• 제목/요약/키워드: prefabricated precast concrete

검색결과 54건 처리시간 0.02초

Flexural behavior of partially prefabricated partially encased composite beams

  • Liang, Jiong-feng;Zhang, Liu-feng;Yang, Ying-hua;Wei, Li
    • Steel and Composite Structures
    • /
    • 제38권6호
    • /
    • pp.705-716
    • /
    • 2021
  • An innovative partially precast partially encased composite beam (PPECB) is put forward based on the existing research. In order to study the flexural performance of the new composite beam which has precast part and cast-in-place part, six prefabricated specimens and one cast-in-place specimen are designed with considering the influence of the production method, the steel flange thickness, the concrete strength grade and the stirrup process on the behavior of the composite beam. Through four points loading and test data collection and analysis, the behavior of partially prefabricated specimen is similar to that of cast-in-place specimen, and the casting method, the thickness of the steel flange, the concrete strength grade and the stirrup process have different influence on the crack, yield and peak load bearing capacity of the component. Finally, the calculation theory of plastic bending of partially precast partially encased concrete composite beams is given. The calculation results are in good agreement with the experimental results, which can be used for practical engineering theory guidance. This paper can provide reference value for further research and engineering application.

프리캐스트 콘크리트 대형 패널을 이용한 조립식 아파트 공사 (Prefabricated Apartments Project Using Precast Concrete Large Panel System)

  • 박의식
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1989년도 가을 학술발표회 논문집
    • /
    • pp.49-52
    • /
    • 1989
  • This report introduces the large scale prefabricated apartment project in Saudi Arabia designed and built by Hyundai Engineering and construction Co. as turn-key basis from ministry of Public works and ltousing of Saudi Arabia. This project using precast large panel system is 7,600 dwelling unit, total building area 1.8 mil sguare meters. Large panel system is a kind of industrialized building method which classified as monolithic system, total system and structural system. Hyundai Engineering and Construction Co. develop his own prefabricated large panel system for this project and named "HYUNDAI SYSTEM". The key point of this system is vertical and horizontal joints between panels. Also stability of whole building structure is especially important for this kind of prefabricated building. building.

  • PDF

Cracking of a prefabricated steel truss-concrete composite beam with pre-embedded shear studs under hogging moment

  • Gao, Yanmei;Zhou, Zhixiang;Liu, Dong;Wang, Yinhui
    • Steel and Composite Structures
    • /
    • 제21권5호
    • /
    • pp.981-997
    • /
    • 2016
  • To avoid the cracks of cast-in-place concrete in shear pockets and seams in the traditional composite beam with precast decks, this paper proposed a new type of prefabricated steel truss-concrete composite beam (ab. PSTC beam) with pre-embedded shear studs (ab. PSS connector). To study the initial cracking load of concrete deck, the development and distribution laws of the cracks, 3 PSTC beams were tested under hogging moment. And the crack behavior of the deck was compared with traditional precast composite beam, which was assembled by shear pockets and cast-in-place joints. Results show that: (i) the initial crack appears on the deck, thus avoid the appearance of the cracks in the traditional shear pockets; (ii) the crack of the seam appears later than that of the deck, which verifies the reliability of epoxy cement mortar seam, thus solves the complex structure and easily crack behavior of the traditional cast-in-place joints; (iii) the development and the distribution laws of the cracks in PSTC beam are different from the conventional composite beam. Therefore, in the deduction of crack calculation theory, all the above factors should be considered.

Research on rotation capacity of the new precast concrete assemble beam-column joints

  • Han, Chun;Li, Qingning;Wang, Xin;Jiang, Weishan;Li, Wei
    • Steel and Composite Structures
    • /
    • 제22권3호
    • /
    • pp.613-625
    • /
    • 2016
  • The joints of the new prefabricated concrete assemble beam-column joints are put together by the hybrid joints of inserting steel under post-tensioned and non-prestressed force and both beams and columns adopt prefabricated components. The low cyclic loading test has been performed on seven test specimens of beam-column joints. Based on the experimental result, the rotation capacity of the joints is studied and the $M-{\theta}$ relation curve is obtained. According to Eurocode 3: Design of steel structures and based on the initial rotational stiffness, the joints are divided into three types; by equivalent bending-resistant stiffness to the precast beam, the equivalent modulus of elasticity $E_e$ is elicited with the superposition method; the beam length is figured out that satisfies the rigid joints and after meeting the requirements of application and safety, the new prefabricated concrete assemble beam-column joints can be regarded as the rigid joints; the design formula adopted by the standard of concrete joint classification is theoretically derived, thereby providing a theoretical basis for the new prefabricated concrete structure.

