v.20 no.1
    • /
    • pp.21-41
    • /
    • 2016
  • Cold-formed steel structures are increasingly attractive due to their benefits of good mechanical performance and constructional advantages. However, this type of construction is still not fully exploited as a result of the acknowledged difficulties involved in forming construction-efficient and cost-effective connections. Furthermore, there is a lack of information on the structural behavior of the cold-formed steel connections. In this study, the research on various cold-formed steel connections was comprehensively reviewed from both fundamental and structural points of view, based on the available experimental and analytical data. It reveals that the current design codes and guidelines for cold-formed steel connections tend to focus more on the individual bearing capacity of the fasteners rather than the overall structural behavior of the connections. Significant future work remains to be conducted on the structural performance of cold-formed steel connection. In addition, extensive previous research has been carried out to propose and evaluate an economical and efficient connection system that is obtained from the conventional connecting techniques used in the hot-rolled industry. These connecting techniques may not be suitable, however, as they have been adopted from hot-rolled steel portal frames due to the thinness of the sheet in cold-formed steels. The review demonstrates that with the increasing demand for cold-formed steel constructions throughout the world, it is crucial to develop an efficient connection system that can be prefabricated and easily assembled on site.

Experimental study on a new type of assembly bolted end-plate connection

  • Li, Shufeng;Li, Qingning;Jiang, Haotian;Zhang, Hao;Yan, Lei;Jiang, Weishan
    • Steel and Composite Structures
    • /
    • v.26 no.4
    • /
    • pp.463-471
    • /
    • 2018
  • The bolted end-plate beam-column connections have been widely used in steel structure and composite structure because of its excellent seismic performance. In this paper, the end-plate bolted connection is applied in the concrete structure, A new-type of fabricated beam-column connections with end-plates is presented, and steel plate hoop is used to replace stirrups in the node core area. To study the seismic behavior of the joint, seven specimens are tested by pseudo-static test. The experimental results show that the new type of assembly node has good ductility and energy dissipation capacity. Besides, under the restraint effect of the high-strength stirrup, the width of the web crack is effectively controlled. In addition, based on the analysis of the factors affecting the shear capacity of the node core area, the formula of shear capacity of the core area of the node is proposed, and the theoretical values of the formula are consistent with the experimental value.

A Study on the Structural Stability of Prefabricated Strut for Ground Excavation Construction (지반굴착용 조립식 버팀보의 구조 안정성에 관한 연구)

  • Lee, Ki-Sun;Kim, Doo-Hwan;Song, Kwan-Kwon;Kim, Seong-Pil;Kim, Jeong-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.75-83
    • /
    • 2018
  • In study, Structural stability was considered when applying the high strength strut method with improved general strut method. considered whether there is sufficient stiffness to so as not buckling to the maximum hypothetical earth pressure. also structure stability of the strut component was reviewed. The high strength strut method is a technique used in place of the general strut method. high strength prefabricated Strut method is a technique that has bolt holes drilled in the upper flange at regular intervals. As a result of the buckling analysis, it was considered that the safety factor increased by about 5 %. also Since the stress generated is below the allowable stress, it is judged that structural stability of the strut is ensured. In particular, the safety factor of axial compressive stress increases about 16 % with use of high strength steel when applying the high strength prefabricated strut method. the high strength strut method is construction method may shorten the construction period and there is no expense to purchase additional materials.

Evaluation of Torsional Behaviour for the Catwalk System on A Suspension Bridge by Cross Bridge Interval (크로스 브릿지 간격에 따른 캣워크 시스템의 비틀림 거동 평가)

  • Lee, Ho;Kim, Ho Kyung;Kim, Gi Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.4
    • /
    • pp.371-376
    • /
    • 2015
  • This study was conducted for the torsional behavior of catwalk system which is a temporary structure on a suspension bridge. The torsional deformation of the catwalk structure has a significant effect on the workability and safety of workers during main cable erection. For this reason, the torsional deformation of catwalk is controlled to be acceptable levels below by adjusting the cross bridge interval in design stage. This study analyzed the effect of separation between cross bridge associated with twist safety of catwalk system. For the analytical approach, a detailed analysis model was created including cross bridge. Both wind load within the wind velocity range that allows the construction and eccentric load of Prefabricated Parallel Wire Strand were analyzed by analysis model. Result of study shows that separation between cross bridges has a significant effect on the torsional behavior of the catwalk.

