• Title/Summary/Keyword: precedence

Search Result 383, Processing Time 0.023 seconds

APPLICATION OF CONSTRAINT LOGIC PROGRAMMING TO JOB SEQUENCING

  • Ko, Jesuk;Ku, Jaejung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.617-620
    • /
    • 2000
  • In this paper, we show an application of constraint logic programming to the operation scheduling on machines in a job shop. Constraint logic programming is a new genre of programming technique combining the declarative aspect of logic programming with the efficiency of constraint manipulation and solving mechanisms. Due to the latter feature, combinatorial search problems like scheduling may be resolved efficiently. In this study, the jobs that consist of a set of related operations are supposed to be constrained by precedence and resource availability. We also explore how the constraint solving mechanisms can be defined over a scheduling domain. Thus the scheduling approach presented here has two benefits: the flexibility that can be expected from an artificial intelligence tool by simplifying greatly the problem; and the efficiency that stems from the capability of constraint logic programming to manipulate constraints to prune the search space in an a priori manner.

  • PDF

Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building (공동주택 하자감정업무 표준절차개발을 위한 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF

A Term-based Language for Resource-Constrained Project Scheduling and its Complexity Analysis

  • Kutzner, Arne;Kim, Pok-Son
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.12 no.1
    • /
    • pp.20-28
    • /
    • 2012
  • We define a language $\mathcal{RS}$, a subclass of the scheduling language $\mathcal{RS}V$ (resource constrained project scheduling with variant processes). $\mathcal{RS}$ involves the determination of the starting times for ground activities of a project satisfying precedence and resource constraints, in order to minimize the total project duration. In $\mathcal{RS}$ ground activities and two structural symbols (operators) 'seq' and 'pll' are used to construct activity-terms representing scheduling problems. We consider three different variants for formalizing the $\mathcal{RS}$-scheduling problem, the optimizing variant, the number variant and the decision variant. Using the decision variant we show that the problem $\mathcal{RS}$ is $\mathcal{NP}$-complete. Further we show that the optimizing variant (or number variant) of the $\mathcal{RS}$-problem is computable in polynomial time iff the decision variant is computable in polynomial time.

International Conference of Consumer Protection Issues on B2C in APEC (APEC 국가의 전자상거래 소비자보호 현황과 개선방안)

  • Jun, Eui-Cheon;Kim, Jang-Ho;Kim, Seog-Min
    • International Commerce and Information Review
    • /
    • v.4 no.2
    • /
    • pp.27-46
    • /
    • 2002
  • Nowadays, the explosive evolvement of Internet. which is referred to as EC, has been prevailing. That has given the chance all of the world consumers to contact all of the world companies to enter into business relationship. But, electronic commerce laws have been established per conventional jurisdiction. some legal issues take place in the field of cross-border electronic commerce, including the governing law and competent courts. In this situations, it is gradually and widely required to lay down the internationally harmonized electronic commerce legal framework. Now, there are a lot of legal issues assumed in EC, in this study, we studied three precedence problems concerning B2C: Consumer Protection Law regarding B2C, Personal Information Protection Law in Private Sector regarding B2C, Web Site Trust Mark System.

  • PDF

Implementation of Real-Time Communication in CAN for Humanoid Robot (CAN 기반 휴머노이드 로봇에서의 실시간 데이터 통신의 구현)

  • Kwon, Sun-Ku;Huh, Uk-Youl;Kim, Jin-Geol
    • Proceedings of the KIEE Conference
    • /
    • 2005.10b
    • /
    • pp.246-248
    • /
    • 2005
  • The Controller Area Network (CAN) is being widely used for real-time control application and small-scale distributed computer controller systems. However, CAN may exhibit unfair behavior under heavy traffic conditions. When there are both high and low priority messages ready for transmission, the proposed precedence priority filtering method allows one low priority message to be exchanged between any two adjacent higher priority messages. In this way, the length of each transmission delays is upper bounded. These procedures are implemented as local controllers for the ISHURO (Inha Semyung Humanoid RObot).