Analysis of underground post-tensioned precast concrete box utility tunnel under normal fault displacement

  • Wu, Xiangguo;Nie, Chenhang;Qiu, Faqiang;Zhang, Xuesen;Hong, Li;Lee, Jong-Sub;Kang, Thomas H.K.
    • Computers and Concrete
    • /
    • 제29권2호
    • /
    • pp.69-79
    • /
    • 2022
  • For long underground box utility tunnels, post-tensioned precast concrete is often used. Between precast tunnel segments, sealed waterproof flexible joints are often specified. Fault displacement can lead to excessive deformation of the joints, which can lead to reduction in waterproofing due to diminished contact pressure between the sealant strip and the tunnel segment. This paper authenticates utilization of a finite element model for a prefabricated tunnel fault-crossing founded on ABAQUS software. In addition, material parameter selection, contact setting and boundary condition are reviewed. Analyzed under normal fault action are: the influence of fault displacement; buried depth; soil friction coefficient, and angle of crossing at the fault plane. In addition, distribution characteristics of the utility tunnel structure for vertical and longitudinal/horizontal relative displacement at segmented interface for the top and bottom slab are analyzed. It is found that the effect of increase in fault displacement on the splice joint deformation is significant, whereas the effects of changes in burial depth, pipe-soil friction coefficient and fault-crossing angle on the overall tunnel and joint deformations were not so significant.

조립식 프리캐스트 세그먼트 교각과 유사형식 교각에 대한 거동에 관한 연구 (A study on behavior for prefabricated precast segment and similar piers)

  • 정혁창;김익현;김태훈;김영진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 춘계 학술발표회 제20권1호
    • /
    • pp.33-36
    • /
    • 2008
  • 현재 우리나라에서 제작되고 있는 교량의 대부분은 RC 교각으로 이루어져 있다. 이러한 RC 교각은 현장 타설을 사용하고 있으며, 이에 따라서 작업환경과 계절에 따른 시공성의 결여와 품질의 저하, 길어진 공사기간에 따른 공사비에 대한 부담이 발생한다. 전체 교량에 대한 교각의 중요성을 인식하여 최근 들어 효율적이고 경제적인 건설방법을 개발하는 것에 맞춰지고 있다. 지난 몇 년간 우리나라를 비롯하여 몇몇 국가에서는 교량을 위해 조립식 프리캐스트 세그먼트 콘크리트 교량의 요소와 시스템의 조사, 개발 그리고 응용에 대한 관심이 증가되었다. 종래의 현장 타설 콘크리트 교량은 오랜 기간의 교통 혼잡을 발생시켜, 대도시 지역의 교량 건설은 바쁜 도시민들의 분열을 초래할 수가 있는데, 조립식 프리캐스트 세그먼트 콘크리트 교량은 그 문제에 대한 실용적인 해결방안이 될 수 있다. 우리나라의 경우 최근 들어 교각의 내진설계에 대한 내진상세 규정을 마련하기 위해서 노력해 왔다. 하지만 대부분의 내진설계와 관련된 내용은 RC 교각에 대한 내용이었으며, 조립식 프리캐스트 세그먼트 교각에 대한 내진상세 및 설계 지침에 대한 내용은 전무후무한 실정이다. 본 연구에서는 RC교각 1기, 프리스트레스트 교각 1기, 전단연결재가 없는 조립식 프리캐스트 세그먼트 교각 1기, 그리고 전단연결재가 있으며 PS강재의 긴장력의 변화를 둔 조립식 세그먼트 교각 3기에 대한 실험을 통해서 각각의 교각의 구조 특성을 파악하고자 한다.