A study on rotational behaviour of a new industrialised building system connection

  • Moghadasi, Mostafa;Marsono, Abdul Kadir;Mohammadyan-Yasouj, Seyed Esmaeil
    • Steel and Composite Structures
    • /
    • v.25 no.2
    • /
    • pp.245-255
    • /
    • 2017
  • The performance of an Industrialised Building System (IBS) consists of prefabricated reinforced concrete components, is greatly affected by the behaviour of the connection between beam and columns. The structural characteristics parameters of a beam-to-column connection like rotational stiffness, strength and ductility can be explained by load-rotation relationship of a full scale H-subframe under gravitational load. Furthermore, the connection's degree of rigidity directly influences the behaviour of the whole frame. In this research, rotational behaviour of a patented innovative beam-to-column connection with unique benefits like easy installation, no wet work, no welding work at assembly site, using a hybrid behaviour of steel and concrete, easy replacement ability, and compatibility with architecture was investigated. The proposed IBS beam-to-column connection includes precast concrete components with embedded steel end connectors. Two full-scale H-subframes constructed with a new IBS and conventional cast in-situ reinforced concrete system beam-to-column connections were tested under incremental static loading. In this paper, load-rotation relationship and ratio of the rigidity of IBS beam-to-column connection are studied and compared with conventional monolithic reinforced concrete connection. It is concluded that this new IBS beam-to-column connection benefits from more rotational ductility than the conventional reinforced concrete connection. Furthermore, the semi-rigid IBS connection rigidity ratio is about 44% of a full rigid connection.

Anti-seismic behavior of composite precast utility tunnels based on pseudo-static tests

  • Yang, Yanmin;Tian, Xinru;Liu, Quanhai;Zhi, Jiabo;Wang, Bo
    • Earthquakes and Structures
    • /
    • v.17 no.2
    • /
    • pp.233-244
    • /
    • 2019
  • In this work, we have studied the effects of different soil thicknesses, haunch heights, reinforcement forms and construction technologies on the seismic performance of a composite precast fabricated utility tunnel by pseudo-static tests. Five concrete specimens were designed and fabricated for low-cycle reciprocating load tests. The hysteretic behavior of composite precast fabricated utility tunnel under simulated seismic waves and the strain law of steel bars were analyzed. Test results showed that composite precast fabricated utility tunnel met the requirements of current codes and had good anti-seismic performance. The use of a closed integral arrangement of steel bars inside utility tunnel structure as well as diagonal reinforcement bars at its haunches improved the integrity of the whole structure and increased the bearing capacity of the structure by about 1.5%. Increasing the thickness of covering soil within a certain range was beneficial to the earthquake resistance of the structure, and the energy consumption was increased by 10%. Increasing haunch height within a certain range increased the bearing capacity of the structure by up to about 19% and energy consumption by up to 30%. The specimen with the lowest haunch height showed strong structural deformation with ductility coefficient of 4.93. It was found that the interfaces of haunches, post-casting self-compacting concrete, and prefabricated parts were the weak points of utility tunnel structures. Combining the failure phenomena of test structures with their related codes, we proposed improvement measures for construction technology, which could provide a reference for the construction and design of practical projects.

An Application of Precast Concrete System for Steel Framed Residential Buildings and PC Framed System for Parking Structure (철골조 아파트의 PC 공법 적용성 및 지하주차장의 골조 PC 공법)

  • 김영수;김정연;임인혁;김두영;장월선
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.903-910
    • /
    • 2000
  • Because the construction type SFRB is completely different in comparison with that of RC apartment the construction and work process, which are currently used, have to be changed. The main purpose of study is to analyze the difficulties of this construction and to apply the technology for other construction area. In this study, it is investigated to the problems of construction for SFRB and the construction method of PC panel fabricated on SFRB in Yongin goosng. Later, it is estimated prefabricated method had an great effect on PC panel System as lower cost and shorter schedule in SFRB. The Precast concrete framed System has many merit than the reinforced concrete structures system at constructability, structural safety and quality, therefore, it will be widely applied at parking structure in the future.