  • PDF

A Naural Network-Based Computational Method for Generating the Optimized Robotic Assembly Sequence (자동조립에서의 신경회로망의 계산능력을 이용한 조립순서 최적화)

  • 홍대선;조형석
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.7
    • /
    • pp.1881-1897
    • /
    • 1994
  • This paper presents a neural network-based computational scheme to generate the optimized robotic assembly sequence for an assembly product consisting of a number of parts. An assembly sequence is considered to be optimal when it meets a number of conditions : it must satisfy assembly constraints, keep the stability of in-process subassemblies, and minimize assembly cost. To derive such an optimal sequence, we propose a scheme using both the Hopfield neural network and the expert system. Based upon the inferred precedence constraints and the assembly costs from the expert system, we derive the evolution equation of the network. To illustrate the suitability of the proposed scheme, a case study is presented for industrial product of an electrical relay. The result is compared with that obtained from the expert system.

Manufacturing Feature Extraction for Sculptured Pocket Machining (Sculptured 포켓 가공을 위한 가공특징형상 추출)

  • 주재구;조현보
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.455-459
    • /
    • 1997
  • A methodology which supports the feature used from design to manufacturing for sculptured pocket is newly devlored and present. The information contents in a feature can be easily conveyed from one application to another in the manufacturing domain. However, the feature generated in one application may not be directly suitable for another whitout being modified with more information. Theobjective of the paper is to parsent the methodology of decomposing a bulky feature of sculptured pocket to be removed into compact features to be efficiently machined. In particular, the paper focuses on the two task: 1) to segment horizontally a bulky feature into intermediate features by determining the adequate depth of cut and cutter size and to generate the temporal precedence graph of the intermediate features and 2)to further decompose each intermediate feature vertical into smaller manufacturing features and to apply the variable feed rate to each small feature. The proposed method will provid better efficiency in machining time and cost than the classical method which uses a long string of NC codes necessary to remove a bulky fecture.

  • PDF

Optimal Period and Priority Assignment Using Task & Message-Based Scheduling in Distributed Control Systems (분산 제어 시스템에서의 태스크와 메시지 기반 스케줄링을 이용한 최적 주기와 우선순위 할당)

  • 김형육;이철민;박홍성
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.8 no.6
    • /
    • pp.506-513
    • /
    • 2002
  • Distributed control systems(DCS) using fieldbus such as CAN have been applied to process systems but it is very difficult to design the DCS while guaranteeing the given end-to-end constraints such as precedence constraints, time constraints, and periods and priorities of tasks and messages. This paper presents a scheduling method to guarantee the given end-to-end constraints. The presented scheduling method is the integrated one considering both tasks executed in each node and messages transmitted via the network and is designed to be applied to a general DCS that has multiple loops with several types of constraints, where each loop consists of sensor nodes with multiple sensors, actuator nodes with multiple actuators and controller nodes with multiple tasks. An assignment method of the optimal period of each loop and a heuristic assignment rule of each message's priority are proposed and the integrated scheduling method is developed based on them.

Research on the assessment of the risk factors of serious railway accidents (철도 중대사고의 위험지수 추정에 관한 연구)

  • Han, Soon-Woo;Cho, Yun-Ok;Yoon, Hyuk-Jin;Kim, Sang-Ahm
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1871-1876
    • /
    • 2007
  • To establish the national railway safety system, the railway total safety technology development project has been promoted by Ministry of Construction and Transportation (MOCT) since August 2004. The project has producted successful results in many areas of railway safety, however, it is required that the research field should be re-examined to meet the aim of the project. To do that, the precedence of the investment of research resources should be reviewed and determined. The risk of serious railway accidents such as train collision, derailment and level crossing accidents are estimated. From the estimation result and the statistics on the railway accidents over fast few years, the risk factors of railway accidents can be calculated.

  • PDF

Marine Engine State Monitoring System using DPQ in CAN Network (CAN의 분산 선행대기 열 기법을 이용한 선박 엔진 모니터링 시스템)

  • Lee, Hyun;Lee, Jun-Seok;Lee, Jang-Myung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.1
    • /
    • pp.13-20
    • /
    • 2012
  • This paper proposes a marine engine state monitoring system using a DPQ (Distributed Precedence Queue) mechanism which collects the state of bearings, temperature and pressure of engine through the CAN network. The CAN is developed by Bosch Corp. in the early 1980' for automobile network. The data from various sensors attached in the marine engine are converted to digital by the analog to digital converter and formatted to fit the CAN protocol at the CAN module. All the CAN modules are connected to the SPU (Signal Processing Unit) module for the efficient communication and processing. This design reduces the cost for wiring and improves the data transmission reliability by recognizing the sensor errors and data transmission errors. The DPQ mechanism is newly developed for the performance improvement of the marine engine system, which is demonstrated through the experiments.