  • PDF

Investigation of semi-rigid bolted beam connections on prefabricated frame joints

  • Irtem, E.;Turker, K.
    • Structural Engineering and Mechanics
    • /
    • 제12권4호
    • /
    • pp.397-408
    • /
    • 2001
  • Bolted connections are used commonly in the precast reinforced concrete structures. In such structures, to perform structural analysis, behaviour of connections must be determined. In this study, elastic rotation stiffness of semi-rigid bolted beam connections, applied in industrial precast structures, are determined by finite element methods. The results obtained from numerical solutions are compared with an experimental study carried out for the same connections. Furthermore, stress distributions of the connection zone are determined and a reinforcement scheme is proposed. Thus, a more appropriate reinforcement arrangement for the connection zone is enabled. The connection joint of the prefabricated frame is described as rigid, hinged or elastic, and a static analysis of the frame system is performed for each case. Values of bending moments and displacements obtained from the three solutions are compared and the effects of elastic connection are discussed.

Effect of vertical reinforcement connection level on seismic behavior of precast RC shear walls: Experimental study

  • Yun-Lin Liu;Sushil Kumar;Dong-Hua Wang;Dong Guo
    • Earthquakes and Structures
    • /
    • 제26권6호
    • /
    • pp.449-461
    • /
    • 2024
  • The vertical reinforcement connection between the precast reinforced concrete shear wall and the cast-in-place reinforced concrete member is vital to the performance of shear walls under seismic loading. This paper investigated the structural behavior of three precast reinforced concrete shear walls, with different levels of connection (i.e., full connection, partial connection, and no connection), subjected to quasi-static lateral loading. The specimens were subjected to a constant vertical load, resulting in an axial load ratio of 0.4. The crack pattern, failure modes, load-displacement relationships, ductility, and energy dissipation characteristics are presented and discussed. The resultant seismic performances of the three tested specimens were compared in terms of skeleton curve, load-bearing capacity, stiffness, ductility, energy dissipation capacity, and viscous damping. The seismic performance of the partially connected shear wall was found to be comparable to that of the fully connected shear wall, exhibiting 1.7% and 3.5% higher yield and peak load capacities, 9.2% higher deformability, and similar variation in stiffness, energy dissipation capacity and viscous damping at increasing load levels. In comparison, the seismic performance of the non-connected shear wall was inferior, exhibiting 12.8% and 16.4% lower loads at the yield and peak load stages, 3.6% lower deformability, and significantly lower energy dissipation capacity at lower displacement and lower viscous damping.

Introducing a precast moment resistant beam-to-column concrete connection comparable with in-situ one

  • Esmaeili, Jamshid;Ahooghalandary, Neyram
    • Computers and Concrete
    • /
    • 제23권3호
    • /
    • pp.203-215
    • /
    • 2019
  • Precast reinforced concrete structure (PRCS) consists of prefabricated members assembled at worksites and has more connections limitations in comparison with the equivalent in-situ reinforced concrete structure (IRCS). As a result of these limitations, PRCSs have less ductility in comparison with IRCSs. Recent studies indicate that the most noticeable failure in PRCSs have occurred in their connection zone. The objective of this study is introducing a type of precast beam-to-column connection (PBC) which in spite of being simple is of the same efficiency and performance as in-situ beam-to-column connection (IBC). To achieve this, the performance of proposed new PBC at exterior joint of a four story PRCS was analyzed by pseudo dynamic analysis and compared with that of IBC in equivalent IRCS. Results indicated that the proposed connection has even better performance in terms of strength, energy dissipation and stiffness, than that of IBC.

급속시공형 프리캐스트 합성교각의 성능 (Performance of Precast Composite Piers for Fast Construction)

  • 심창수;정영수;윤재영;박지호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 춘계 학술발표회 제20권1호
    • /
    • pp.221-224
    • /
    • 2008
  • 조립식 교각을 교량의 하부구조에 적용하는 다양한 기술들이 최근에 활발히 개발되고 있다. 이 논문에서는 프리스트레스를 필요로 하지 않는 형태의 프리캐스트 합성교각을 제안하였다. 낮은 강재비를 갖는 합성교각의 정적 및 내진성능 평가에 기반하여 교각 단면을 설계하고 기초부와의 연결상세는 교각 단면이 기초부로 일부 매입된 상태에서 볼트 연결로 설계하여 설계의 단순화를 도모하였다. 새롭게 제안된 프리캐스트 합성교각에 대한 구조적 성능을 검증하기 위해 준정적실험을 수행하였다. 실험을 통하여 정적 성능과 내진성능을 함께 평가하고 기존의 현장타설 합성교각의 거동과 비교를 수행하였다. 프리캐스트로 제작할 경우에 기초와 만나는 교각 끝단의 보강 상세가 요구되고 이와 관련한 상세 제안사항을 도출하였다.

  • PDF