  • PDF

Design and behavior of 160 m-tall post-tensioned precast concrete-steel hybrid wind turbine tower

  • Wu, Xiangguo;Zhang, Xuesen;Zhang, Qingtan;Zhang, Dong;Yang, Xiaojing;Qiu, Faqiang;Park, Suhyun;Kang, Thomas H.K.
    • Steel and Composite Structures
    • /
    • v.44 no.3
    • /
    • pp.407-421
    • /
    • 2022
  • Prefabricated hybrid wind turbine towers (WTTs) are promising due to height increase. This study proposes the use of ultra-high performance concrete (UHPC) to develop a new type of WTT without the need to use reinforcement. It is demonstrated that the UHPC WTT structure without reinforcing bars could achieve performance similar to that of reinforced concrete WTTs. To simplify the design of WTT, a design approach for the calculation of stresses at the horizontal joints of a WTT is proposed. The stress distribution near the region of the horizontal joint of the WTT structure under normal operating conditions and different load actions is studied using the proposed approach, which is validated by the finite element method. A further parametric study shows that the degree of prestressing and the bending moment both significantly affect the principal stress. The shear-to-torsion ratio also shows a significant influence on the principal tensile stress.

Evaluation of Axial Behavior of Strengthened Columns according to Different Peripheral Closed Hoops in Jacket Section (확대단면에서 폐쇄형 외부 띠철근 배근 방법에 따른 보강기둥의 중심축하중 거동 평가)

  • Hwang, Yong-Ha;Yang, Keun-Hyeok;Sim, Jae-Il;Choi, Yong-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.7
    • /
    • pp.139-146
    • /
    • 2019
  • This study examined the effect of various arrangement methods for forming peripheral closed hoops in the jacket section on the axial behavior of section enlargement strengthening columns. Four types of peripheral closed hoops arranged in the jacket section were prepared as follows: 1) Closed connection of prefabricated bar units (column P); 2) V-clip installation across the overlapped legs of channel-type bars (column V); 3) Use of glass fiber mesh for an alternative of steel bars (column F); and 4) combination of prefabricated bar units and glass fiber mesh (column PF). The V-clip is designed to form the closed hoops in the jacket section using the overlapped channel-type bars, preventing the opening of the channel bar legs. The glass fiber mesh is to examine the feasibility to apply for closed hoops in the jacket section as an alternative for steel bars, considering the easy construction. In the jacket section of all the strengthened columns, V-ties were arranged for supplementary ties, avoiding the interruption of the existing column. The axial stiffness and strength of the strengthened columns were insignificantly affected by the arrangement methods of closed hoops in the jacket section. The axial ductility ratio of the strengthened columns P, V, and PF was enhanced more than twice of that measured in the non-seismic existing column. However, the column F exhibited a lower ductility than the other strengthened columns because of the fracture of the mesh at the ultimate strength of the column. The V-clip approach was favorable to enhance the ductility of the strengthened column, preventing the opening of the legs of channel-type bars.

The behaviour of a new type of connection system for light-weight steel structures applied to roof trusses

  • Kaitila, Olli;Kesti, Jyrki;Makelainen, Pentti
    • Steel and Composite Structures
    • /
    • v.1 no.1
    • /
    • pp.17-32
    • /
    • 2001
  • The Rosette-joining system is a completely new press-joining method for cold-formed steel structures. One Rosette-joint has a shear capacity equal to that of approximately four screws or rivets. The Rosette thin-walled steel truss system presents a new fully integrated prefabricated alternative to light-weight roof truss structures. The trusses are built up on special industrial production lines from modified top hat sections used as top and bottom chords and channel sections used as webs which are joined together with the Rosette press-joining technique to form a completed structure easy to transport and install. A single web section is used when sufficient but can be strengthened by double-nesting two separate sections or by using two lateral profiles where greater compressive axial forces are met. An individual joint in the truss can be strengthened by introducing a hollow bolt into the joint hole. The bolt gives the connection capacity a boost of approximately 20%. A series of laboratory tests have been carried out in order to verify the Rosette truss system in practice. In addition to compression tests on individual sections of different lengths, tests have also been done on small structural assemblies and on actual full-scale trusses of a span of 10 metres. Design calculations have been performed on selected roof truss geometries based on the test results, FE-analysis and on the Eurocode 3 and U.S.(AISI) design codes.